Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/10/2002 | | DONE |
|
|
|
2 COPIES REVISED SHEET A1 FLOOR PLAN4 SHEETS A1.13
|
Plan resubmittals received | | | 7/10/2002 | | DONE |
|
|
|
8/10/2000-2 COPIES OF ALL REVISED SHEET F1 FND. PLAN SHOWING TRENCH DRAINS --- CALULATIONS FOR HAIRPINS AT COLUMNS--- CUT SHEET OF MANUFACTURER OF TRENCH DRAIN TO BE INSTALLED.8/10/2000
|
Fee Review-notes | 3/28/2001 | 3/28/2001 | 5/16/2001 | | DONE |
|
|
|
waiting for fax from duncan
|
Permanent Occupancy | | 4/13/2001 | 4/13/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/13/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8630 issued 4-13-01 to Idaho Auto Auction.
|
BLD-Final | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Jim Storey
|
|
|
###-#### Rod pending ele and plm to sign off on perm . 4/3/2001 4:21:00 PM
|
(F) Reprint permit | | | 3/29/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PASS |
Rick Jackson
|
|
|
###-####
|
Code Occupancy Approval | | | 3/21/2001 | | PASS |
|
|
|
NO NOTED ZONING REQUIREMENTS, FINAL SIGNED OFF.
|
Print Occupancy Form | | | 3/9/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/26/2001 | | DONE |
|
|
|
received letter from Billy English stating that he is no longer the architect of record for this project dated 2/23/2001. MLO
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 4:46:18 PM w/ supt...ok to photo washer box firestop at "FIREWALL"
|
BLD-Framing/Rough-in | 1/31/2001 | 2/1/2001 | 2/1/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n, need firestop assys at 1hr occ. walls...washer box.conduit, etc. ok to cover as noted. need clarify extent of occ. sep. walls. 2/1/2001 4:38:15 PM
|
BLD-Conference | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Jim Storey
|
|
|
FOR CONF ROD-- ###-#### worked out occ wall septation of hotisy rm and dryer rm 1 hr wall configuration framing. 1/12/2001 9:33:51 AM
|
Case Summary (BLD) | | | 1/10/2001 | | PASS |
|
|
|
REQUEST FOR CONSTRUCTION TYPE CHANGE TO VN APPROVED GAVE COPY OF REVISED PERMIT TO JIM STOREY. MLO
|
BLD-Conference | 1/5/2001 | 1/8/2001 | 1/8/2001 | A | PASS |
Jim Storey
|
|
|
###-#### ROD FOR CONF REVIEWEFD OCC SEWCPTRATIONS. 1/8/2001 11:21:46 AM
|
BLD-Foundation | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PART |
Jim Storey
|
|
|
###-#### pending special insp. report. 10/2/2000 9:12:16 AM
|
BLD-Foundation | 9/26/2000 | 9/28/2000 | 9/28/2000 | A | PART |
Jim Storey
|
|
|
Rod ###-#### placed with special insp.pendig report. 9/28/2000 1:38:18 PM
|
BLD-Footing | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | PART |
Jim Storey
|
|
|
ft rod-- ###-#### placed w/ special insp. pending report. 9/25/2000 11:43:05 AM
|
BLD-Footing | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PASS |
Jim Storey
|
|
|
Rod ###-#### rebar ok. 9/20/2000 10:24:38 AM
|
BLD-Concrete | 9/15/2000 | 9/18/2000 | 9/18/2000 | P | NR |
Jim Storey
|
|
|
###-#### pre-const. 9/18/2000 4:56:21 PM
|
(F) Reprint permit | | | 8/28/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/18/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/26/2000 | 6/26/2000 | 8/17/2000 | | PASS |
Mike Otto
|
|
|
8/17/2000 10:07:46 MLO - activity updated through activity BLDA022 from case BLD00-01797.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/17/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/17/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/17/2000 | | DONE |
|
|
|
called Billy English at ###-#### permit ready for pickup ACHD needed
|
Routing - PLUMBING | 8/15/2000 | | 8/16/2000 | | PASS |
|
|
|
provide a 3" vent downstreamof the upper fixture branch on the combination waste and vent system, domestic water branchline is undersized, run 1 1/2" to the 1st urinal and 1 1/4" to the 2nd urinal.
