BLD-Final | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | PASS |
Tony Young
|
|
|
fn insp phil ###-####
|
DOC - Permit Finaled | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/10/2001 1:31:54 PM
|
BLD-Grading Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 | | BOND |
Rita DeYoung
|
|
|
Final grading has been completed according to the approved plan. Revegetation has not been completed and for this the engineer has recommended a $500.00 bond. Upon receipt of this bond the grading is conditionally approved.
|
FIRE-Final Inspection | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Concrete | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Tony Young
|
|
|
###-####
bond beam in fireplace 4/2/2001 2:23:19 PM
|
BLD-Concrete | 3/22/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Tony Young
|
|
|
###-####
bond beam on chimney, ok to grout 3/23/2001 12:59:12 PM
|
BLD-Concrete | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PART |
Tony Young
|
|
|
bond beam ok on fireplace 3/19/2001 12:14:44 PM
|
BLD-Concrete | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Tony Young
|
|
|
###-####
wip, masonary chimney 3/16/2001 1:36:24 PM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PASS |
Tony Young
|
|
|
###-####
fire place slab ok and int. drywall shear ok 3/15/2001 4:11:18 PM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Tony Young
|
|
|
###-####
c/n still pending, insulation ok, ok to sheet rock unaffected areas 3/9/2001 11:24:31 AM
|
FIRE-Sprinkler Rough-in | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | PASS |
Rick Jackson
|
|
|
###-#### okay to cover 3/7/2001 10:21:24 AM
|
BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Tony Young
|
|
|
Phil ###-####
c/n posted, need fire sprinklers signed off, ok to insulate after trades sign off 3/6/2001 1:19:40 PM
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Tony Young
|
|
|
###-####
exterior shear ok, working on some, need to see interior shear later 2/9/2001 12:53:22 PM
|
BLD-Foundation | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | PART |
Tony Young
|
|
|
FOUND WALL --DOONIE ###-####
wip, ok w/ verbal corrections 11/13/2000 12:42:13 PM
|
BLD-Foundation | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | PART |
Tony Young
|
|
|
found wall- donnie ###-####
work in progress, ok w/ verbal corrections 11/6/2000 11:58:49 AM
|
BLD-Footing | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Tony Young
|
|
|
###-####
wip, ok w/ verbal corrections 10/26/2000 9:52:34 AM
|
BLD-Foundation | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Tony Young
|
|
|
donny ###-#### foundation wall
|
BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | FAIL |
Tony Young
|
|
|
ft insp-- donny ###-####
need soil rpt. 9/14/2000 12:30:28 PM
|
BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | NR |
Tony Young
|
|
|
donny ###-####
|
BLD-Footing | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/14/2000
part on basement ftgs 9/14/2000 3:16:17 PM
|
Issue PAID IN FULL permit | | | 8/11/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/10/2000 | | DONE |
|
|
|
received additional engineering. windows being added in media room.
|
Plan Review Report | | | 8/10/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/10/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/10/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2000 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Print Occupancy Form | | | 8/10/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 7/26/2000 | | 8/10/2000 | | PASS |
Dan Overy
|
|
|
8/10/2000 10:36:58 DJO - activity updated through activity BLDA022 from case BLD00-01844.
|
Plan Reviewer's activity | | | 7/26/2000 | | PEND |
|
|
|
contacted designer about holdown and shear wall schedules that are specified in engineers calculations that are not indicated on plans. media room does not meet natural light requirements. will issue when items are addressed
|
Plans ACCEPTED BY PLAN CHECK | | | 7/26/2000 | | PEND |
|
|
|
|
Routing - PLANNING | 7/13/2000 | 7/13/2000 | 7/17/2000 | | PASS |
|
|
|
scott assigned to susan riggs.7/14/2000
|
Routing - PUBLIC WORKS | 6/26/2000 | 6/26/2000 | 7/13/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/26/2000 | 6/26/2000 | 7/13/2000 | | DONE |
Rita DeYoung
|
|
|
took to terry records 6/26/00.Approved as Category 1. Don't issue permit until appeal period for Hillside application has lapsed on Monday, July 24.
|
Application received | | | 6/26/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 3/2/2001 | 3/5/2001 | 3/6/2000 | P | FAIL |
Russ Owen
|
|
|
###-####c/n posted. 3/6/2001 1:03:55 PM
|
Routing - PLAN CHECK | 7/17/2000 | 7/17/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 6/26/2000 | | | | PEND |
Dan Overy
|
|
|
refer to terry records notes in actions. regarding july 24th
|