Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01827
StatusFinaled
Name IHOP
Site Address 3599 FEDERAL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
IHOP RESTAURANT * TO CONSTRUCT A NEW ONE-STORY 4,976 SQ FT TYPE VN RESTAURANT BUILDING ALONG WITH SITE IMPROVEMENTS, PAVING LANDSCAPING AND TRASH ENCLOSURE. DRH00-00127 CUP98-00099 PC#496-00
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/27/20036/27/20036/27/2003 DONE
Additional values from subcontractors.
Permanent occupancy  12/12/2000 DONE
Perm. Occ. Cert. #8496 issued 12-8-00 to the International House of Pancakes.
Permanent Occupancy 12/8/200012/8/2000 DONE
Details
Temporary occupancy  12/7/2000 PART
Temp. Occ. Cert. #4085 issued 12-7-00 to the International House of Pancakes.
BLD-Final12/5/200012/6/200012/6/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/05/2000 at 15:51:19. Contact: .
Code Occupancy Approval  12/6/2000 PASS
This building pad/site is all completed as required and final occupany signed off, however the total site/developers area is not all in as required, the road work by achd is not completed so curb, sidewalk and new landscape area is not in, at this time I did not ask for a bolnd as many more buildings require occupancy inspections so bonding for site will take place on other buildings.
FIRE-Final Inspection12/5/200012/5/200012/5/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/05/2000 at 07:35:11. Contact: .
FIRE-Sprinkler Rough-in11/30/200011/30/200011/30/2000PPASS
DetailsRick Jackson
FIRE ###-#### R/I tested hood extinguishing system - okay 11/30/2000 4:23:16 PM
FIRE-Final Inspection11/30/200011/30/200011/30/2000PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 11/30/2000 4:22:48 PM //// c/n issued - air balance report; extinguishers; address; remote LEDs for duct detectors - not tested; emergency lights 11/30/2000 4:24:43 PM
BLD-Other11/16/200011/16/200011/16/2000ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/2000 at 07:28:39. Contact: .
BLD-Other11/14/200011/14/200011/14/2000ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/14/2000 at 07:07:05. Contact: .unable to contact 11/14/2000 12:00:52 PM
BLD-Other11/9/200011/13/200011/13/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/09/2000 at 14:23:02. Contact: . ceilling ok need spreader bars an pod requirments for spacing. 11/13/2000 9:04:55 AM
BLD-Framing/Rough-in10/24/200010/25/200010/25/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 14:02:19. Contact: .
BLD-Framing/Rough-in10/16/200010/17/200010/17/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:15. Contact: . shafts need back 1 hr at walls/ efis needs drip edge at brick wyanes transition/ support ceilling framing at restaroom kitchen wall/ fire blk walls at cielling line. 10/17/2000 9:50:01 AM
BLD-Framing/Rough-in9/15/20009/18/20009/18/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/15/2000 at 14:58:33. Contact: . exxterior sheer nailling ok. 9/18/2000 9:07:59 AM
BLD-Conference9/13/20009/13/20009/13/2000AFAIL
DetailsBill VanDegrift
Added by Inspector: 330 On 9/13/2000 bedrock excavation installing sewer and storm sewer without permit, covered without inspection. lift correction notice.
BLD-Foundation8/29/20008/30/20008/30/2000APASS
DetailsJim Storey
re-bar insp early am Elliot ###-####
Telephone call  8/30/2000 DONE
CALLED NICK OF QUADRANT TO COME AND PICK-UP THE REVISED C-1 SHEET TO TAKE TO THE JOB SITE.
I ROUTED THE SECOND COPY TO OUR RECORDS DEPARTMENT.KMM
Routing - PLANNING8/29/2000 8/29/2000 PASS
resubmitted plans received on 8/28/00
Routing - PLUMBING8/28/2000 8/29/2000 PASS
RESUBMITTED PLANS. BILL REQUESTED TO SEE RESUBMITTED C-1 SHEETS. KMM
Plan resubmittals received  8/28/2000 DONE
MARTY RECEIVED TWO COPIES OF REVISED SHEET C-1.
(F) Reprint permit  8/18/2000 DONE
Issue PAID IN FULL permit  8/17/2000 DONE
Inspection Record Card- Bld  8/17/2000 DONE
Print Occupancy Form  8/17/2000 DONE
Plan assigned to (MLO)6/23/2000 8/16/2000 PASS
DetailsMike Otto
8/16/2000 15:41:29 MLO - activity updated through activity BLDA022 from case BLD00-01827.
Routing - PLAN CHECK8/7/2000 8/16/2000 PASS
Routing Off Site - STRUCTURAL8/16/2000 8/16/2000 PASS
ITEM NUMBER 7 ADEQUATLEY ADDRESSED.
PLANS/APPL TAKEN TO FRONT DESK  8/16/2000 DONE
Routing Off Site - STRUCTURAL8/1/2000 8/14/2000 FAIL
PLAN RESUBMITTALS DATED JULY 31, 2000 SENT TO CONSULTING ENGINEER VIA PDQ. 8/1/00 DAR CORRECTION FAXED TO ARCHITECT 8-15-2000.
Routing - PLANNING6/27/2000 8/7/2000 PASS
Approved per DRH00-127
Plan resubmittals received  7/31/2000 DONE
RECLIVED PLAN RESUBMITTALS FROM RAUSCHENBACH, MARVELLI, BECKER ARCHITECTS,TWO SETS O F CORRECTED DRAWINGS CS-1, SD-1, A1, A3, A4, A7, A8, A11, A12, A13, A15, A16, A23, EQ1, EQ4, E2, AND THREE SETS OF S1 - S5. FORWARDED SAME TO MIKE OTTO. 7/31/00 DAR
Routing - FIRE7/25/20007/27/20007/28/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  7/28/2000 FAIL
Routing Off Site - STRUCTURAL6/23/2000 7/24/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  7/24/2000 FAIL
UBC AND STRUCTURAL CORRECTIONS
Routing - PLAN CHECK6/30/2000 7/24/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT
Routing - PLUMBING6/28/2000 6/30/2000 PASS
provide water to automatic soap disp. if used, additional cross connection protection may be required
Routing - PUBLIC WORKS6/23/2000 6/27/2000 PASS
PLAN.DRH00-00127 APPLICATION RECEIVED 6/13/00 KMM
Plan routing begun/NEW & ADDTN  6/23/2000 DONE
Application received  6/23/2000  
Recd Pcfee & Taken To Pln CK  6/23/2000 DONE
Plans ACCEPTED BY PLAN TECH  6/23/2000 DONE
Received Certificate of Value  6/23/2000 DONE
Routing - PUBLIC WORKS8/29/2000    
RESUBMITTED PLANS. CONTACTED MR. KROUS FOR THREE ADDITIONAL C-1 SHEETS. KMM