Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01941
StatusFinaled
Name CLEAR CHANNEL COMMUNICATIONS
Site Address 827 E PARK BLVD Unit: #201
Project NameMORRISON FNDTN BLDG
Customer Number 
ePlanReviewNo
Description
Constructing a new 17,459 sq. ft. tenant space on the majority of the first and second floors of a 24,288 sq. ft two story building for office and radio station/studio use per approved plans on file. (1st Floor Tenant Area - 8,812 sq.ft.) (2nd Floor Tenant Area - 8,647 sq.ft.) Building shell done under BLD96-3235. Work to include new interior stairway with handrails/guardrails connecting first and second floors, new second floor steel beam framing at new stair opening, reinforcement/modifications to existing steel roof framing in order to support new rooftop equipment, new wall portions of 2nd floor non-rated corridor, new interior walls with doors and windows, interior finish, new suspended ceiling, new emergency generator and screen, fire sprinkler work, alarm work, new plumbing, new mechanical, and new electrical work. NOTE: This tenant cannot receive a permanent Certificate of Occupancy until the Shell building permit is completed and approved. NOTE: This building is fully fire sprinklered for area increase and any fire sprinkler work shall require plans, data and related submittals for permitting before any related work. (P.C.#548-00) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes  9/23/2002 DONE
Plan resubmittals received  7/10/2002 DONE
RESPONSE LETTER 2 COPIES A-10 REVISED DETAIL SHEET.
Plan resubmittals received  7/10/2002 DONE
REVISIONS TO SHEETS S0.1 & A2.1 AND A6.1 (ADDENDUM #4 2 COPIES OF STRUCTURAL CALCULATIONS.
Plan resubmittals received  7/10/2002 DONE
2- copies addenda #2 & #3 2 copies set of revised plans 1 copy structural calculations 2 copies generator set cut sheets. gave to jason.
Permanent occupancy  4/16/2001 DONE
Perm. Occ. Cert. #8632 issued 4-16-01 to Clear Channel Communications.
Permanent Occupancy 4/2/20014/2/2001 DONE
Details
BLD-Final3/30/20014/2/20014/2/2001APASS
DetailsTony Young
###-####
perm. c of o ok, shell bp # 96-03235 items ok now, taken care of w/ T.I. bp #00-01941 4/2/2001 11:37:20 AM
BLD-Final3/23/20013/26/20013/26/2001ACANC
DetailsTony Young
Scheduled by Inspector: 415 On 3/23/2001 1:52:22 PM
BLD-Final3/23/20013/26/20013/26/2001ANR
DetailsTony Young
Scheduled by Inspector: 415 On 3/23/2001 1:52:22 PM
BLD-Final3/26/20013/26/20013/26/2001PNR
DetailsTom Arcoraci
Scheduled by Inspector: 415 On 3/26/2001 11:19:32 AM cn issued by 415 3/26/2001 3:10:37 PM
FIRE-Final Inspection3/22/20013/23/20013/23/2001APASS
DetailsRick Jackson
###-####
BLD-Final3/22/20013/23/20013/23/2001PPART
DetailsTony Young
###-####
temp. occ. signed on card, pending final special inspection report, proof of final on shell permit in 1996 3/23/2001 1:56:19 PM
BLD-Final3/22/20013/23/20013/23/2001PPART
DetailsTony Young
###-####
temp. occ. signed on card, pending final special inspection report, proof of final on shell permit in 1996 3/23/2001 1:56:19 PM
BLD-Final3/19/20013/21/20013/21/2001PNR
DetailsTony Young
Joe ###-#### late as possible
FIRE-Final Inspection3/19/20013/20/20013/20/2001PFAIL
DetailsRick Jackson
###-#### need annual sprinkler test; exit signs; c/n issued 3/21/2001 6:54:20 AM
BLD-Framing/Rough-in2/20/20012/20/20012/20/2001PPART
DetailsRuss Owen
###-####lower floor and rest of upper floor ok to drop ceiling tile. 2/20/2001 4:54:06 PM
BLD-Framing/Rough-in2/14/20012/15/20012/15/2001PPART
DetailsJim Storey
###-#### Joe c/n ceilling top of stairs light and perimitor wires over 8" must be supported/ handrails per 1003.3.6 ubc 97 2/15/2001 4:57:43 PM
FIRE-Conference2/13/20012/14/20012/14/2001APART
DetailsRick Jackson
###-#### reviewed exit sign plan with architect and general contractor - minor changes needed for directional arrows; sprinklers heads within 6 feet of each other on second floor 2/14/2001 8:34:52 AM
BLD-Framing/Rough-in1/2/20011/2/20011/2/2001PPART
DetailsTony Young
FR INSP- JOE ###-####
int. stairs, roof screen wall ok to cover pending special inspection reports, no electrical 1/2/2001 1:27:26 PM
BLD-Framing/Rough-in12/29/200012/29/200012/29/2000PCANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/29/2000 at 07:45:30. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/29/2000 at 08:30:20.
