Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01867
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #31-(PCS1603)
Customer NumberPCS1603
ePlanReviewNo
Description
MICRON BUILDING #31 - SURFACE WATER TREATMENT PLANT - PCS #11-961603 * TO CONSTRUCT A NEW 6,435 SQ. FT., ONE STORY, SURFACE WATER TREATMENT PLANT BUILDING CONSTRUCTED OF MASONRY WALLS AND STEEL FRAMED ROOF SYSTEM. THE PROPOSED QUANTITIES AND CONCENTRATION OF CHEMICALS WITHIN THIS BUILDING WILL CONTAIN LESS THAN THE EXEMPT AMOUNTS OF CAUSTIC SODA AND CITRIC ACID PERMITTED BY UBC TABLE 3-E. THERE ARE NO CODE COMPLYING SEPARATE CONTROL AREAS CONSTRUCTED WITHIN THIS BUILDING. THE ENTIRE BUILDING WAS CONSTRUCTED TO BE CONSIDERED ONE CONTROL AREA. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#525-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  8/3/2001 DONE
Fee Review-notes6/28/20006/28/20004/19/2001 DONE
Permanent Occupancy 3/14/20013/14/2001 DONE
Details
BLD-Framing/Rough-in3/12/20013/14/20013/14/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/12/2001 at 13:04:22. Contact: ###-####. c/o ok. 3/14/2001 2:28:40 PM
Permanent occupancy UNPAID FEE  3/14/2001 DONE
Perm. Occ. Cert. #8596 issued 3-14-01 to Micron Technology.
FIRE-Final Inspection3/7/20013/8/20013/8/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/07/2001 at 15:55:57. Contact: ###-####.
FIRE-Final Inspection3/2/20013/5/20013/5/2001PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 3/2/2001 3:54:53 PM will attempt paving for access on 3/06/01 3/5/2001 2:28:21 PM
FIRE-Final Inspection3/1/20013/2/20013/2/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/01/2001 at 09:08:16. Contact: ###-####.
Print Occupancy Form  2/21/2001 DONE
Plan Reviewer's activity  2/20/2001  
At the request of the applicant, I have revised the building description to indicate that this building was constructed without any code complying control areas. The entire building is be considered as a control area and the amount of hazardous materials within this building are required to be maintained below the exempt amounts per UBC Tb. 3-E. (The building was constructed to comply with the approved plans.) JCM
BLD-Framing/Rough-in2/10/20012/12/20012/12/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/10/2001 at 11:13:01. Contact: ###-####. conf. plan review iuse of permit scope of work. pending responce. 2/12/2001 3:02:08 PM
FIRE-Final Inspection2/7/20012/9/20012/9/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/07/2001 at 16:27:08. Contact: ###-####. exit signs; extinguishers; access roads not complete; door landings; hydrant in wrong position 2/9/2001 10:33:48 AM
BLD-Framing/Rough-in1/2/20011/3/20011/3/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 14:33:37. Contact: ###-####. roof deck and struc. framing ok. 1/3/2001 3:02:54 PM
BLD-Framing/Rough-in1/2/20011/3/20011/3/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 14:33:37. Contact: ###-####. roof deck and struc. framing ok. 1/3/2001 3:02:54 PM
BLD-Framing/Rough-in12/26/200012/27/200012/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 15:09:58. Contact: ###-####. conf. with haedgrove and richardson to review roof details/ const. covered with special insp. pending reports for welding/ 12/27/2000 4:20:31 PM
BLD-Concrete10/24/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 07:44:06. Contact: ###-####.
BLD-Concrete10/24/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 07:44:06. Contact: ###-####.
BLD-Concrete10/24/200010/24/200010/24/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 07:43:19. Contact: ###-####.
BLD-Foundation10/2/200010/3/200010/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2000 at 14:23:19. Contact: ###-####. placed w/si pending report. 10/3/2000 3:40:09 PM
BLD-Footing9/27/20009/28/20009/28/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/27/2000 at 13:59:41. Contact: . placed with special insp. pending report. 9/28/2000 11:17:11 AM
BLD-Footing9/21/20009/22/20009/22/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/21/2000 at 11:31:03. Contact: ###-####. placed with special insp. pending report. slab 2nd half. 9/22/2000 2:27:40 PM
BLD-Footing9/19/20009/20/20009/20/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/19/2000 at 17:12:16. Contact: . work in progess pending special insp. report. 9/20/2000 9:40:05 AM
BLD-Footing9/15/20009/18/20009/18/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/15/2000 at 15:27:02. Contact: ###-####. rebar ok pending s/i report. 9/18/2000 9:39:33 AM
BLD-Footing9/14/20009/15/20009/15/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/14/2000 at 13:10:14. Contact: ###-####.