|
Telephone call | | | 8/15/2000 | | DONE |
|
|
|
CONTACTED ARCHITECT ABOUT PLUMBING CORRECTIONS WHICH HAVE NOT BEEN ADDRESSED TO DATE. MLO
|
Plan resubmittals received | | | 8/15/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED PLUMB. SHEETS PO.0, P.0,1 AND P2.0. ROUTED TO MIKE OTTO. KMM
|
Routing Off Site - STRUCTURAL | 8/14/2000 | | 8/14/2000 | | PASS |
|
|
|
RESUBMITTAL FAXED TO ENGINEER FOR REVIEW. MLO
|
Plan resubmittals received | | | 8/4/2000 | | DONE |
|
|
|
RECEIVED SHEETS A1, M1. M1 IS NOT SIGNED BY THE ENGINEER. ARCHITECT CONTACTED. MLO
|
Routing - PLAN CHECK | 8/4/2000 | | 8/4/2000 | | PASS |
|
|
|
TALKED TO ARCHITECT. PLUMBING CORRECTIONS AND STRUCTRUAL CORRECTIONS ARE YET TO BE SUBMITTED. MLO
|
Plan resubmittals requested | | | 7/26/2000 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS FROM ENGINEER.
|
Routing Off Site - STRUCTURAL | 7/13/2000 | | 7/26/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals requested | | | 7/25/2000 | | FAIL |
|
|
|
UBC CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Routing - PLAN CHECK | 7/21/2000 | | 7/24/2000 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 7/24/2000 | | FAIL |
|
|
|
UBC CORRECTIONS - FAILED
|
Plan resubmittals received | | | 7/21/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROMBAUMGART CONSTRUCTION, BILLY ENGLISH, TWO SETS OF SHEETS T1, A1, A3 AND A4, FORWARDED SAME TO MIKE OTTO. 7/21/00 DAR
|
Routing - FIRE | 7/19/2000 | 7/20/2000 | 7/20/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 7/20/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/19/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - PLAN CHECK | 7/12/2000 | | 7/19/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Additional plans submitted | | | 7/14/2000 | | DONE |
|
|
|
Received one copy of foundation plan and one copy of pre-eng. building plans. Routed to Mike O. KMM
|
Routing - PLUMBING | 7/7/2000 | | 7/12/2000 | | FAIL |
|
|
|
all s.s. lines to be run at 1/4" per foot, vents required on all trench drain traps, domestic water branch is undersized, water supply to hose reels to originate downstream of 2" equipment r.p., resubmit showing relocated hose reel supply, corrected domestic water sizes, and required venting.
|
Additional plans submitted | | | 7/12/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF ENG. PLANS AND CALCS. ONE COPY OF PRE-ENG. STEEL BUILDING SYSTEM MANUAL. ROUTED TO JOHN TO SEE IF GOES TO OUTSIDE ENG. IF IT DOES GO OUT I WILL NEED ADD. COPY OF THE ABOVE INFORMATION. KMM
HAVE CONTACTED BILLY ENGLISH ASKING FOR ADDITIONAL PLANS TO GO TO OUTSIDE ENG. I WILL SEND OUT WHAT HE HAS GIVEN US. WHEN ADD. SET COMES IN ROUTE TO MIKE O. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 6/28/2000 | | 7/7/2000 | | PASS |
|
|
|
Approved per DRH00-33.
|
Routing - PUBLIC WORKS | 6/26/2000 | | 6/28/2000 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/22/2000 | 6/22/2000 | 6/26/2000 | | PASS |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2000 | | PEND |
|
|
|
REQUIRES 1. STAMPED AND SIGNED STRUCTURAL ENG. PLANS/CALCS.
BILLY STATED THEY SHOULD BE IN DURING THE WEEK OF
6/26 - 6/30
2. FIRE AND SMOKE INFORMATION.
CONTACTED BILLY ENGLISH OF THESE NEEDS. KMM
|
Plan routing begun/NEW & ADDTN | | | 6/26/2000 | | DONE |
|
|
|
WAIT FOR OUTSIDE ENG. UNTIL STRUCT. COMES IN. THEN ASK MIKE OTTO IF HE WOULD LIKE IT TO GO THERE. PLANS ARE IN MY HOLD BOX. KMM
|
Recd Pcfee & Taken To Pln CK | | | 6/22/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/21/2000 | | DONE |
|
|
|
|
Application received | | | 6/21/2000 | | |
|
|
|
|