BLD-Framing/Rough-in10/30/200010/31/200010/31/2000PNR
DetailsTony Young
south side of 1st floor Joe ###-####
need to finish screwing studs in and need electrical rouph 10/31/2000 1:48:11 PM
FIRE-Conference10/23/200010/24/200010/24/2000APART
DetailsRick Jackson
Joe ###-#### discussed fire alarm plans are needed for submittal; told to get knox box, fire sprinkler annual inspection is overdue, 10/24/2000 3:38:34 PM
BLD-Framing/Rough-in10/19/200010/20/200010/20/2000APART
DetailsTony Young
south side of 1st floor joe ###-####
note: north side, 1st floor int. framing ok to cover, not so. side 10/20/2000 2:03:28 PM
BLD-Framing/Rough-in10/17/200010/18/200010/18/2000PPART
DetailsRuss Owen
###-####c/n posted, ok to rock upper floor. 10/19/2000 8:46:28 AM
BLD-Other10/12/200010/13/200010/13/2000APASS
DetailsTom Arcoraci
as per Tony ** Joe ###-#### profit meeting partial wall cover ok 10/13/2000 11:03:15 AM
BLD-Other10/12/200010/13/200010/13/2000APASS
DetailsTom Arcoraci
as per Tony ** Joe ###-#### profit meeting partial wall cover ok 10/13/2000 11:03:15 AM
Issue PAID IN FULL permit  9/7/2000 DONE
Routing - FIRE9/5/20009/6/20009/6/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK9/6/2000 9/6/2000 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/6/2000 PASS
Inspection Record Card- Bld  9/6/2000 DONE
Print Occupancy Form  9/6/2000 DONE
Telephone call  9/6/2000 DONE
two guys from CSDI came in Tom and Rob called to see if the permit was ready so I gave them the fees and they are going to be right back
Plan assigned to (JCB)7/14/2000 9/6/2000 PASS
DetailsJason Blais
9/6/2000 14:40:11 JCB - activity updated through activity BLDA022 from case BLD00-01941.
Routing - PLAN CHECK8/15/2000 9/5/2000 PEND
Permit and plan approval depedent on Fire Dept. approval. Plans routed to Fire Dept for 2nd review.
Plan Reviewer's activity  8/28/2000 HOLD
Most items were addressed. Still two items from structural engineer need to be addressed and the corridor on the second floor needs to be resolved. The shell building plans were not followed (Tunnel System). They ran corridor walls up to the non-rated roof deck. Shell permit will need to be ammended. (Still not finaled) Plans will be put on hold until these items can be resolved. Project architect was notified by phone. He acknowledged the issues and said he would pursue resolvement.
Routing - FIRE8/10/20008/15/20008/15/2000 FAIL
DetailsBill Alexander
Lack clarity in UFC issues-corridor construction, doors and door swing, etc.
Plan Review Completed(1st rev)  8/15/2000 FAIL
Plan resubmittals requested  8/10/2000  
Plan resubmittals and response required for further review.
Routing - PLAN CHECK7/18/2000 8/10/2000 FAIL
Plan review report sent and faxed to the architect. Plan resubmittals and response required for further review. Plans routed to fire dept.
Routing - PUBLIC WORKS7/14/2000 7/18/2000 PASS
Pending Assignment by MYS7/6/2000 7/14/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  7/14/2000 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  7/13/2000 DONE
Received Certificate of Value  7/6/2000 DONE
Application received  7/6/2000