Case Summary (BLD) | | | 10/5/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/12/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/23/2002 | | DONE |
|
|
|
resubmittal received 1 copy A.01, A2.0, A2.1 A8.0, A8.1 2 SETS STAIR DRAWINGS AND CALCULATIONS. TAKEN TO DAN STUART
|
Permanent occupancy | | | 5/8/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9127 issued 5-8-02 to the Powerhouse Event Center.
|
Permanent Occupancy | | 5/2/2002 | 5/2/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 12/3/2001 | | DONE |
|
|
|
Meets compliane w/revised plans - signed final.
|
Temporary occupancy | | | 11/29/2001 | | DONE |
|
|
|
Extended temp occ 11/28/01 / new expiration 2/28/02 per Tim and Jenifer aml
|
BLD-Final | 2/27/2001 | 2/28/2001 | 2/28/2001 | P | NR |
Carl Dependahl
|
|
|
FN OCC-- MARK ###-####, need achd, complete 2/28/2001 5:09:11 PM sprinkler re 2/28/2001 5:09:26 PMlocation 2/28/2001 5:09:49 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### 5 int non-brg wall at 2nd fl.2/21/2001 9:34:41 AM... 2/21/2001 10:48:14 AM 2/21/2001 10:49:05 AM
|
Conference | 1/26/2001 | 1/26/2001 | 1/26/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4070 extended for 30 days as per Tim Hogland.
|
Fee Review-notes | 7/5/2000 | 7/5/2000 | 11/27/2000 | | DONE |
|
|
|
3-12 left mesg w/GC number
|
BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Jim Storey
|
|
|
MARK ###-#### FN TEMP OCC life saftey ok for event. single function only. c/n to be 10/27/2000 5:26:06 PM done in max 2 weeks of this date. 10/27/2000 5:26:56 PM
|
FIRE-Final Inspection | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Rick Jackson
|
|
|
MARK ###-####-- FIRE FN
|
Temporary occupancy | | | 10/27/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4070 issued 10-27-00 to the Powerhouse Event Center.
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | NR |
Jim Storey
|
|
|
TEMP OCC-- MARK ###-#### -INSP THE SAFETY RAIL ON MEZZ
|
BLD-Framing/Rough-in | 10/18/2000 | 10/19/2000 | 10/18/2000 | P | CANC |
|
|
|
###-#### WRONG PERMIT # PER MARK BROWN
|
BLD-Framing/Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | A | FAIL |
Carl Dependahl
|
|
|
Mark ###-#### ; need to submit all spec. insp/ eng's reports, complete stairs, etc upper rest. rm ok to rock. multi permits 10/16/2000 1:21:28 PM
|
Routing - PLAN CHECK | 10/3/2000 | | 10/13/2000 | | PASS |
|
|
|
Received engineering design for use of "cable railing" as intermediate rails for guardrails and method to determine compliance with code. Approved as noted and attached plan revieew comments.
|
Meeting | | | 10/13/2000 | | |
|
|
|
Went to Tim Hoglands office to see if he had approved the policy for design & use of cable rail systems that evolved from meetings between structural division (Dave Hattrick) & plan check division (Marlene Southard, Carl Westfall, Dan Stuart). Could not find a copy of the proposal for his signature. Checking at Marlene's desk it appears it had not been submitted to him before she became ill on Wednesday the 11 of Oct. Tim told me if it was agreed on between the two divisions that he would support the proposal as policy and to go ahead and treat the permit issuance as if the policy was in place. I connected engineering received on cable rail design (10/12/00 from AHJ - Riley Mahaffey), copy of draft policy proposal & copy of letter from Dave Hattrick to Doug Kowallis telling Doug that he needed to provide engineering for cable system or use prescriptive design method per policy and the inspection division would use his project as the test case.
I reviewed the submitted engineering with Carl Westfall to be sure he shared the opinion the engineering accomplished what was proposed. He felt comfortable with the design.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2000 | | PASS |
|
|
|
Approved plans as noted and attached. Routing to permit desk for issuance.
|
Inspection Record Card- Bld | | | 10/13/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/13/2000 | | DONE |
|
|
|
Doug Kowalis ###-####
|
Issue PAID IN FULL permit | | | 10/13/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 7/6/2000 | | 10/13/2000 | | PASS |
Dan Stuart
|
|
|
10/13/2000 11:23:44 DRS - activity updated through activity BLDA022 from case BLD00-01936.
|
Routing - PLANNING | 9/1/2000 | 9/1/2000 | 10/3/2000 | | DONE |
|
|
|
Routing to Scott Spjute for review of parking compliance/requirements.