(F) Reprint permit  9/1/2000 DONE
Issue & PRINT permit  8/31/2000 DONE
Inspection Record Card- Bld  8/30/2000 DONE
Print Occupancy Form  8/30/2000 DONE
Routing Off Site - STRUCTURAL8/28/2000 8/29/2000 PASS
FAXED A COPY OF THE STRUCTURAL REVISIONS TO THE CONSULTING ENGINEER FOR THEIR REVIEW. JCM PLANS WITH REVIEW CAME BACK FROM OUTSIDE ENG. TOOK TO JCM.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2000 PASS
Routing - PLAN CHECK8/25/2000 8/29/2000 PASS
Plan assigned to (JCM)7/3/2000 8/29/2000 PASS
DetailsJohn Menard
8/29/00 14:24:33 JCM - activity updated through activity BLDA022 from case BLD00-01867.
Plan resubmittals received  8/28/2000 DONE
RECEIVED ONE FAXED COPY OF RESPONSE TO STRUCTURAL PLAN CHECK REVIEW COMMENTS. ROUTED TO JOHN M. KMM
Routing - PUBLIC WORKS8/23/2000 8/25/2000 PASS
Plan Reviewer's activity  8/25/2000  
E-MAILED FRANK KVAPIL TO REMIND HIM THAT I HAVE NOT YET RECEIVED THE STRUCTURAL RESUBMITTALS REQUESTED BY FAX 8/4/00. JCM
Routing - PLAN CHECK8/15/2000 8/23/2000 PEND
Routing - FIRE8/15/20008/15/20008/15/2000 PASS
DetailsBill Alexander
Routing - FIRE7/31/20008/7/20008/7/2000 FAIL
DetailsBill Alexander
Need verification from Fire Department concerning F-2 occupancy and Hazardous materials quantities.
Plan Review Completed(1st rev)  8/7/2000 FAIL
Plan resubmittals received  8/7/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM MICRON TWO SETS OF SHEET A6.1 . FORWARDED SAME TO JOHN MENARD. 8/7/00 DAR
Plan resubmittals requested  8/4/2000  
FAXED FRANK KVAPIL A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing Off Site - STRUCTURAL7/20/2000 8/4/2000 FAIL
AM WAITING FOR STRUCTURAL CALCS. SPOKE WITH FRANK AGAIN ABOUT OBTAINING THEM. KMM
7/20/2000 CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Routing - PLAN CHECK7/25/2000 7/31/2000 PEND
Plan resubmittals requested  7/31/2000  
E-MAILED FRANK KVAPIL AT MICRON REQUESTING REVISIONS. JCM
Routing - PLUMBING7/24/2000 7/25/2000 PASS
per plans and 97 upc
Routing - PUBLIC WORKS7/18/2000 7/24/2000 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. 7/24/00 DAR
Routing - PLANNING7/24/2000 7/24/2000 PASS
No Design Review Required. TALKED WITH TEMPRA AND SHE INDICATED THAT THERE WAS NO DESIGN REVIEW REQUIRED ON THIS PROJECT, THEREFORE SHE WOULD NOT BE SIGNING OFF ON THE PLANS. JCM
Plan routing begun/NEW & ADDTN  7/18/2000  
Plans ACCEPTED BY PLAN TECH  7/18/2000 PEND
RECEIVED SOILS REPORT, STRUCT. CALCS. I AM ROUTING PLANS. AT THIS TIME, I WILL LET P&Z AND PW HANDEL ANY ITEMS THEY MAY NEED. KMM I STILL HAVE NOT RECEIVED SITE PLAN. KMM
Plan routing begun/NEW & ADDTN  7/3/2000  
PLANS IN MY HOLD BOX. I HAVE ROUTED ONE COPY OF THE THREE TO JOHN FOR OUTSIDE ENG. REQUEST. KMM
Plans ACCEPTED BY PLAN TECH  7/3/2000 HOLD
REQUIRE 1. ARCH./ENG. RECORD FORM
2. SOILS REPOR. HAVE ASKED FOR SOILS BEARING PRESURE.
3. THREE ADDIDITONAL CIVIL SHEETS STAMPED AND SIGNED.
4. STAMPED AND SIGNED STRUCT. CALCS.
5. LANDSCAPE PLANS TWO COPIES
6. DRH# INFORMATION. IF HE DOES NOT HAVE A DR# THEN I SUGGESTED HE SPEAK WITH TEMPRA
7. SITE PLAN SHOWING ALL REQUIREMENTS.
FAXED FRANK THE ABOVE REQUESTED ITEMS. KMM
7/18/00 I AM GOING TO ROUTE PLANS. I SPOKE WITH FRANK STILL REQUESTING SOILS REPORT, STRUCT. CALCS. ARCH./ENG. RECORD FORM. I WILL LET TEMPRA AND BRIAN DEAL WITH THEIR REQUIREMENTS. KMM
7/19/2000 RECEIVED THREE COPIES OF STRUCT. CALCS AND SOILS REPORT. ONE COPY OF ARCH. ENG. DECLARATION FORM. ROUTED TO JOHN M. KMM
Application received  6/28/2000  
Pending Assignment by MYS6/28/2000 6/28/2000 DONE
DetailsMarlene Southard
Received Certificate of Value  6/28/2000 DONE