BLD-Final | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PASS |
Steven Webb
|
|
|
Brian ###-#### C. of C. #20430 issued 5/16/2001 1:22:42 PM
|
DOC - Permit Finaled | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 5/16/2001 1:22:49 PM
|
BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | FAIL |
Steven Webb
|
|
|
Brian ###-#### No address posted--Did not go inside. 5/15/2001 1:05:44 PM
|
BLD-Final | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | NR |
Steven Webb
|
|
|
###-#### C/n posted 5/2/2001 3:47:49 PM
|
BLD-Framing/Rough-in | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PASS |
Steven Webb
|
|
|
###-#### ok to cover 1/23/2001 1:07:45 PM
|
BLD-Energy code compliance | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 10:29:26. Contact: ###-####. Additional items required on posted c/n. ok to insulate, not to cover. 1/19/2001 2:46:54 PM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | A | FAIL |
Steven Webb
|
|
|
###-####: C/N issued:1) Air package needed; 2) Address is needed on building; 3) Eng. needed per prior c/n dated 12/8/00; 4) Draftstops needed at ceiling line; 5) Stari tread at bottom exceeds 3/8 tolerance; 6) Double M.lam at porch needs solid studs underneath.; 7) Insulation needed in crawl 1/18/2001 12:21:23 PM
|
BLD-Framing/Rough-in | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Dave Hannah
|
|
|
Duane ###-#### ok to cover all but sw corner bedroom 2 missing two straps need engineering 12/8/2000 10:41:16 AM
|
BLD-Foundation | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PASS |
Russ Owen
|
|
|
stem wall James ###-####
|
BLD-Footing | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Russ Owen
|
|
|
around 3:00 James ###-####
|
Issue PAID IN FULL permit | | | 10/23/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2000 | | DONE |
|
|
|
talked to duane to verify plans are ready-will pick up next week
|
Inspection Record Card- Bld | | | 8/3/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2000 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 8/2/2000 | | PASS |
|
|
|
JIM WYLLIE APPROVED AND RELEASED THE NONBUILD AGREEMENT BASED ON ENGINEERING SUBMITTED BY QUADRANT.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/14/2000 | | 8/2/2000 | | PASS |
Steve Munroe
|
|
|
8/2/2000 15:22:47 MYS - activity updated through activity BLDA022 from case BLD00-01872.
|
Override - Parcel Holds | | | 7/19/2000 | | |
|
|
|
|
Pending Assignment by DJO | 6/28/2000 | | 7/14/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 6/28/2000 | 6/28/2000 | 6/29/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 6/28/2000 | 6/28/2000 | 6/28/2000 | | PASS |
|
|
|
|
Application received | | | 6/28/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 6/29/2000 | 6/29/2000 | | | PEND |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
7/19/00 Plan review is DONE, waiting for Jim Wyllie to release / approved.
|