Permit Information
Permit NumberBLD00-01825
StatusFinaled
Name HEWLETT PACKARD (BLDG #5)
Site Address 11311 W CHINDEN BLVD
Project NameHP #5 - SEISMIC UPGRADE
Customer Number 
ePlanReviewNo
Description
HEWLETT PACKARD BLDG. #5 (SEISMIC UPGRADE). To provide voluntary seismic upgrade of existing HP Building #5, HEWLETT-PACKARD COMPLEX. Modifications and or additions to existing structural seismic brasing designed under guidelines of FEMA 273 - NEHRP GUIDELINES FOR THE SEISMIC REHABILITATION OF BUILDINGS, Sections 3.3.1 (LINEAR STATIC PROCEEDURE) and 5.5.2 (CONCENTRIC BRACED FRAMES) & HP SEISMIC GUIDELINES - BUILDINGS AND CONTENTS PART 2. Work being done in conjunction with remodel of basement, 1st floor and new rooftopm HVAC units installed under currently active permits BLD00-00238; BLD00-01050 & BLD00-01051. Third party structural peer review done by structual engineering firm under contract with Boise City for this specific purpose. NO DEFICIENCIES REVEALED DURING REVIEW - report letter on review attached to plans and in file. SPECIAL INPECTION per sections 106.3.5 & 1701 UBC & as noted on reference sheet S0.1 by structural engineer as part of previously noted building permits. All per approved plans, notes and attached plan review comments. PC#00-510 /drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/27/2001 DONE
Letter of Compliance #21378 issued 3-27-01.
BLD-Final3/15/20013/16/20013/16/2001APASS
DetailsTom Arcoraci
###-#### fn ok for perm occ 3/16/2001 10:38:54 AM
Print Occupancy Form  3/16/2001 DONE
Issue PAID IN FULL permit  8/8/2000 DONE
Inspection Record Card- Bld  7/31/2000 DONE
Telephone call  7/31/2000 DONE
###-####kent
Plan assigned to (DRS)6/29/2000 7/29/2000 PASS
DetailsDan Stuart
7/29/2000 11:09:27 DRS - activity updated through activity BLDA022 from case BLD00-01825.
PLANS/APPL TAKEN TO FRONT DESK  7/29/2000 PASS
Routed to permit desk for issuance of permit.
Routing - PLAN CHECK6/29/2000 7/29/2000 PASS
APPROVED PER PEER REVIEW AND REPORT FROM THIRD PARTY STRUCTURAL ENGINEERING FIRM CONTRACTED WITH BOISE CITY BUILDING DEPARTMENT TO PROVIDE STRUCTURAL PEER REVIEWS. COPY OF FINAL REPORT IN FILE & ATTACHED TO PLANS.
Routing Off Site - STRUCTURAL6/29/2000 7/17/2000 PASS
CONTACED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
7/17/2000 RECEIVED OUTSIDE ENG. PLANS BACK FROM OUTSIDE ENG. WITH COMENT LETTER. ROUTED TO DAN S. KMM
REPORT LETTER OF PEER REVIEW FOUND NO DEISCEPENCIES REQUIRING FURTHER SUBMITTAL OR REVIEW FOR THE PROPOSED VOLUNTARY SEISMIC UPGRADE.
Additional plans submitted  7/3/2000 DONE
RECEIVED THREE COPIES OF ARCH. SHEETS FOR REFERENCE ONLY. THEY ADDRESS THE REQUIREMENTS I WAS ASKING FOR IN ACTIVITY 006 DATED 6/28/2000. I SENT ONE COPY TO OUTSIDE ENG. AND PUT TWO WITH PLANS. KMM
Plans ACCEPTED BY PLAN TECH  7/3/2000 DONE
Pending Assignment by MYS6/29/2000 6/29/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  6/29/2000 DONE
Route to outside engineering and PLAN CHECK.
Plans ACCEPTED BY PLAN TECH  6/28/2000 PASS
PLANS REQUIRE 1. RECORD DECLARATION FORM SIGNED
2. NEEDS TO DIMENSION GRID FOR SHEET S2.8 OR REFRENCE MECH. UP GRADE PLANS BLD00-00238 AND GET COPIES FROM THERE.
3. COVER SHEET REQUIRED WITH CODES AND YEARS, OCCUP. GROUP. CONSTRUCTION TYPE, DESIGN LOADS, TENANT SIZE AND FLOOR. 4. KEY/ SITE PLAN SHOWING SITE AND WHERE BLDG. 5 IS LOCATED.
FAXED TIM BASHFORD AND LEFT MESAGE FOR HIM. I NEED THREE OF EVERYTHING. KMM
Received copies of reference plans used for Phase II - BLD00-00238 , III - BLD00 -1050 & IV - BLD00-01051 for answer response to above noted defficiencies of plan submittals & received fax of signed copy of INVOLVED PARTIES form on 7/29/00. drs
Received Certificate of Value  6/23/2000 DONE
Application received  6/23/2000  
Recd Pcfee & Taken To Pln CK  6/23/2000 DONE