Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01802
StatusFinaled
Name ERSTAD THORNTON ARCHITECTS
Site Address 5493 E WARM SPRINGS AVE
Project NameSCHOOL (RIVERSTONE)
Customer Number 
ePlanReviewNo
Description
RIVERSTONE COMMUNITY SCHOOL * RENOVATION OF 5,080 S.F. BUILDING FOR CONVERSION FROM AN OFFICE "B" TO A SCHOOL "E-1" OCCUPANCY. WORK INLCUDES NON-BEARING PARTITIONS, NEW DRAFTSTOP AND FIRE ALARM WITH SMOKE DETECTION REQUIRED FOR EXITING THROUGH ADJOINING ROOMS PER APPROVED PLANS AND ATTACHMENTS. AN ADDITIOINAL URINAL SHALL BE INSTALLED TO ACCOMODATE THE 110 STUDENT OCCUPANT LOAD PER UBC CHAPT. 29 IF PERMITS FOR THE PROPOSED MODULARS ARE NOT APPROVED PRIOR TO FINAL OCCUPANCY. IT IS THE REPONSIBILITY OF THE APPLICANT TO OBTAIN APPROVALS FROM THE STATE OF IDAHO FOR USE OF THE PRIVATE SEWER SYSTEM THAT SERVES THIS PROPERTY. NO WORK ON THE THREE PROPOSED MODULAR UNITS IS AUTHORIZED UNDER THIS PERMIT.






CUP99-0011 PC#504-00 KMM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan resubmittals received  7/10/2002 DONE
REVISED REPORT 3 COPIES AND SUPPORTING CAALCULATIONS FROM JIM REESE MTC
Override - Parcel Holds  9/20/2000  
Override - Parcel Holds  9/20/2000  
Permanent occupancy UNPAID FEE  9/20/2000 DONE
Perm. Occ. Cert. #8387 issued 9-20-00 to the Riverstone Community School.
BLD-Final9/18/20009/18/20009/18/2000PPASS
DetailsRuss Owen
###-####
Override - Parcel Holds  9/18/2000  
Routing - FIRE9/13/20009/13/20009/13/2000 PASS
DetailsBill Alexander
Plan modifications.
Routing for occupancy9/7/20009/7/20009/7/2000 PEND
Code Permanant O/K
Permanent Occupancy 9/6/20009/6/2000 DONE
Details
FIRE-Final Inspection8/31/20009/1/20009/1/2000PPASS
DetailsRick Jackson
Tim Barret- ###-####
BLD-Final8/31/20009/1/20009/1/2000PPART
DetailsJim Storey
Tim Barret- ###-####/need side slope for accessable route to bldg 1:10 front and back/exit sign in a-3 must be located above door in the room missed on approved plan./grab bars and partions beeing instaled need rechecked/need p&z sig 9/1/2000 5:36:36 PM noff/ and public works. 9/1/2000 5:37:02 PM
BLD-Framing/Rough-in8/10/20008/10/20008/10/2000PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/10/2000 at 10:14:28. Contact: ###-####. 1 hour corridor not required. 8/11/2000 9:22:41 AM
BLD-Framing/Rough-in8/8/20008/8/20008/8/2000PCANC
DetailsRuss Owen
Tim ###-#### ###-#### cell Done by Tony. 8/9/2000 8:35:17 AM
BLD-Framing/Rough-in8/8/20008/8/20008/8/2000PFAIL
DetailsTony Young
Tim ###-#### ###-#### cell
Issue PAID IN FULL permit  8/7/2000 DONE
Routing - FIRE8/4/20008/4/20008/4/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK8/4/2000 8/4/2000 PASS
BUILDING ONLY
PLANS/APPL TAKEN TO FRONT DESK  8/4/2000 DONE
Print Occupancy Form  8/4/2000 DONE
Inspection Record Card- Bld  8/4/2000 DONE
Telephone call  8/4/2000 DONE
###-####
Routing - PLANNING8/4/2000 8/4/2000 PASS
MARTY HAD DAY OFF PLAN APPROVED BY DIRECTOR WAYNE GIBBS.
Plan assigned to (MLO)6/27/2000 8/4/2000 PASS
DetailsMike Otto
8/4/2000 15:58:49 MLO - activity updated through activity BLDA022 from case BLD00-01802.
Routing - PUBLIC WORKS8/1/2000 8/3/2000 PASS
Telephone call  8/3/2000 DONE
CONTACTED BERRY BURNELL STATE DEQ ABOUT THIS PROJECT. BERRY TOLD ME THAT THE DEQ MUST APPROVE THE CHANGE IN USE FROM OFFICE TO A SCHOOL DUE TO THE LOADING ON THE EXISTING PRIVATE SEWER SYSTEM. MLO
Plan resubmittals received  7/28/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS E1.1, E1.2, E1.3, A1.11, A1.13, A2.11, A2.12, A2.31, A3.12. ONE COPY OF RESPONSE LETTER, PLUS INFORMATION DELIVERED TO THE DEQ. ROUTED TO MIKE O. KMM
Routing - PLANNING7/20/2000 7/28/2000 FAIL
DRH00-139, Condition 1c not met; see letter in DRH00-139 file.
Routing - PLAN CHECK7/25/2000 7/27/2000 FAIL
CORRECTIONS FAXED AND MAILED TO ARCHITECT
Plan resubmittals requested  7/27/2000 FAIL
UBC CORRECTIONS
Plan resubmittals received  7/25/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ERSTAD THORTON ARCHITECTS, A SHEETS AND E SHEETS, FIVE SETS OF EACH FORWARDED SAME TO MIKE OTTO. 7/25/00 DAR
Routing - FIRE7/17/20007/20/20007/20/2000 FAIL
DetailsBill Alexander
UFC ISSUES OF CONCERN THAT ARE NOT ADDRESSED OR DEFINED.
Plan Review Completed(1st rev)  7/20/2000 FAIL
Routing - PLAN CHECK7/11/2000 7/17/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT
Plan resubmittals requested  7/17/2000 FAIL
UBC CORRECTIONS
Routing - PLANNING7/5/2000 7/11/2000 PEND
Pending Design Review approval.
Routing - PUBLIC WORKS6/27/2000 6/28/2000 FAIL
REQUIRES PROOF OF LEGAL LAND DIVISION. KMM
Plan routing begun/TENANTS  6/27/2000 DONE
Plans ACCEPTED BY PLAN TECH  6/27/2000 DONE
Received Certificate of Value  6/21/2000 DONE
Application received  6/21/2000  
Recd Pcfee & Taken To Pln CK  6/21/2000 DONE
Routing for occupancy9/7/20009/7/2000