Fee Review-notes | 6/21/2000 | 6/21/2000 | 5/9/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 3/7/2001 | 3/7/2001 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/7/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8585 issued 3-7-01 to the Treasure Dental Lab.
|
BLD-Final | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
DOC - Permit Finaled | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 3/6/2001 2:11:51 PM
|
Code Occupancy Approval | | | 2/21/2001 | | PASS |
|
|
|
ALL CONDITIONS HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
OK TO RELEASE BOND.
|
BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Russ Owen
|
|
|
Jim House ###-####. ok for perm oc pending final from zoning. 2/9/2001 11:59:52 AM
|
BLD-Final | 1/18/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 10:11:01. Contact: ###-####.items to correct,c/n posted. 1/19/2001 3:12:05 PM
|
FIRE-Final Inspection | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for permanant occupancy 1/19/2001 12:31:14 PM
|
Temporary occupancy | | | 1/19/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4509 issued 1-19-01 to the Treasure Valley Dental Lab.
|
FIRE-Final Inspection | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 1/19/2001 8:11:35 AM
|
BLD-Other | 1/12/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:48:37. Contact: ###-####. grid ok 1/16/2001 10:46:45 AM
|
BLD-Framing/Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 10:25:05. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 10:45:40. Contact: ###-####.basement fire block at stairs and top of mec room wall 2 layers drywall req.also draft stop req. note plan indicates access thru floor to wall above ,needs chase no details in plans. 12/5/2000 12:38:08 PM 12/5/2000 12:44:15 PM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 15:08:59. Contact: ###-####.no elec or plm inspections done notified contractor ,to obtain these prior to calling frame insp. 11/29/2000 2:43:58 PM 11/29/2000 2:44:40 PM
|
BLD-Framing/Rough-in | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Carl Dependahl
|
|
|
Bill ###-#### masonry ok pend. si report 10/26/2000 10:17:12 AM
|
BLD-Concrete | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | PART |
Carl Dependahl
|
|
|
grout and rebar Bill ###-#### ok pending report, strat 10/24/2000 4:15:33 PM a onsite 10/24/2000 4:15:38 PM
|
BLD-Foundation | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Carl Dependahl
|
|
|
block wall Bill ###-####1st lift 10/20/2000 4:05:27 PM
|
BLD-Footing | 10/12/2000 | 10/13/2000 | 10/13/2000 | A | PART |
Alan Hauser
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/10/2000 | 10/11/2000 | 10/11/2000 | A | NR |
Carl Dependahl
|
|
|
SEPEGE BED FOR STORAGE DRAIN --DAVE ###-#### referred to p.w. 10/11/2000 8:56:02 AM
|
BLD-Footing | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### ok pending report 9/29/2000 9:16:31 AM
|
BLD-Concrete | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PART |
Tom Arcoraci
|
|
|
Bill ###-#### slab on grade only spec insp for concrete stren 9/27/2000 11:22:39 AM
|
BLD-Footing | 9/14/2000 | 9/15/2000 | 9/15/2000 | P | PART |
Jim Storey
|
|
|
Bill ###-#### covered w/s/i. 9/15/2000 4:51:14 PM
|
BLD-Footing | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Carl Dependahl
|
|
|
Mikeque ###-####... 9/8/2000 10:51:40 AM
|
BLD-Conference | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 9/8/2000 conf on project first inspection 9/8/2000 11:48:49 AM
|
(F) Reprint permit | | | 9/8/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/6/2000 | | 9/7/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/7/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2000 | | DONE |
|
|
|
called permit ready
|
Issue PAID IN FULL permit | | | 9/7/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/26/2000 | | 9/7/2000 | | PASS |
Mike Otto
|
|
|
9/7/2000 11:51:42 MLO - activity updated through activity BLDA022 from case BLD00-01786.
|
Routing - PLUMBING | 8/30/2000 | | 9/6/2000 | | PASS |
|
|
|
|
Routing - FIRE | 8/25/2000 | 8/28/2000 | 8/29/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 8/24/2000 | | DONE |
|
|
|
respond letter from daren pedersen of atwood hinsman jones 2 copys ea C1.0 A2.0 A8.0 P0.0 P1.1 P3.0
|
Routing - FIRE | 8/18/2000 | | 8/23/2000 | | FAIL |
Bill Alexander
|
|
|
Did not respond to first review requirements. plans returned to plan check
|
Routing - PLAN CHECK | 8/15/2000 | | 8/18/2000 | | FAIL |
|
|
|
CORRECTIONS FAXED TO ARCHITECT. MLO
|
Plan resubmittals requested | | | 8/18/2000 | | FAIL |
|
|
|
UBC CORRECTIONS NOT COMPLETE.
|
Routing - PLUMBING | 8/14/2000 | | 8/15/2000 | | FAIL |
|
|
|
|
Routing - PLANNING | 8/11/2000 | | 8/14/2000 | | PASS |
|
|
|
Approved per DRH00-116, and as noted on sheet A.1.
|
Routing - PUBLIC WORKS | 8/2/2000 | | 8/10/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/2/2000 | | FAIL |
|
|
|
looked at resub and corrections incomlpete. will complete review and send additional corrections after reviews by PW, Planning, Plumbing. MLO
|
Plan resubmittals received | | | 7/28/2000 | | DONE |
|
|
|
RECEIVED THREE SETS OF PLAN RESUBMITTALS FROM COLE AND ASSOCIATES A, C, L, S AND E SHEETS, FORWARDED SAME TO MIKE OTTO. 7/28/00 DAR
|
Routing - PLUMBING | 7/17/2000 | | 7/18/2000 | | FAIL |
|
|
|
|
Routing - FIRE | 7/12/2000 | | 7/17/2000 | | FAIL |
Bill Alexander
|
|
|
UFC issues related with UBC denial
|
Plan Review Completed(1st rev) | | | 7/17/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/12/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - PLAN CHECK | 7/5/2000 | | 7/12/2000 | | FAIL |
|
|
|
CORRECTIONS FORWARDED TO ARCHITECT IN MEETING AT BUILDING DEPT. MLO
|
Routing - PUBLIC WORKS | 6/28/2000 | | 7/3/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 7/3/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 6/26/2000 | | 6/28/2000 | | PEND |
|
|
|
Design Review approval pending the July 12 meeting.
|
Plan routing begun/NEW & ADDTN | | | 6/26/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2000 | | FAIL |
|
|
|
PLANS REQUIRE 1. SHEETS A6.0, A7.0, A7.1 NOT SIGNED
2. SOILS REPORT (PSF IS LISTED AT 2000)
3. THREE ADDITIONAL CIVIL SETS WITH CALCULATIONS AND O & M PLAN.
4. LEGEAL DESCRIPTION.
FAXED ERIC PETERSON AND SPOKE WITH HIM ON THE PHONE.
PLANS WILL ROUTE TO P & Z FIRST. KMM
|
Received Certificate of Value | | | 6/21/2000 | | DONE |
|
|
|
|
Application received | | | 6/21/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|