Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01777
StatusFinaled
Name AIRPORT (CONCOURSE "A" EXT STAIR)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-CONCOURSE A
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - CONCOURSE "A" EXTERIOR STAIRWAY AND TEMPORARY PATHWAY STRUCTURES) Fire sprinklers are used for area increase of the Airport Terminal. The existing "jetways" (aircraft loading walkways) at Gates #8 and #9 are being removed (Concourse "A"). An exterior stairway is being constructed at Gate #9. Temporary pathway structures for passengers are being constructed at ground level to provide protection from weather and to "corral" passengers away from the airplanes and other hazards. They ARE NOT intended to protect the public from construction debris. These structures will also provide a lighted pathway to the vicinity of the airplanes. For the pathway structures, "temporary" is defined as 180 days. This time limit is renewable at the discretion of the Building Department. All reconfigurations of the pathway structures shall be submitted to the Building Department and approved prior to placement. All work shall be according to the approved drawings, engineering, and plan review conditions on file. THE PATHWAY STRUCTURES ARE NOT REQUIRED TO BE FIRE SPRINKLERED. DRH99-00206 CUP99-00130 PC-478-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/21/20006/21/20004/18/2001 DONE
JV for payment
Letter of compliance  1/9/2001 DONE
Letter of Compliance #21318 issued 1-9-01.
BLD-Final1/5/20011/8/20011/8/2001PPASS
DetailsJim Storey
FN OCC ROB-- ###-#### OK FOR L/C CARD WITH CONTRACTOR. 1/8/2001 11:51:37 AM
BLD-Final1/4/20011/5/20011/5/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/04/2001 at 10:51:55. Contact: ###-####.
Inspection Record Card- Bld  1/5/2001 DONE
Print Occupancy Form  1/5/2001 DONE
BLD-Final11/30/200011/30/200011/30/2000PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/2000 at 07:38:40. Contact: ###-####. need change from arc. for canopy to metal covering from approved cloth. 11/30/2000 1:21:10 PM
FIRE-Final Inspection9/15/20009/15/20009/15/2000APASS
DetailsRick Jackson
###-#### per card final okay for c/o.mps
BLD-Final9/14/20009/14/20009/14/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/14/2000 at 11:10:35. Contact: ###-####. west walkway ok. 9/14/2000 3:15:49 PM
BLD-Final9/13/20009/13/20009/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/13/2000 at 08:25:38. Contact: ###-####. walkways ok stairs and handrails ok pending canopys. 9/13/2000 5:40:00 PM
BLD-Final9/5/20009/6/20009/6/2000APART
Details
Scheduled by a contractor via Hello! on 09/05/2000 at 15:14:59. Contact: ###-####. ok for temp on the west area stairs. detail 3 on a/7 to be followed 9/6/2000 9:40:29 AM
FIRE-Sprinkler Rough-in9/1/20009/5/20009/5/2000APASS
DetailsRick Jackson
ANN ###-#### FIRE R/I
BLD-Final9/5/20009/5/20009/5/2000PPART
Details
Scheduled by a contractor via Hello! on 09/05/2000 at 09:05:03. Contact: ###-####. still need insp of the landing for the first phase stairs 9/5/2000 3:10:33 PM
Code Occupancy Approval  9/5/2000 PASS
SIGNED FINAL OCCUPANCY AS NO REAL OUTSIDE WORK HERE.
BLD-Framing/Rough-in9/1/20009/1/20009/1/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/01/2000 at 11:05:54. Contact: ###-####.
Issue PAID IN FULL permit  8/3/2000 DONE
Inspection Record Card- Bld  8/2/2000 DONE
Print Occupancy Form  8/2/2000 DONE
Telephone call  8/2/2000 DONE
called permit ready and fees due
Plan assigned to (CJW)6/22/2000 8/1/2000 PASS
DetailsCarl Westfall
8/1/00 15:44:16 CJW - activity updated through activity BLDA022 from case BLD00-01777.
Routing - PLAN CHECK7/28/2000 8/1/2000 PASS
Plan Reviewer's activity  8/1/2000 PASS
Drawings approved, with conditions, after resubmittal review. See conditions list.
PLANS/APPL TAKEN TO FRONT DESK  8/1/2000 PASS
Routing - FIRE7/24/20007/27/20007/27/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  7/27/2000  
Plan resubmittals received  7/25/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM CSHQA TWO SETS OF SHEETS A1.1W,A2.7 AND A1.2W, FORWARDED SAME TO CARL WESTFALL. 7/25/00 DAR
Routing - PLANNING  7/24/2000 PASS
Routing - PLAN CHECK6/23/2000 7/19/2000  
1st review failed.
Plan Reviewer's activity  7/17/2000  
UBC plan review started July 17, 2000 and finished July 19, 2000. A response from the architect is required. See the conditions list. The plan review was delayed because of a "green tag" project (Ada County Courthouse) that was submitted before this one and needed attention first.
Routing - PUBLIC WORKS6/22/2000 6/23/2000 PASS
Plan routing begun/TENANTS  6/22/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Application received  6/21/2000  
Plans ACCEPTED BY PLAN TECH  6/21/2000 DONE
Received Certificate of Value  6/20/2000 DONE
Case Summary (BLD)     
Plan Review Report