Fee Review-notes | 6/23/2000 | 6/23/2000 | 2/28/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 | | PASS |
Russ Owen
|
|
|
this has allready been finaled. 2/24/2003 3:34:28 PM
|
DOC - Permit Finaled | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 2/24/2003 3:34:30 PM
|
BLD-Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PASS |
Russ Owen
|
|
|
DAN-- ###-#### FN -INSP CARDS ARE IN MANAGER OFF-FIRE PASSED BUT HAS NOT SIGNED CARD
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | NR |
Tom Arcoraci
|
|
|
###-#### FN DAN
|
FIRE-Final Inspection | 12/22/2000 | 12/22/2000 | 12/22/2000 | P | PASS |
Joe Tawney
|
|
|
DAN ###-#### FIRE FN--CALL 1ST BEFORE INSP Ok for certificate of completion. No sign off card available 12/29/2000 2:20:23 PM
|
FIRE-Final Inspection | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | FAIL |
Joe Tawney
|
|
|
DAN -###-#### FN FIRE--PLANS IN MANAGER OFF Fail C/N issued 9/18/2000 4:53:23 PM
|
BLD-Final | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### no plans or permit on site 9/15/2000 11:11:03 AM
|
BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 13:37:13. Contact: ###-####. 9/14/2000 10:07:32 AM no acess 9/14/2000 11:10:14 AM
|
BLD-Final | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | FAIL |
Alan Hauser
|
|
|
no one on site, except painters 9/14/2000 11:44:34 AM
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
Carl Dependahl
|
|
|
Dan ###-#### call before going out ; keep c/n, ok to rock lid at entry, chk fireblox thru hvac hole 9/7/2000 11:55:04 AM
|
FIRE-Final Inspection | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | FAIL |
Joe Tawney
|
|
|
Dan Weatherby ###-#### plans are in managers office Fail spklr submittal not on site 9/6/2000 12:19:04 PM
|
BLD-Framing/Rough-in | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 08:23:59. Contact: ###-####.c/n: efis system not for vn?? work concealed prior to insp. need other r/i's 8/25/2000 12:24:18 PM
|
Issue PAID IN FULL permit | | | 8/8/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2000 | | DONE |
|
|
|
karl 1-###-####
|
Plan assigned to (DRS) | 6/24/2000 | 7/10/2000 | 7/28/2000 | | PASS |
Dan Stuart
|
|
|
7/28/2000 17:47:21 DRS - activity updated through activity BLDA022 from case BLD00-01840.
|
Routing - PLAN CHECK | 7/17/2000 | | 7/28/2000 | | PASS |
|
|
|
Received resubmittals from architect. Inserted into approved plans and routed for issuance.
|
Plan resubmittals received | | | 7/28/2000 | | DONE |
|
|
|
RECEIVED FOUR COPIES OF REVISED SHEETS A1.1, A4.1, A4.2, ONE COPY OF REVISED CERT. OF VLAUE. ONE COPY OF STRUCT. REVIEW INFORMATION. ROUTED TO DAN S. KMM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2000 | | PASS |
|
|
|
Routing to permit desk for issuance.
|
Routing - FIRE | 7/12/2000 | | 7/17/2000 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/17/2000 | | FAIL |
|
|
|
failed building review
|
Routing - PLANNING | 7/10/2000 | | 7/12/2000 | | PASS |
|
|
|
Approve per DRH00-85.
|
Routing - PLAN CHECK | 7/10/2000 | 7/10/2000 | 7/10/2000 | | PEND |
|
|
|
Preliminary review completed. Re-submittals required. Copy of review to contractor & architect. Routing to Planning Div. & Fire Code analysts for review while waitng for response.
|
Additional plans submitted | | | 7/7/2000 | | |
|
|
|
Two new sets of plans were submitted for review. Assembling with previous structural; plan sheets and routing to planning for review.
|
Meeting | | | 7/3/2000 | | |
|
|
|
Met with Dan Weatherbie, contractor to review plans submitted for review. Detail references were wrong; sheet called out were not part of plan submittal; some sheets submitted had nothing to do with project to be covered under this permit. Dan took copy of plans back to architect to obtain 2 copies of plans refelkecting the scope of this project. These plans are on hold until new plans submitted. Routing to others with wrong data would be useless.
|
Plans ACCEPTED BY PLAN TECH | | | 6/29/2000 | | HOLD |
|
|
|
DAN STUART HAS PLANS. LOTS OF QUESTIONS ON SUBMITTAL. HE IS GOING TO GET IN TOUCH WITH THE ARCH. KMM
|
Telephone call | | | 6/29/2000 | | DONE |
|
|
|
Call to Sam Brady , Architects in SLC to discuss the plans and sheet referenced but not submitted; Details on sheet referenced but not there; differences between structural plans & architectural plans for new canopy remodel - wood? steel? both? clarification details; interior elevation palns submitted were part of previous submittal - are there to be changes; is there to be modification or addition to patio?
Sam had a meeting to attend and referenced me to a Carl Fulmer in Sun Valley to contact as he was in charge of submittals.
|
Telephone call | | | 6/29/2000 | | DONE |
|
|
|
Call to Carl Fulmer to discuss plans submitted and incompleteness or need for clarity update on what is being applied for, are details for changes complete on plans such that they can be used to do work, do I have extra sheets and are details & sheets given for reference the wrong references or did I no get correct plans, etc. Carl will have someone here if possible on Monday the 3rd of July to review the plans and provide correct information.
|
Plan assigned to (MYS) | 6/23/2000 | 6/23/2000 | 6/23/2000 | | DONE |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/2000 | | DONE |
|
|
|
|
Application received | | | 6/23/2000 | | |
|
|
|
|