Approved per approval of DR modification and issuance of a zoning certificate.
|
BLD-Other | 9/13/2000 | 9/13/2000 | 9/13/2000 | | PASS |
|
|
|
Dave Hattrick and I reviewd cable gurards with job superintendent. quarter inch cable, to much flex in cable excessive sag with almost no pressure applied laterally
|
Routing - PLAN CHECK | 8/30/2000 | 8/30/2000 | 8/30/2000 | | FAIL |
|
|
|
RECEIVED NEW SUBMITTAL FROM ARCHITECT ONLY ONE COPY - ADDITIONAL SET REQUIRED. NEW SUBMITTAL DELETED THE MOVING OF THE STAIRWAY, PERMITTED UNDER BLD99-03134, TO A NEW OPENING TO BE CUTT IN MEZZANINE. THIS POSSES A PROBLEM 1) THE ENGINEERING RECEIVED IS FOR THE RELOCATION; 2) DEFERRED SUBMITTAL ITEMS OF ORIGINAL PERMIT NOW NEEDS TO BE COMPLETED - THE ENGINEERING CALCS & DETAILS FOR THE STAIR SYSTEM, GUARDRAILS, CABLE SYSTEM INTERMEDIATE SUPPORTS AND THE HANDRAILS ARE REQUIRED TO BE SUBMITTED - 2 SETS.
|
Plan resubmittals requested | | | 8/30/2000 | | |
|
|
|
FAX TO ARCHIECT CONCERNING REMAINING DEFICIENCIES CAUSED BY MISSING SUBMITTALS & CHANGES TO ORIGINAL PLANS SUBMITTED.
|
Telephone call | | | 8/30/2000 | | FAIL |
|
|
|
CALLED PACIFIC STEEL, JOHN VERITY; DARIN PEDERSON, AHJ ENGINEERS & JOHN DAY, ARCHITECT TO SEE IF ENGINEERING WAS AVAILABLE FOR THE STIRS GUARDRAILS, CABLE SYSTEM & HANDRAILS SHOWING DESIGN DATA COMPLYING WITH CHAPTER 16, TABLE 16-B AND SECTION 509 UBC. NONE AVAILABLE, WILL PREPARE AND SUBMIT THROUGH THE ARCHITECT OF RECORD.
|
Plan resubmittals received | | | 8/28/2000 | | |
|
|
|
1 COPY REVISED A0.1, A2.0, A2.1, A8.0, A8.1 , -- 1 COPY M-1 (SUBMITTED UNDER BLD00-02400) 2 COPIES E3.1 EXIT AND EMERGENCY LIGHTING PLANS. 2 COPYS SPECIAL TESTING AND INSPECTION AGREEMENT. TAKEN TO DAN STUART.
|
Plan resubmittals requested | | | 8/9/2000 | | |
|
|
|
Those items not addressed or incompletely addressed by the architect in response to plan review comments of 7/25/00 have been noted and returned to the architect for appropriate response. Plans on hold at my desk waiting for response.
|
Routing - PLAN CHECK | 8/4/2000 | | 8/8/2000 | | FAIL |
|
|
|
Inserted resubmittals into plans. Re-submittals incomplete. Item 1d(i) - new wall type designated in response to review but not clearly indicated on plans as to locations; 1d(ii) - walls altered at area in question but the required dimensions are not noted for use by contractor & inspector to verify compliance; 1e(i) not dimensioned and not changed in room 204. Plans are not to be scalled and when they are micro fiched for our records they can no longer be scaled when referenced so it is very necessary to provide appropriate dimensions on plans; 1f(i) - this re-submittal still pending per architect - comong from structural engineer; 1g - ventilation for restrooms not addressed, new updated certificate of value for mechanical was not provided; #3 - Egress illumination requires emergency system designed & installed incompliance with electrical code when more than 100 occupants. The location of said emergency lighting system and the type of unit to be used is to be shown on the plan as it is required by the building code & fire code. Additional clarification & submittals required.
|
Plan resubmittals received | | | 8/8/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS A2.1, A8.0, A8.1 ONE COPY OF LETTER AND TWO COPIES OF REVISED CALCULATIONS FOR EXT. STAIR. ROUTED TO DAN S. KMM
|
Routing - FIRE | 7/31/2000 | 8/3/2000 | 8/4/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 8/4/2000 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/28/2000 | | 7/31/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/7/2000 | | 7/28/2000 | | FAIL |
|
|
|
Faxed and mailed copy of plan review comments to architect for his review and response. Routing plans to plumbing & fire for review while waiting for response.
|
Routing - PUBLIC WORKS | 7/6/2000 | | 7/7/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 7/7/2000 | | 7/7/2000 | | FAIL |
|
|
|
Need to demonstrate compliance with parking standards per zoning ordinance.
|
Pending Assignment by MYS | 7/5/2000 | | 7/6/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 7/6/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
|
Application received | | | 7/5/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2000 | | PASS |
|
|
|
|
Received Certificate of Value | | | 7/5/2000 | | DONE |
|
|
|
|