BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 15:21:40. Contact: ###-####. c. of c. issued 2/8/2001 10:49:31 AM
|
DOC - Permit Finaled | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 2/8/2001 10:50:02 AM
|
BLD-Final | 2/6/2001 | 2/7/2001 | 2/7/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 13:45:38. Contact: . c/n issued--handrails needed on outside decks, tempered glass needed east of dining room door, and electrical final needed. 2/7/2001 3:44:16 PM
|
BLD-Framing/Rough-in | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 10:37:00. Contact: .ok to insulate. 11/13/2000 10:27:40 AM
|
BLD-Framing/Rough-in | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Russ Owen
|
|
|
shear panel bill ###-####ok to side. 10/26/2000 1:37:29 PM
|
BLD-Framing/Rough-in | 10/23/2000 | 10/24/2000 | 10/24/2000 | A | CANC |
Russ Owen
|
|
|
bill ###-#### shear wall
|
BLD-Framing/Rough-in | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | PART |
Russ Owen
|
|
|
SHEAR WALL ###-#### BILLrear wall c/n. 10/25/2000 8:43:22 AM
|
BLD-Framing/Rough-in | 10/5/2000 | 10/9/2000 | 10/9/2000 | A | FAIL |
Carl Dependahl
|
|
|
SHEAR PANEL BILL-- ###-####; not per plans 10/9/2000 11:19:05 AM
|
Issue PAID IN FULL permit | | | 8/23/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/7/2000 | | 8/16/2000 | | PASS |
Steve Munroe
|
|
|
8/16/2000 15:21:38 SAM - activity updated through activity BLDA022 from case BLD00-02043.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2000 | | DONE |
|
|
|
|
BLD-Foundation | 8/11/2000 | 8/14/2000 | 8/14/2000 | P | PART |
Russ Owen
|
|
|
wall insp. ###-####; Randy. Appears ok no approved plans. 8/15/2000 7:50:09 AM
|
BLD-Footing | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | PART |
Russ Owen
|
|
|
###-#### Early start appears ok. 8/14/2000 9:29:27 AM
|
Plan assigned to (DJO) | 7/17/2000 | 7/17/2000 | 8/7/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2000 | 7/17/2000 | 7/18/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 7/17/2000 | 7/17/2000 | 7/18/2000 | | PASS |
|
|
|
|
Application received | | | 7/17/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 7/18/2000 | 7/18/2000 | | | PEND |
|
|
|
|
Early Start Permit | | | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
8/7/00 10:35 Called and talked to Tony with Draftech about needing engineering for the rear and the living room bay of the residence.
8/7/00 11:49 Called and talked to Bill, he had me call Jarod. I went over with Jarod what I need engineered and or redesigned. He will let me know what is happening.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
ONLY ONE SET IS BEING APPROVED DUE TO EXCESSIVE RED-LINING.
|