Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-02026
StatusFinaled
Name S-SIXTEEN LIMITED PARTNERSHIP
Site Address 6989 S FEDERAL WAY
Project NameNORTHWEST LODGE
Customer Number 
ePlanReviewNo
Description
NORTHWEST LODGE & SUITES * TO CONSTRUCT A NEW, 69 UNIT, 35,788 SQ. FT. THREE STORY WOOD FRAMED, TYPE V ONE-HOUR, FULLY SPRINKLERED, MOTEL WITH A INDOOR SWIMMING POOL AND SPA AREA. NOTE THIS BUILDING IS FULLY FIRE SPRINKLERED FOR AREA INCRREASE. FIRE SPRINKLER (OVERHEAD AND UNDERGROUND) AND ALARM PLANS/SUBMITTALS REQUIRE PRIOR APPROVAL AND PERMITTING PRIOR TO ANY RELATED WORK. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. WORK INCLUDED WITH THIS PERMIT IS ON SITE LANDSCAPEING AND PARKING LOT. NOTE THIS PERMIT DOES NOT COVER THE INSTALLATION OF THE INDOOR SWIMMING POOL AND SPA ALONG WITH RELATED EQUIPMENT. DRH97-00095, DRH99-00035, PC#563-00 MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/17/2015 DONE
Fee Review-notes7/13/20007/13/200011/9/2001 DONE
BLD-Final11/6/200111/7/200111/7/2001APASS
DetailsJim Storey
###-#### DUTCH final ok. 11/7/2001 11:09:11 AM
Permanent Occupancy 11/7/200111/7/2001 DONE
Details
Permanent occupancy  11/7/2001 DONE
Perm. Occ. Cert. #8897 issued 11-7-01 to the Northwest Lodge & Suites.
Print permit w/o conditions  9/14/2001 DONE
BLD-Final6/14/20016/14/20016/14/2001PPART
DetailsJim Storey
###-#### handrail clearance at pool/ perm rated doors first and third floor stair west end of bld/signage occ.load./othere insp. to sign perm. 6/14/2001 5:20:22 PM
FIRE-Final Inspection6/12/20016/12/20016/12/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/12/2001 9:48:54 AM
Code Occupancy Approval  6/11/2001 PASS
SMALL CHANGES MADE TO LANDSCAPE BUT MEETS CODE SO FINAL SIGNED OFF.
FIRE-Final Inspection6/6/20016/8/20016/8/2001PFAIL
DetailsRick Jackson
fire fn-- rob ###-#### c/n issued 6/8/2001 4:44:30 PM
BLD-Framing/Rough-in5/24/20015/24/20015/24/2001PPASS
DetailsSteven Webb
grid ceiling insp -- dutch ###-####
BLD-Framing/Rough-in5/17/20015/17/20015/17/2001PPART
DetailsSteven Webb
###-#### ceiling grid Fire assemblies and grid ok for cover 1, 2, 3, floor, pool ok. NOT conference, corridor 133 and mechanical area, and lobby not been inspected. 5/17/2001 2:25:03 PM
BLD-Framing/Rough-in5/16/20015/16/20015/16/2001PPART
DetailsSteven Webb
grid ceiling dutch ###-#### ok to drop tiles 3rd floor except 1 location, 2nd floor 3 location, bottom floor corridor except 1 location. No additional tiles until fire caulking completed in pool area, conference room. No tiles in corridor 131 totally. 5/16/2001 3:13:58 PM
BLD-Framing/Rough-in5/14/20015/15/20015/15/2001PPART
DetailsSteven Webb
###-#### Susp. ceiling--ok to drop difficult tiles and light in only except pool area--ok. 5/15/2001 3:35:21 PM
BLD-Conference5/14/20015/14/20015/14/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 5/14/2001 11:13:34 AM Discussed with David Ruby in regards to one-hr requirements on the windows outside the pool area--After meeting with Mike Phillips, Bob Archabald and myself was determined that the on hr is needed according to 97 UBC 1005.3.3.2 Exit Enclosures 5/14/2001 11:16:52 AM
BLD-Conference5/14/20015/14/20015/14/2001PPASS
DetailsSteven Webb
Added by Inspector: 420 On 5/14/2001 2:38:33 PM Issued a correction notice informing Petra that the windows and frame will need to comply with the 1-Hr fire rating according to 1005.3.3.2 5/14/2001 2:40:09 PM
Voucher Form  5/14/2001 DONE
didn't do plan modification
Fee Review-notes4/20/20014/20/20014/20/2001 DONE
(F) Reprint permit  4/20/2001 DONE
BLD-Conference4/17/20014/17/20014/17/2001PPASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 4/17/2001 3:35:40 PM Requested contractor have all subs supply "cut sheets" on product and installlation specs on fire assembly products used prior to final inspection. 4/17/2001 3:36:57 PM
BLD-Conference4/13/20014/13/20014/13/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 4/13/2001 1:38:47 PM
