(F) Reprint permit | | | 1/16/2008 | | |
|
|
|
|
Fee Review-notes | 6/21/2000 | 6/21/2000 | 5/16/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/14/2001 | 5/14/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/14/2001 3:20:41 PM
|
Permanent occupancy | | | 5/14/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8691 issued 5-14-01 to Home Depot.
|
Code Occupancy Approval | | | 5/14/2001 | | PASS |
|
|
|
all noted conditions have been met and final occupancy signed off.
|
BLD-Final | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | FAIL |
Jim Storey
|
|
|
Keith ###-#### handrail height back stair wrong/ exit sign westend of eile/ sign offs from fire/p&z/achd/ ele 5/11/2001 3:29:24 PM
|
BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 | A | PASS |
Jim Storey
|
|
|
###-#### kitchen area framing ok. 3/12/2001 3:34:24 PM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jim Storey
|
|
|
Keith ###-#### interior walls for kitchen area hold downs ok per plan recal for sheathing and top plate hardware. 3/9/2001 11:08:54 AM
|
BLD-Framing/Rough-in | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | CANC |
Jim Storey
|
|
|
###-#### called in for monday pm 3/9/2001 2:43:44 PM
|
BLD-Framing/Rough-in | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Jim Storey
|
|
|
###-#### front and garden center ok. 2/20/2001 11:43:09 AM
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Jim Storey
|
|
|
###-#### nfpa sprinkler under stair required/soffit store front fastner shot pins and # of rfi for approval from engineer. nuts at east stair colum to beam need tighten. 2/9/2001 10:33:34 AM
|
BLD-Framing/Rough-in | 1/31/2001 | 2/1/2001 | 2/1/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover one side cnotice posted 2/1/2001 10:36:40 AM
|
BLD-Framing/Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Storey
|
|
|
Keith ###-#### recieved submital letter to follow with drawings to fire block mezanine floor system duct penatrations and revise smoke fire dampers. d.lightfoot and my self reviewed field plan and are waiting for resubmitals for review. 1/23/2001 2:11:32 PM
|
BLD-Framing/Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Storey
|
|
|
Keith ###-#### recieved submital letter to follow with drawings to fire block mezanine floor system duct penatrations and revise smoke fire dampers. d.lightfoot and my self reviewed field plan and are waiting for resubmitals for review. 1/23/2001 2:11:32 PM
|
BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PART |
Jim Storey
|
|
|
Keith ###-#### arch. to resubmit to address shafts, rated wall configuration at east and west stair off mez., grout required at elavator bar joist, straps need nailled at wall cmu to i joist., 1/17/2001 9:47:56 AM
|
BLD-Framing/Rough-in | 1/12/2001 | 1/16/2001 | 1/16/2001 | A | NR |
Carl Dependahl
|
|
|
Keith ###-####, recall 1/16/2001 9:21:16 AM
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/12/2001 | | |
|
|
|
|
BLD-Other | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 1/11/2001 4:08:08 PM american paving installed roof drainage system without a permit, permit, expose, test, call for inspection, double fee
|
BLD-Framing/Rough-in | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Steven Webb
|
|
|
###-#### inspected roof deck welds 12/27/2000 9:51:20 AM
|
Plan resubmittals received | | | 12/12/2000 | | DONE |
|
|
|
Two sets of plan resubmittals received from Greenberg Farrow Architecture sheets A1.1, A3.0, S2.0 and S3.0, forwarded same Jim Storey. 12/12/00 DAR
|
Plan resubmittals received | | | 12/5/2000 | | PASS |
|
|
|
RECEIVED REVISED COPIES OF THE SITE PLAN, THE FLOOR PLANS AND THE RECORDED SURVEY SHOWING THE REVISIONS REQUIRED TO MAINTAIN THE REQUIRED 60 NONBUILD AREA AROUND THIS SHOPPING COMPLEX. JCM
|
BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Other | 11/16/2000 | 11/16/2000 | 11/16/2000 | A | FAIL |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/16/2000 9:51:05 AM c/n to hold all cost at north east corner of bldg do to resubmital to maintane 60 ft set back . resubmital routed with p//z, pw/planreview.
