Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 12/12/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8496 issued 12-8-00 to the International House of Pancakes.
|
Permanent Occupancy | | 12/8/2000 | 12/8/2000 | | DONE |
|
|
|
|
Temporary occupancy | | | 12/7/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4085 issued 12-7-00 to the International House of Pancakes.
|
BLD-Final | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 15:51:19. Contact: .
|
Code Occupancy Approval | | | 12/6/2000 | | PASS |
|
|
|
This building pad/site is all completed as required and final occupany signed off, however the total site/developers area is not all in as required, the road work by achd is not completed so curb, sidewalk and new landscape area is not in, at this time I did not ask for a bolnd as many more buildings require occupancy inspections so bonding for site will take place on other buildings.
|
FIRE-Final Inspection | 12/5/2000 | 12/5/2000 | 12/5/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 07:35:11. Contact: .
|
FIRE-Sprinkler Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PASS |
Rick Jackson
|
|
|
FIRE ###-#### R/I tested hood extinguishing system - okay 11/30/2000 4:23:16 PM
|
FIRE-Final Inspection | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 11/30/2000 4:22:48 PM //// c/n issued - air balance report; extinguishers; address; remote LEDs for duct detectors - not tested; emergency lights 11/30/2000 4:24:43 PM
|
BLD-Other | 11/16/2000 | 11/16/2000 | 11/16/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:28:39. Contact: .
|
BLD-Other | 11/14/2000 | 11/14/2000 | 11/14/2000 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 07:07:05. Contact: .unable to contact 11/14/2000 12:00:52 PM
|
BLD-Other | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 14:23:02. Contact: . ceilling ok need spreader bars an pod requirments for spacing. 11/13/2000 9:04:55 AM
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 14:02:19. Contact: .
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:15. Contact: . shafts need back 1 hr at walls/ efis needs drip edge at brick wyanes transition/ support ceilling framing at restaroom kitchen wall/ fire blk walls at cielling line. 10/17/2000 9:50:01 AM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 14:58:33. Contact: . exxterior sheer nailling ok. 9/18/2000 9:07:59 AM
|
BLD-Conference | 9/13/2000 | 9/13/2000 | 9/13/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/13/2000 bedrock excavation installing sewer and storm sewer without permit, covered without inspection. lift correction notice.
|
BLD-Foundation | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Jim Storey
|
|
|
re-bar insp early am Elliot ###-####
|
Telephone call | | | 8/30/2000 | | DONE |
|
|
|
CALLED NICK OF QUADRANT TO COME AND PICK-UP THE REVISED C-1 SHEET TO TAKE TO THE JOB SITE.
I ROUTED THE SECOND COPY TO OUR RECORDS DEPARTMENT.KMM
|
Routing - PLANNING | 8/29/2000 | | 8/29/2000 | | PASS |
|
|
|
resubmitted plans received on 8/28/00
|
Routing - PLUMBING | 8/28/2000 | | 8/29/2000 | | PASS |
|
|
|
RESUBMITTED PLANS. BILL REQUESTED TO SEE RESUBMITTED C-1 SHEETS. KMM
|
Plan resubmittals received | | | 8/28/2000 | | DONE |
|
|
|
MARTY RECEIVED TWO COPIES OF REVISED SHEET C-1.
|
(F) Reprint permit | | | 8/18/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/17/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/17/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/17/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/23/2000 | | 8/16/2000 | | PASS |
Mike Otto
|
|
|
8/16/2000 15:41:29 MLO - activity updated through activity BLDA022 from case BLD00-01827.
|
Routing - PLAN CHECK | 8/7/2000 | | 8/16/2000 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/16/2000 | | 8/16/2000 | | PASS |
|
|
|
ITEM NUMBER 7 ADEQUATLEY ADDRESSED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/1/2000 | | 8/14/2000 | | FAIL |
|
|
|
PLAN RESUBMITTALS DATED JULY 31, 2000 SENT TO CONSULTING ENGINEER VIA PDQ. 8/1/00 DAR CORRECTION FAXED TO ARCHITECT 8-15-2000.
|
Routing - PLANNING | 6/27/2000 | | 8/7/2000 | | PASS |
|
|
|
Approved per DRH00-127
|
Plan resubmittals received | | | 7/31/2000 | | DONE |
|
|
|
RECLIVED PLAN RESUBMITTALS FROM RAUSCHENBACH, MARVELLI, BECKER ARCHITECTS,TWO SETS O F CORRECTED DRAWINGS CS-1, SD-1, A1, A3, A4, A7, A8, A11, A12, A13, A15, A16, A23, EQ1, EQ4, E2, AND THREE SETS OF S1 - S5. FORWARDED SAME TO MIKE OTTO. 7/31/00 DAR
|
Routing - FIRE | 7/25/2000 | 7/27/2000 | 7/28/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 7/28/2000 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/23/2000 | | 7/24/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Plan resubmittals requested | | | 7/24/2000 | | FAIL |
|
|
|
UBC AND STRUCTURAL CORRECTIONS
|
Routing - PLAN CHECK | 6/30/2000 | | 7/24/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT
|
Routing - PLUMBING | 6/28/2000 | | 6/30/2000 | | PASS |
|
|
|
provide water to automatic soap disp. if used, additional cross connection protection may be required
|
Routing - PUBLIC WORKS | 6/23/2000 | | 6/27/2000 | | PASS |
|
|
|
PLAN.DRH00-00127 APPLICATION RECEIVED 6/13/00 KMM
|
Plan routing begun/NEW & ADDTN | | | 6/23/2000 | | DONE |
|
|
|
|
Application received | | | 6/23/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/23/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/23/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2000 | | | | |
|
|
|
RESUBMITTED PLANS. CONTACTED MR. KROUS FOR THREE ADDITIONAL C-1 SHEETS. KMM
8/29/00 received three additional C-1 sheets for brian. kmm
|