BLD-Framing/Rough-in4/2/20014/3/20014/3/2001ACANC
DetailsJim Storey
PEtra const ###-#### trans to s web via his requist. 4/3/2001 7:56:34 AM
BLD-Framing/Rough-in4/3/20014/3/20014/3/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 4/3/2001 8:21:51 AM Pool Area -- ok to cover. 4/3/2001 8:36:01 AM
BLD-Framing/Rough-in4/2/20014/2/20014/2/2001PFAIL
DetailsSteven Webb
dutch ###-#### C/N posted in job trailer. 4/2/2001 2:34:15 PM
BLD-Framing/Rough-in3/8/20013/9/20013/9/2001PPART
DetailsSteven Webb
###-#### ok to cover 2nd and 3rd floors, lounge and managers quarters excluding fireplace. 3/9/2001 1:44:29 PM
BLD-Framing/Rough-in3/7/20013/8/20013/8/2001ACANC
DetailsJim Storey
###-#### steve web called and is doing the insp will add. 3/8/2001 9:31:50 AM
BLD-Framing/Rough-in3/8/20013/8/20013/8/2001AFAIL
DetailsSteven Webb
Scheduled by Inspector: 420 On 3/8/2001 9:42:53 AM c/n issued--need mechanical and fire r. i. prior to insulation on 3rd floor and 1st floor, north side including pool, lounge and managers quarters. 3/8/2001 12:13:26 PM
FIRE-Sprinkler Rough-in2/28/20012/28/20012/28/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 2/28/2001 10:22:47 AM okay to cover 3rd floor and stairs
BLD-Conference2/28/20012/28/20012/28/2001PPASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 2/28/2001 3:22:44 PM Met with petra, Dave lightfoot, Dixie in regards to covering portion of lodge without mechanical, no duck for heat or air(window units) exhaust fan chases were to be left open pending mechanical inspections). 2/28/2001 3:24:16 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsSteven Webb
###-####: Ok to cover 2nd floor room and corridor. 2/21/2001 10:09:55 AM
BLD-Framing/Rough-in2/16/20012/20/20012/20/2001ACANC
DetailsJim Storey
###-####
CHANGE STATUS TO (ISS)  2/14/2001 DONE
BLD-Framing/Rough-in2/12/20012/13/20012/13/2001PPASS
DetailsSteven Webb
###-####--Passed for 17 guest units on the 1st floor on the south side--ok to cover. 2/13/2001 4:18:36 PM
FIRE-Sprinkler Rough-in2/13/20012/13/20012/13/2001APART
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/13/2001 10:30:52 AM okay to cover first and second floor suites only 2/13/2001 10:31:27 AM
Override - Parcel Holds  2/12/2001  
FIRE-Sprinkler Rough-in2/7/20012/7/20012/7/2001AFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/7/2001 10:18:25 AM attempted r/i inspection for cover of second and first floor; plans not approved yet. they were given approval to proceed with sprinkler work by Bill Alexander but not to call in for inspections until plans are approved 2/7/2001 10:20:05 AM
BLD-Conference1/31/20011/31/20011/31/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 1/31/2001 11:19:58 AM ; Received submittal for a proposed portco to lodge, refered to supervisor 325, instructed contractor on supervisor recommendation to resubmit to plan review. 1/31/2001 11:43:27 AM
BLD-Framing/Rough-in1/22/20011/22/20011/22/2001PPASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 1/22/2001 12:54:39 Pm conference not framing, reviewed bathroom exhaust 1-hr chases, and received a eng. repair for truss number arix which will be cut at laundry chute area. 1/22/2001 2:50:54 PM
BLD-Conference1/11/20011/11/20011/11/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 1/11/2001 8:28:36 AM /Reviewed detail of proposed bathroom fan exhaust 1-Hr. chase detail. 1/11/2001 11:50:52 AM
BLD-Conference1/8/20011/8/20011/8/2001APASS
DetailsSteven Webb
Added by Inspector: 420 On 1/8/2001 12:00:58 PM Discussed plumbing vent chases with super, arictect, mechanical contractor.
BLD-Concrete12/27/200012/27/200012/27/2000APASS
DetailsSteven Webb
Added by Inspector: 420 On 12/27/2000 11:35:46 AM pool rebar ok
BLD-Conference12/27/200012/27/200012/27/2000APASS
DetailsSteven Webb
Added by Inspector: 420 On 12/27/2000 11:36:50 AM regarding penetration of 1 hr wall with plumbing.
