Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01936
StatusFinaled
Name IDAHO POWER CO
Site Address 621 S 17TH ST
Project NamePOWERHOUSE EVENT CNT
Customer Number 
ePlanReviewNo
Description
NAME CHANGED FROM "BEAVER RIVER POWER CO" TO "POWERHOUSE EVENT CENTER" WITH THIS PERMIT. To remodel an existing 7,495 sq.ft. two story building for assembly occupancy. Work to include construction of new exterior exit stairway from second floor to share with first floor as common exit system on west side of building; install new accessible restrooms on 1st and 2nd floors; area for future kitchen; upgrade of sprinkler / alarm systems per UFC for assembly occupancies; and miscellaneous finish. NOTE: Future kitchen and balcony called out on plan will require separate, application, approvals and permits. 1st floor=5,021 sq.ft./2nd=2,474 sq.ft./ 577 sq. ft. mechanical mezz. above the second level at West end & 240 sq. ft. mechanical basement under platform at West end 1st Floor. NOTE: THIS BUILDING IS FULLY SPRINKLED AS SUBSTITUTION FOR 1-HOUR CONSTRUCTION. Post occupant loads in assembly areas as noted on approved plans. PC#00-532/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/5/2016 DONE
Case Summary (BLD)  10/12/2011 DONE
Plan resubmittals received  9/23/2002 DONE
resubmittal received 1 copy A.01, A2.0, A2.1 A8.0, A8.1 2 SETS STAIR DRAWINGS AND CALCULATIONS. TAKEN TO DAN STUART
Permanent occupancy  5/8/2002 DONE
Perm. Occ. Cert. #9127 issued 5-8-02 to the Powerhouse Event Center.
Permanent Occupancy 5/2/20025/2/2002 DONE
Details
Code Occupancy Approval  12/3/2001 DONE
Meets compliane w/revised plans - signed final.
Temporary occupancy  11/29/2001 DONE
Extended temp occ 11/28/01 / new expiration 2/28/02 per Tim and Jenifer aml
BLD-Final2/27/20012/28/20012/28/2001PNR
DetailsCarl Dependahl
FN OCC-- MARK ###-####, need achd, complete 2/28/2001 5:09:11 PM sprinkler re 2/28/2001 5:09:26 PMlocation 2/28/2001 5:09:49 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsCarl Dependahl
###-#### 5 int non-brg wall at 2nd fl.2/21/2001 9:34:41 AM... 2/21/2001 10:48:14 AM 2/21/2001 10:49:05 AM
Conference1/26/20011/26/20011/26/2001 PART
Temp. Occ. Cert. #4070 extended for 30 days as per Tim Hogland.
Fee Review-notes7/5/20007/5/200011/27/2000 DONE
3-12 left mesg w/GC number
BLD-Final10/26/200010/27/200010/27/2000APART
DetailsJim Storey
MARK ###-#### FN TEMP OCC life saftey ok for event. single function only. c/n to be 10/27/2000 5:26:06 PM done in max 2 weeks of this date. 10/27/2000 5:26:56 PM
FIRE-Final Inspection10/26/200010/27/200010/27/2000APASS
DetailsRick Jackson
MARK ###-####-- FIRE FN
Temporary occupancy  10/27/2000 PART
Temp. Occ. Cert. #4070 issued 10-27-00 to the Powerhouse Event Center.
BLD-Final10/25/200010/25/200010/25/2000PNR
DetailsJim Storey
TEMP OCC-- MARK ###-#### -INSP THE SAFETY RAIL ON MEZZ
BLD-Framing/Rough-in10/18/200010/19/200010/18/2000PCANC
Details
###-#### WRONG PERMIT # PER MARK BROWN
BLD-Framing/Rough-in10/13/200010/16/200010/16/2000AFAIL
DetailsCarl Dependahl
Mark ###-#### ; need to submit all spec. insp/ eng's reports, complete stairs, etc upper rest. rm ok to rock. multi permits 10/16/2000 1:21:28 PM
Routing - PLAN CHECK10/3/2000 10/13/2000 PASS
Received engineering design for use of "cable railing" as intermediate rails for guardrails and method to determine compliance with code. Approved as noted and attached plan revieew comments.
Meeting  10/13/2000  
Went to Tim Hoglands office to see if he had approved the policy for design & use of cable rail systems that evolved from meetings between structural division (Dave Hattrick) & plan check division (Marlene Southard, Carl Westfall, Dan Stuart). Could not find a copy of the proposal for his signature. Checking at Marlene's desk it appears it had not been submitted to him before she became ill on Wednesday the 11 of Oct. Tim told me if it was agreed on between the two divisions that he would support the proposal as policy and to go ahead and treat the permit issuance as if the policy was in place. I connected engineering received on cable rail design (10/12/00 from AHJ - Riley Mahaffey), copy of draft policy proposal & copy of letter from Dave Hattrick to Doug Kowallis telling Doug that he needed to provide engineering for cable system or use prescriptive design method per policy and the inspection division would use his project as the test case.
I reviewed the submitted engineering with Carl Westfall to be sure he shared the opinion the engineering accomplished what was proposed. He felt comfortable with the design.
PLANS/APPL TAKEN TO FRONT DESK  10/13/2000 PASS
Approved plans as noted and attached. Routing to permit desk for issuance.
