Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-01894
StatusFinaled
Name ELEVATED ROAD
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-ELEVATED ROAD
Customer Number 
ePlanReviewNo
Description
AIRPORT ELEVATED ROADWAY * TO CONSTRUCT AN APPROXIMATE 800 LIN. FT. CONCRETE, FOUR LANE ELEVATED ROADWAY WITH CONNECTING ROAD ACCESS RAMPS AND PEDESTRIAN WALKWAYS AND EXIT STAIRWAY. THIS PERMIT ALSO INCLUDES THE CONSTRUCTION OF THE SURFACE ACCESS ROADS FOR THE NEW BOISE AIR TERMINAL, AS WELL AS, A NEW COVERED PEDESTRIAN BRIDGE CONNECTING THE EXISTING PARKING GARAGE AND THE NEW ELEVATED ROADWAY PEDESTRIAN WALK. THE ELEVATED ACCESS ROADWAY IS BEING DESIGNED AND CONSTRUCTED UNDER THE APPLICABLE REQUIREMENTS OF THE AASHTO "STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES" 1996 EDITION. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH99-00206/CUP99-00130/PC#533-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  2/13/2004 DONE
Telephone call6/9/2003 6/9/2003 DONE
Left message for Matt Petaja for Final Certificate of Values.
BLD-Final2/19/20032/20/20032/20/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/19/2003 at 2:17:37 PM. Contact: ###-####. finanl ok all special insp and engineering sign offs in archive. 2/20/2003 10:54:37 AM per approved plan from plan review. 2/20/2003 10:56:38 AM
Letter of compliance  2/20/2003 DONE
Cert. of Compliance #22824 issued 2-20-03.
BLD-Final2/12/20032/13/20032/13/2003PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/12/2003 at 16:05:14. Contact: ###-####. stil need gaurd rail height at west end and east end. 2/13/2003 4:05:15 PM
FIRE-Final Inspection2/11/20032/12/20032/12/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 2/11/2003 at 8:38:50 AM. Contact: ###-####.
BLD-Aging Inspection2/4/20032/4/20032/4/2003 PART
DetailsJim Storey
wip 2/4/2003 7:34:58 AM
FIRE-Final Inspection12/4/200212/5/200212/5/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/04/2002 at 09:41:20. Contact: ###-####. need clarification on location of hydrants in relation to the cab road; per Dave Miller he will talk with Ken Schneider about this 12/5/2002 5:02:36 PM
Code Occupancy Approval12/5/200212/5/200212/5/2002PDONE
DetailsScott M.Brown
FINAL SIGNRD OFF. 12/5/2002 4:25:01 PM
BLD-Final12/2/200212/3/200212/3/2002PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/02/2002 at 10:24:51. Contact: ###-####.gaurdrail min 42 inches/ engineer of record letter of approval for all rfi's and review of all special insp. reports / soil special insp final afadivad sign off/ lock on power doors at parking garage/ all other required signoffs per permit. 12/3/2002 4:55:49 PM
BLD-Foundation10/8/200110/10/200110/10/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/08/2001 at 17:15:53. Contact: ###-####. placed with special insp. unable to get there. 10/10/2001 3:44:41 PM
BLD-Foundation10/8/200110/9/200110/9/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/08/2001 at 17:15:07. Contact: ###-####. east roadway back fill and retaining wall ft ok special insp on site. rebar on bridge deck in progess. engineer to address dope psi loading being crushed under rebar loading will be replaced. followed through special insp with rfi pending./ wating for ducts for pt profils. 10/9/2001 11:46:08 AM
BLD-Foundation9/17/20019/20/20019/20/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/17/2001 at 15:04:56. Contact: ###-####. placed with special insp. pending report. 9/20/2001 3:09:43 PM
BLD-Foundation9/17/20019/19/20019/19/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/17/2001 at 15:04:04. Contact: ###-####. covered w/s/i 9/19/2001 11:13:36 AM
BLD-Foundation9/17/20019/18/20019/18/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/17/2001 at 15:03:12. Contact: ###-####. placed w/special insp. pending reports 9/18/2001 10:40:24 AM
BLD-Foundation8/27/20018/31/20018/31/2001APART
DetailsJim Storey
harry ###-#### covered by special insp. 8/31/2001 10:39:30 AM
BLD-Foundation8/27/20018/30/20018/30/2001AFAIL
DetailsJim Storey
harry ###-#### shat rebar lap splice not per drawings rfi required to justify before placement/ spiral bar pitch being addressed for correction colm forms being removed for reinsp. 8/30/2001 9:58:43 AM
BLD-Foundation8/27/20018/29/20018/29/2001APART
DetailsJim Storey
harry ###-#### placedwith special insp. pending report. 8/29/2001 10:35:20 AM
BLD-Foundation8/27/20018/28/20018/28/2001APART
DetailsSteven Webb
harry ###-#### covered under special inspectors 8/28/2001 8:49:06 AM
BLD-Foundation8/20/20018/21/20018/21/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/20/2001 at 10:39:51. Contact: ###-####. b piling rebar ok. 8/21/2001 9:37:47 AM
Issue & PRINT to be Invoiced  7/27/2001 DONE
(F) Reprint permit  7/20/2001 DONE
Plan resubmittals received  7/16/2001 DONE
Received a copy of Ada County Highway District letter. Routed one to John and one to the front desk. KMM
Print Occupancy Form  1/18/2001 DONE
Inspection Record Card- Bld  1/18/2001 DONE
Telephone call  1/18/2001 DONE
called permit ready
Plan Reviewer's activity  1/17/2001 PEND
Faxed Brett Labrie at CSHQA a request for a special inspection requirement report, for the elevated roadway portion of this project, prepared by the engineer of record.