Plan resubmittals received  12/19/2000 DONE
Received Plan resubmittals from ZGA. forwarded same to Jim Storey. 12/19/00 DAR
Additional plans submitted  11/30/2000 DONE
Received additional Plans 81/2" X 11" from ZGA Architects, forwarded same to Jim Storey. 11/30/00
BLD-Foundation11/22/200011/27/200011/27/2000APART
DetailsJim Storey
special inspector on site Dutch ###-#### placed wiyh special insp. pending report. 11/27/2000 10:00:05 AM
BLD-Footing11/20/200011/21/200011/21/2000PPART
DetailsJim Storey
FT INSP-- DUTCH- CELL ###-#### -INTERIOR FT ft at f-14 spoke with brian smith eng. ok to oversize w/1#4 bar each way to acomadate pipe entrution. 11/21/2000 11:34:06 AM
BLD-Foundation11/15/200011/16/200011/16/2000APART
DetailsCarl Dependahl
SPECIAL INSPECTOR CALLED Dutch ###-####
BLD-Foundation11/13/200011/14/200011/14/2000PNR
DetailsCarl Dependahl
###-####,pend report from spec. insp. 11/14/2000 12:02:50 PM
BLD-Footing10/31/200011/1/200011/1/2000PPASS
DetailsJim Storey
FT INSP- DUTCH CELL ###-#### placed with special insp. pending report. 11/1/2000 3:14:04 PM
BLD-Conference10/30/200010/31/200010/31/2000APASS
DetailsJim Storey
Dutch Wilkenson ###-#### special insp. on project. fax code section of 711.3 to jerry frank. 10/31/2000 10:40:11 AM
(F) Reprint permit  10/24/2000 DONE
Issue PAID IN FULL permit  10/23/2000 DONE
(F) Reprint permit  10/23/2000 DONE
Plan Reviewer's activity  10/19/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/19/2000 DONE
Inspection Record Card- Bld  10/19/2000 DONE
Print Occupancy Form  10/19/2000 DONE
Telephone call  10/19/2000 DONE
called Andrew Simmonds at ###-#### permit ready for pickup
Plan assigned to (M_P)7/17/2000 10/19/2000 PASS
DetailsMike Phillips
10/19/2000 08:56:09 M_P - activity updated through activity BLDA022 from case BLD00-02026.
Routing - FIRE10/16/200010/16/200010/16/2000 PASS
DetailsBill Alexander
Plan resubmittals received  10/16/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A5.1, M2.3, 92.1, P2.2, 93.2. ADDITIONAL RESPOPNSE, AND REVISED EXHIBIT "A" ROUTED TO MIKE P. KMM
Routing - FIRE10/11/200010/13/200010/13/2000 FAIL
DetailsBill Alexander
Chemical submittal lacks required information. Other UBC/UFC related issues.
Routing - PLAN CHECK9/18/2000 10/11/2000  
Routing to Fire.
Routing Off Site - STRUCTURAL9/26/2000 10/3/2000 PASS
SENT RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. 9/26/00 DAR
NO FURTHER REVIEW REQUIRED.
Plan resubmittals received  9/26/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, STEVE TURNEY, SMALL DOCUMENTS AND THREE SETS OF SHEETS S1.1, S1.2, S1.3, S2.1,S2.2, S2.4, S2.6, FORWARDED SAME TO MICHAEL PHILLIPS. 9/26/00 DAR
Routing - PLUMBING9/13/2000 9/18/2000 PASS
RESUBMITTALS
Plan resubmittals received  9/13/2000 DONE
RECEIVED 3 SETS OF SHEETS C-3 FROM MIKE SHEPPARD, INCORPORATED WHITH PLANS AND FORWARDE ALL TO PLUMBING. 9/13/00 DAR
Routing - FIRE9/5/20009/6/20009/6/2000 FAIL
DetailsBill Alexander
Sprinkler water supply info lacking. Need verification of HazMat Article 80 compliance, and fire resistive construction requirements per UBC and related UFC.
Plan Review Completed(1st rev)  9/6/2000 FAIL
Routing - PLAN CHECK8/8/2000 9/5/2000  
Routing to fire
Plan Reviewer's activity  9/5/2000 FAIL
Additional information required for follow up review.
Routing Off Site - STRUCTURAL7/18/2000 8/30/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional information required for follow up review.
Routing - PLUMBING8/2/2000 8/8/2000 PASS
Plan resubmittals received  8/8/2000 DONE
RECEIVED ONE COPY OF RESPONSE LETTER AND THREE COPIES OF ORIGINAL CALCULATION UNDER THE 1994 UBC.
REVIEW COMMENTS UNDER THE ORIGINAL BUILDING PERMIT SUBMITTAL WITH THE STRUCTURAL REVIEW COMMENTS. RESPONSE TO THE ORGINIAL REVIEW COMMENTS AND ASSOCIATED ADDITIONAL CALCULATION. ROUTED ONE COPY TO OUTSIDE ENG. AND TWO TO MIKE P. KMM
Routing - PLANNING7/20/2000 8/2/2000 PASS
approved per DRH97-95 & DRH99-35.
Routing - PUBLIC WORKS7/17/2000 7/20/2000 PASS
Plans ACCEPTED BY PLAN TECH  7/17/2000 PASS
Received Certificate of Value  7/13/2000 DONE
Application received  7/13/2000  
Plan routing begun/NEW & ADDTN    DONE
Recd Pcfee & Taken To Pln CK     
Routing - PLAN CHECK9/6/2000   PEND