Case Summary (BLD) | | | 11/25/2008 | | |
|
|
|
|
Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/10/2002 | | DONE |
|
|
|
REVISED RPORT 3 COPIES AND SUPPORTING CALC. FROM JIM REESE OF MTC.
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PASS |
Russ Owen
|
|
|
###-####Isabel###-####
|
BLD-Final | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 11/9/2000
|
Permanent Occupancy | | 11/8/2000 | 11/8/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/8/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8460 issued 11-8-00 to the Riverstone School modular bldg.
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Rick Jackson
|
|
|
Modular C Isabel Bruce ###-####
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Russ Owen
|
|
|
Isabel Bruce ###-#### OK temp,need to resolve tie-down installation with engineer. 11/8/2000 2:22:45 PM
|
FIRE-Final Inspection | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | CANC |
Russ Owen
|
|
|
andy ###-####
|
Code Occupancy Approval | | | 10/27/2000 | | PASS |
|
|
|
Meets compliance wity CUP99-00011
|
BLD-Final | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | FAIL |
Tony Young
|
|
|
bob orr ###-####
c/n posted, verify trade sign offs, have eng. give revision on modular hold downs or change out to be like plans
10/20/2000 2:50:21 PM
|
Override - Parcel Holds | | | 10/20/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | FAIL |
Russ Owen
|
|
|
deck Bob orr ###-####no plans bottom steps exceeds 7". 10/12/2000 8:43:19 AM c/n 10/12/2000 8:43:24 AM
|
Override - Parcel Holds | | | 10/11/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | PART |
Russ Owen
|
|
|
BOB ###-#### FR 1/2 of inside shear walls,provide details for fire stoping coridor .and complete framing at stage/corridor walls like plans. 10/10/2000 12:12:45 PM
|
BLD-Framing/Rough-in | 10/6/2000 | 10/9/2000 | 10/9/2000 | P | CANC |
Russ Owen
|
|
|
after 3:00\\###-####-- CANCEL PER BOB ORR
|
BLD-Framing/Rough-in | 10/6/2000 | 10/9/2000 | 10/9/2000 | P | FAIL |
Russ Owen
|
|
|
after 3:00\\###-####
|
Override - Parcel Holds | | | 10/9/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 10/6/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 9/22/2000 | | |
|
|
|
|
Plan assigned to (MLO) | 9/7/2000 | | 9/21/2000 | | PASS |
Mike Otto
|
|
|
9/21/2000 13:39:10 MLO - activity updated through activity BLDA022 from case BLD00-01803.
|
Routing - PUBLIC WORKS | 9/21/2000 | | 9/21/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2000 | | DONE |
|
|
|
plan modification
|
Inspection Record Card- Bld | | | 9/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2000 | | DONE |
|
|
|
called permit ready
|
Routing - FIRE | 9/12/2000 | 9/13/2000 | 9/13/2000 | | PASS |
Bill Alexander
|
|
|
PLAN MODIFICATION
|
Routing - PLANNING | 9/11/2000 | | 9/12/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing - PLAN CHECK | 9/12/2000 | | 9/12/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing - PUBLIC WORKS | 9/7/2000 | | 9/11/2000 | | FAIL |
|
|
|
PLAN MODIFICATION. REQUIRES A STREET LIGHT PLAN PER BILL COLSON. 9/11/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2000 | | DONE |
|
|
|
plan modification
|
BLD-Conference | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Russ Owen
|
|
|
CONF INSP---- ANDY ERSTAD-- ###-#### --CALL 1ST BEFORE INSP Conference by 408. 8/31/2000 11:43:29 AM
|
Issue PAID IN FULL permit | | | 8/17/2000 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 8/17/2000 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2000 | | DONE |
|
|
|
called Andy Erstad ###-####
|
Plan assigned to (MLO) | 6/27/2000 | | 8/16/2000 | | PASS |
Mike Otto
|
|
|
8/16/2000 08:48:24 MLO - activity updated through activity BLDA022 from case BLD00-01803.
|
Routing - PLAN CHECK | 8/14/2000 | | 8/15/2000 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/8/2000 | | 8/14/2000 | | PASS |
|
|
|
per plans and 97 upc
|
Plan resubmittals received | | | 8/14/2000 | | PEND |
|
|
|
Received three copies of revised sheet f1. Routed to MIke Otto. KMM
|
Plan resubmittals received | | | 8/8/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF A0.11 A1.11, A1.13, A2.12, A3.12, E1.1 ROUTED TO PLUMB. KMM
|
Routing - FIRE | 8/4/2000 | 8/4/2000 | 8/4/2000 | | PASS |
Bill Alexander
|
|
|
With conditions.
|
Routing - PLANNING | 8/4/2000 | | 8/4/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2000 | | 8/3/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/28/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS E1.1, E1.2, E1.3, A1.11, A1.13, A2.11, A2.12, A2.31, A3.12. ONE COPY OF RESPONSE LETTER AND COPY OF INFORMATION SENT TO DEQ. ROUTED TO MIKE O. KMM
|
Routing - PLANNING | 7/20/2000 | | 7/28/2000 | | FAIL |
|
|
|
DRH00-139, Condition 1c not met; see letter in DRH00-139 file
|
Routing - PLAN CHECK | 7/25/2000 | | 7/27/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT
|
Plan resubmittals requested | | | 7/27/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Plan resubmittals received | | | 7/25/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM EARSTAD THORTON ARCHITECTS, FIVE SETS OF A SHEETS AND E SHEETS, FORWARDED SAME TO MIKE OTTO. 7/25/00 DAR
|
Routing - FIRE | 7/17/2000 | 7/20/2000 | 7/20/2000 | | FAIL |
Bill Alexander
|
|
|
NO ADDITIONAL BUILDING/S ETC. ALLOWED UNDER THE CURRENT CONDITION OF FIRE FIGHTING SYSTEM (hydrant and water supply). Per Dave Miller-FPE, Boise Fire Department.
|
Plan Review Completed(1st rev) | | | 7/20/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/17/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - PLAN CHECK | 7/11/2000 | | 7/17/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Additional plans submitted | | | 7/13/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF THE STRUCTURAL ATTACHMENTS AND FOUNDATION DRAWINGS BY DEAN BRIGGS FOR THE MODULAR UNITS AT RIVERSTONE. ROUTED TO MIKE OTTO. KMM
|
Routing - PLANNING | 7/5/2000 | | 7/11/2000 | | PEND |
|
|
|
PENDING DESIGN REVIEW APPROVALKMM
|
Routing - PUBLIC WORKS | 6/27/2000 | | 6/28/2000 | | FAIL |
|
|
|
REQUIRES PROOF OF LEGAL LAND DIVISION.
|
Plan routing begun/TENANTS | | | 6/27/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/21/2000 | | DONE |
|
|
|
|
Application received | | | 6/21/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2000 | | DONE |
|
|
|
|