PLANS/APPL TAKEN TO FRONT DESK  1/17/2001 PASS
Routing - PLAN CHECK9/18/2000 1/17/2001 PASS
Plan assigned to (JCM)7/5/2000 1/17/2001 PASS
DetailsJohn Menard
1/17/01 13:55:10 JCM - activity updated through activity BLDA022 from case BLD00-01894.
Routing Off Site - STRUCTURAL11/21/2000 1/3/2001 PASS
Sent Plan resubmittals via PDQ. 11/21/00 DAR Received an e-mail letter from the consulting engineer approving the final resubmitted revisions. JCM
Plan resubmittals received  11/21/2000 DONE
Received three copies of clarification drawings sheets C4.01, C4.02, C4.03, C4.10, C7.04, S-5, S-6. Three copies of HNTB response to structural review comments from John Menard Dated 10/25/00. One copy of John Menard Structural Review Comments dated 10/25/00. Routed to John M
Routing Off Site - STRUCTURAL10/12/2000 10/25/2000 FAIL
CONTACTED PDQ TO TAKE RESUBMITTALS RECEIVED ON 10/11/00 OUT TO OUTSIDE ENG. KMM
Plan resubmittals requested  10/25/2000  
FAXED LARRY KALOUSEK A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING ADDITIONAL REVISIONS. JCM
Plan Reviewer's activity  10/12/2000 PASS
REVISED ARCHITECTURAL PLAN SHEETS REVIEWED AND APPROVED AS SUBMITTED. JCM
Plan resubmittals received  10/11/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM CSHQA ARCHITECTSSTRUCTURAL AND ARCHITECTUAL PLANS TWO SETS OF EACH AND SMALL DOCUMENTS. FORWARDED SAME TO JOHN MENARD. 10/11/00 DAR
Routing Off Site - STRUCTURAL10/3/2000 10/11/2000 FAIL
SENT RESUBMITTALS TO CONSULTANTING ENGINEER VIA PDQ. 10/3/00 DAR
Meeting  10/6/2000 DONE
LARRY KALOUSEK CAME IN AND TOOK THE UNSIGNED REVISED STRUCTURAL PLANS THAT WERE SUBMITTED TO US ON 8/28/00. LARRY WILL SHIP TO HIS ENGINEER, THEN GIVE THREE COPIES BACK TO US. I HAVE A CALL INTO CH2MHILL TO SEE IF THE PLANS THEY RECEIVED WERE SIGNED. KMM THE PLANS WE SENT TO OUTSIDE ENG. WERE NOT STAMPED AND SIGNED. WHEN LARRY BRINGS BACK THE STAMPED SET, WE WILL ROUTE A COPY TO HIM. KMM
Routing - PUBLIC WORKS9/6/2000 9/18/2000 PASS
Routing - AIRPORT9/6/2000 9/14/2000 PASS
SENT PLANS VIA PDQ FOR MATT PETAJA TO SIGN OFF AT THE AIRPORT. 9/6/00 DAR
Routing - PLAN CHECK8/31/2000 9/6/2000  
Routing - FIRE8/24/20008/28/20008/31/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/31/2000 FAIL
Plan resubmittals received  8/28/2000  
2 copies of response to non-structural review comments. 3 copies each- s-5s-6 s-7 s-8 s-11 s-50 s-55 s -61 s- 62 s-72 s-74 s-87 2 copies aa9.2 2 copies aa9.2
Routing - PLAN CHECK7/28/2000 8/24/2000  
Plan resubmittals requested  8/24/2000  
FAXED LARRY KALOUSEK AT CSHQA A COPY OF THE COMMENT LIST REQUESTING REVISIONS. JCM
Plan resubmittals requested  8/8/2000  
FAXED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST FROM THE CONSTULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing Off Site - STRUCTURAL7/6/2000 8/7/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM RECEIVED A COPY OF THE COMMENT LIST, BY E-MAIL, FROM HTE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing - PLANNING7/25/2000 7/28/2000 PASS
Per DRH99-206
Routing - PUBLIC WORKS7/6/2000 7/25/2000 FAIL
MATT PETAJA FAILED THESE PLANS . CACULATIONS WILL BE RESUBMITTED TO HIM. 7/25/00 DAR
Plan routing begun/NEW & ADDTN  7/6/2000 DONE
Plans ACCEPTED BY PLAN TECH  7/6/2000 PEND
SPOKE WITH MATT ABOUT DRAINAGE CALCS. I DID NOT FIND ANY. KMM
Pending Assignment by MYS6/29/2000 7/5/2000 DONE
DetailsMarlene Southard
First Notice6/29/20006/29/20006/29/2000 DONE
journal entry for the airport
Application received  6/29/2000  
Received Certificate of Value  6/29/2000 DONE