Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02037
StatusFinaled
Name ELECTRICAL BACK-FEED
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-ELECT BACKFEED
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - "CONCOURSE B" - ELECTRICAL BACKFEED) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. The concourse floor above the new construction area is intended to comply as a 1-hr occupancy separation. To construct a 375 square foot electrical room at the ground level under the North end of "Concourse B" to accommodate the backfeed of electrical power to support the existing terminal building while construction of the elevated roadway and new terminal building occur. A 141 square foot airport security room is also being constructed. Work is to include concrete foundations, concrete slab on grade, exterior nonbearing walls, spray applied fireproofing, and modifications to the fire sprinkler system. The fire sprinkler system within the new construction area shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-565-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in2/7/20012/8/20012/8/2001APASS
DetailsJim Storey
###-#### p&z is signed off on computer. talk to scott brown if a qustion. 2/8/2001 9:11:55 AM
Letter of compliance  2/8/2001 DONE
Letter of Compliance #21340 issued 2-8-01.
FIRE-Final Inspection2/6/20012/6/20012/6/2001PPASS
DetailsRick Jackson
###-####
BLD-Final2/6/20012/6/20012/6/2001PCANC
DetailsJim Storey
###-#### via phone measage. 2/6/2001 2:11:07 PM
FIRE-Final Inspection2/2/20012/2/20012/2/2001PNR
DetailsRick Jackson
###-#### contractor said the sprinklers aren't ready, not tied into the main feed 2/2/2001 3:39:27 PM
Code Occupancy Approval  2/2/2001 PASS
THERE IS NO PLANNING REQUIREMENTS HERE TO INSPECT. I CALLED JIM AND ASKED HIM TO MARK N/A OR TO SIGN FOR ME.
BLD-Other11/24/200011/24/200011/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/24/2000 at 09:20:07. Contact: ###-####. fire proofing inprogess pending special insp. report. 11/24/2000 1:48:46 PM
BLD-Other11/24/200011/24/200011/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/24/2000 at 09:20:07. Contact: ###-####. fire proofing inprogess pending special insp. report. 11/24/2000 1:48:46 PM
BLD-Other11/17/200011/20/200011/20/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/17/2000 at 11:41:57. Contact: ###-####. called and cancled ace. 11/20/2000 2:06:01 PM
BLD-Framing/Rough-in11/3/200011/6/200011/6/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/03/2000 at 17:06:06. Contact: ###-####. need insp. of top wall fire track. 11/6/2000 11:01:25 AM
BLD-Framing/Rough-in11/6/200011/6/200011/6/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 09:36:09. Contact: ###-####. pending beam protection. 11/6/2000 2:29:59 PM
BLD-Conference10/24/200010/26/200010/26/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 07:53:13. Contact: ###-####. call after fire rough in. 10/26/2000 2:06:35 PM
BLD-Conference10/24/200010/25/200010/25/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2000 at 16:26:38. Contact: ###-####.
Issue PAID IN FULL permit  9/21/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/24/2000 PASS
Inspection Record Card- Bld  8/24/2000 DONE
Print Occupancy Form  8/24/2000 DONE
Telephone call  8/24/2000 DONE
called Matt Petaja at ###-#### left a message for him
Plan assigned to (CJW)7/21/2000 8/24/2000 PASS
DetailsCarl Westfall
8/24/00 11:48:22 CJW - activity updated through activity BLDA022 from case BLD00-02037.
Routing - PLAN CHECK8/14/2000 8/24/2000 PASS
Drawings approved after resubmittal review.
Plan Reviewer's activity  8/24/2000 PASS
Drawings approved, with conditions, after resubmittal review.
Plan resubmittals received  8/22/2000  
2 24 x 36 revused sheets A1.1, A2.1. A4.1 A8.1 1 COPY 8.5 X 11 LETTER RESPONDING TO BUILDING DEPARTMENT COMMENTS FOR BLD00-02037
Routing - PLANNING8/9/2000 8/14/2000 PASS
Routing - FIRE8/8/20008/9/20008/9/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/9/2000  
First review failed plan check.
Routing - PLAN CHECK7/21/2000 8/8/2000  
First review failed.
Plan Reviewer's activity  8/7/2000  
UBC plan review started August 7, 2000 and finished the next day. A response from the architect is required. See the conditions list.
Pending Assignment by MYS7/21/2000 7/21/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  7/21/2000 DONE
Route to PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  7/18/2000 DONE
Received Certificate of Value  7/14/2000 DONE
Application received  7/14/2000  
Recd Pcfee & Taken To Pln CK  7/14/2000 DONE
Case Summary (BLD)     
Plan Review Report