|
BLD-Footing | 11/3/2000 | 11/6/2000 | 11/6/2000 | P | PART |
Jim Storey
|
|
|
Keith ###-#### interior ft ok rebar ok pending special insp. report. 11/6/2000 3:03:05 PM
|
BLD-Footing | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PART |
Jim Storey
|
|
|
Keith ###-#### work in progess covered with special insp. / need colum anchor bolt epoxy lay out missed. from engineer. 10/31/2000 8:52:56 AM
|
BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Jim Storey
|
|
|
###-#### placed witpecial insp. pending report. 10/20/2000 11:57:24 AM
|
BLD-Footing | 10/17/2000 | 10/18/2000 | 10/18/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 16:24:03. Contact: ###-####. 1-4 a line ok pending s/i report. 10/18/2000 3:06:16 PM
|
BLD-Footing | 10/16/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Jim Storey
|
|
|
###-#### south wall alin to 10 grid pipes to be protected pend s/i report. 10/17/2000 2:34:02 PM
|
(F) Reprint permit | | | 10/12/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2000 | | DONE |
|
|
|
TALKED TO JOHN NEEL--IN ABOUT TWO WEEKS WILL PICK UP ALSO NEED ACHD
|
Routing - PLAN CHECK | 9/13/2000 | | 9/13/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/13/2000 | | PASS |
|
|
|
REVIEWED AND APPROVED RESUBMITTED ARCHITECTURAL AND STRUCTURAL PLAN SHEETS. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/13/2000 | | DONE |
|
|
|
called John Neel the architect at 1-###-#### left a message on his voice mail left fees and we need an ACHD cert upon pickup
|
Plan assigned to (JCM) | 6/26/2000 | | 9/13/2000 | | PASS |
John Menard
|
|
|
9/13/00 10:48:58 JCM - activity updated through activity BLDA022 from case BLD00-01783.
|
Routing - PLUMBING | 9/6/2000 | | 9/12/2000 | | PASS |
|
|
|
per plans and 97 upc
|
Plan Reviewer's activity | | | 9/6/2000 | | |
|
|
|
INSERTED REVISIONS AND ROUTED TO PLUMBING. JCM
|
Routing - PLAN CHECK | 7/24/2000 | | 9/6/2000 | | PEND |
|
|
|
|
Plan resubmittals received | | | 9/5/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM GREENBERG FARROW ARCHITECTS, TWO SETS OF SHEETS SP1.0, A1.0, A3.0, A4.0, A4.2, A5.0, A5.1, A6.0, A7.0, A8.0,S2.0,S2.2, S2.3,S2.4, S3.0, S3.1, S3.8, S4.0, S4.1, S4.2, S5.0, P1.0, AND SMALL DOCUMENTS, FORWARDED SAME TO JOHN MENARD. 9/5/00 DAR
|
Routing - FIRE | 7/19/2000 | 7/24/2000 | 7/24/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLANNING | 6/28/2000 | | 7/24/2000 | | PASS |
Mark Scharfen
|
|
|
TOM CURREN/MARTY SANTOYO. Site plan does not comply with Conditions # 2,4, and 6 of CUP00-00040REVIEWED REVISED PLANS AND APPROVED 7/20/2000 TAC
|
Plan Review Completed(1st rev) | | | 7/24/2000 | | FAIL |
|
|
|
Plumbing failed
|
Routing - PLAN CHECK | 7/3/2000 | | 7/19/2000 | | |
|
|
|
|
Plan resubmittals requested | | | 7/19/2000 | | PEND |
|
|
|
MAILED JOHN NEEL, ARCHITECT OF RECORD, A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
|
Plan resubmittals requested | | | 7/5/2000 | | PEND |
|
|
|
FAXED JOHN NEEL AT GREENBERG FARROW ARCHITECTS A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. JCM
|
Routing Off Site - STRUCTURAL | 6/26/2000 | | 7/3/2000 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE TO OUTSIDE ENG. KMM RECEIVED A FAXED COPY OF THE COMMENT LIST FROM THE ARCHITECT OF RECORD INDICATING THAT THE REVISIONS WERE NOT SIGNIFICANT ENOUGH TO REQUIRE A SECOND REVIEW. JCM
|
Routing - PLUMBING | 6/29/2000 | | 7/3/2000 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 6/29/2000 | | DONE |
|
|
|
RECEIVED FIVE COPIES OF CIVIL SHEET 4 AND TWO COPIES OF DRAINAGE CALCS.M ROUTED TWO COPIES TO JOHN AND THREE WITH CALCS. TO BRIAN. KMM
|
Routing - PUBLIC WORKS | 6/26/2000 | | 6/28/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/26/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2000 | | DONE |
|
|
|
|
Plan assigned to (MYS) | 6/21/2000 | 6/21/2000 | 6/21/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 6/21/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/21/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Modification Accepted | | | | | PASS |
|
|
|
recieved and archived 1 hr const change to aproved plan.
|