Inspection Record Card- Bld  10/13/2000 DONE
Print Occupancy Form  10/13/2000 DONE
Telephone call  10/13/2000 DONE
Doug Kowalis ###-####
Issue PAID IN FULL permit  10/13/2000 DONE
Plan assigned to (DRS)7/6/2000 10/13/2000 PASS
DetailsDan Stuart
10/13/2000 11:23:44 DRS - activity updated through activity BLDA022 from case BLD00-01936.
Routing - PLANNING9/1/20009/1/200010/3/2000 DONE
Routing to Scott Spjute for review of parking compliance/requirements.
Approved per approval of DR modification and issuance of a zoning certificate.
BLD-Other9/13/20009/13/20009/13/2000 PASS
Dave Hattrick and I reviewd cable gurards with job superintendent. quarter inch cable, to much flex in cable excessive sag with almost no pressure applied laterally
Routing - PLAN CHECK8/30/20008/30/20008/30/2000 FAIL
RECEIVED NEW SUBMITTAL FROM ARCHITECT ONLY ONE COPY - ADDITIONAL SET REQUIRED. NEW SUBMITTAL DELETED THE MOVING OF THE STAIRWAY, PERMITTED UNDER BLD99-03134, TO A NEW OPENING TO BE CUTT IN MEZZANINE. THIS POSSES A PROBLEM 1) THE ENGINEERING RECEIVED IS FOR THE RELOCATION; 2) DEFERRED SUBMITTAL ITEMS OF ORIGINAL PERMIT NOW NEEDS TO BE COMPLETED - THE ENGINEERING CALCS & DETAILS FOR THE STAIR SYSTEM, GUARDRAILS, CABLE SYSTEM INTERMEDIATE SUPPORTS AND THE HANDRAILS ARE REQUIRED TO BE SUBMITTED - 2 SETS.
Plan resubmittals requested  8/30/2000  
FAX TO ARCHIECT CONCERNING REMAINING DEFICIENCIES CAUSED BY MISSING SUBMITTALS & CHANGES TO ORIGINAL PLANS SUBMITTED.
Telephone call  8/30/2000 FAIL
CALLED PACIFIC STEEL, JOHN VERITY; DARIN PEDERSON, AHJ ENGINEERS & JOHN DAY, ARCHITECT TO SEE IF ENGINEERING WAS AVAILABLE FOR THE STIRS GUARDRAILS, CABLE SYSTEM & HANDRAILS SHOWING DESIGN DATA COMPLYING WITH CHAPTER 16, TABLE 16-B AND SECTION 509 UBC. NONE AVAILABLE, WILL PREPARE AND SUBMIT THROUGH THE ARCHITECT OF RECORD.
Plan resubmittals received  8/28/2000  
1 COPY REVISED A0.1, A2.0, A2.1, A8.0, A8.1 , -- 1 COPY M-1 (SUBMITTED UNDER BLD00-02400) 2 COPIES E3.1 EXIT AND EMERGENCY LIGHTING PLANS. 2 COPYS SPECIAL TESTING AND INSPECTION AGREEMENT. TAKEN TO DAN STUART.
Plan resubmittals requested  8/9/2000  
Those items not addressed or incompletely addressed by the architect in response to plan review comments of 7/25/00 have been noted and returned to the architect for appropriate response. Plans on hold at my desk waiting for response.
Routing - PLAN CHECK8/4/2000 8/8/2000 FAIL
Inserted resubmittals into plans. Re-submittals incomplete. Item 1d(i) - new wall type designated in response to review but not clearly indicated on plans as to locations; 1d(ii) - walls altered at area in question but the required dimensions are not noted for use by contractor & inspector to verify compliance; 1e(i) not dimensioned and not changed in room 204. Plans are not to be scalled and when they are micro fiched for our records they can no longer be scaled when referenced so it is very necessary to provide appropriate dimensions on plans; 1f(i) - this re-submittal still pending per architect - comong from structural engineer; 1g - ventilation for restrooms not addressed, new updated certificate of value for mechanical was not provided; #3 - Egress illumination requires emergency system designed & installed incompliance with electrical code when more than 100 occupants. The location of said emergency lighting system and the type of unit to be used is to be shown on the plan as it is required by the building code & fire code. Additional clarification & submittals required.
Plan resubmittals received  8/8/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A2.1, A8.0, A8.1 ONE COPY OF LETTER AND TWO COPIES OF REVISED CALCULATIONS FOR EXT. STAIR. ROUTED TO DAN S. KMM
Routing - FIRE7/31/20008/3/20008/4/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/4/2000 FAIL
Routing - PLUMBING7/28/2000 7/31/2000 PASS
Routing - PLAN CHECK7/7/2000 7/28/2000 FAIL
Faxed and mailed copy of plan review comments to architect for his review and response. Routing plans to plumbing & fire for review while waiting for response.
Routing - PUBLIC WORKS7/6/2000 7/7/2000 PASS
Routing - PLANNING7/7/2000 7/7/2000 FAIL
Need to demonstrate compliance with parking standards per zoning ordinance.
Pending Assignment by MYS7/5/2000 7/6/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  7/6/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Application received  7/5/2000  
Plans ACCEPTED BY PLAN TECH  7/5/2000 PASS
Received Certificate of Value  7/5/2000 DONE