(F) Reprint permit | | | 1/30/2008 | | |
|
|
|
|
Plan Review Report | | | 12/1/2003 | | |
|
|
|
|
Fee Review-notes | 7/18/2000 | 7/18/2000 | 9/23/2002 | | DONE |
|
|
|
|
DOC - L/C Approved | | | 9/9/2002 | | DONE |
|
|
|
LC issued to Shoreline Tech Center #22577
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm and fire life/safety finaled 9/6/2002 9:17:37 AM
|
BLD-Final | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 09:25:01. Contact: ###-####....ok shell only , need bld01-03253 (t/i?) finalled as well. 9/6/2002 4:36:39 PM
|
FIRE-Final Inspection | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 13:44:11. Contact: ###-####. need address; move knox box to Americana side of building; zones defined for fire monitoring company; map at FACP and in knox box 8/23/2002 3:10:58 PM
|
BLD-Conference | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 14:27:11. Contact: ###-####.w/j.c...ok to infill window within overhand distance at front wall, near existing 4hr wall (Last window of 3...) 7/12/2002 10:48:11 AM
|
FIRE-Sprinkler Rough-in | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 12:27:31. Contact: ###-####. need sprinkler plans and alarm plans; antifreeze loop installed in canopies without plans; system over 100 heads and not monitored; combustibles above ceiling; ceiling not installed in all areas with pendant heads at ceiling level 10/1/2001 9:13:35 AM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PART |
Carl Dependahl
|
|
|
east canopy's ###-####, frame appears ok; need clarify thru-bolts for ledgers at east side & length of c-channels for lintels (20.7 ft. req'd) 8/10/2001 11:22:43 AM
|
Override - Parcel Holds | | | 8/8/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Tom Arcoraci
|
|
|
JC ###-#### ok to cover north west canopy 7/22/2001 10:53:10 PM
|
CHANGE STATUS TO (ISS) | | | 7/23/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/23/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/20/2001 | | |
|
|
|
|
BLD-Concrete | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Carl Dependahl
|
|
|
masonary grouting ###-####; columns at south 7/10/2001 5:29:34 PM
|
Override - Parcel Holds | | | 7/10/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2001 | | PASS |
|
|
|
Plan modification approved. $773.00 charged.
|
Telephone call | | | 7/9/2001 | | DONE |
|
|
|
called cornel gave dollar amount
|
Plan assigned to (CJW) | 6/18/2001 | | 7/9/2001 | | PASS |
Carl Westfall
|
|
|
7/9/01 14:35:55 CJW - activity updated through activity BLDA022 from case BLD00-02062.
|
Routing - PLAN CHECK | 7/2/2001 | | 7/9/2001 | | PASS |
|
|
|
Plan Modification approved.
|
BLD-Concrete | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Jim Storey
|
|
|
concrete--jc ###-#### colm. rebar and clean outs ok. 7/6/2001 1:24:03 PM
|
Override - Parcel Holds | | | 7/5/2001 | | |
|
|
|
|
Routing - FIRE | 6/25/2001 | 6/28/2001 | 7/2/2001 | | PASS |
Bill Alexander
|
|
|
plan modification
|
Routing - PLANNING | 6/21/2001 | | 6/25/2001 | | PASS |
|
|
|
DRH00-79 modification
|
BLD-Foundation | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### masonry cols ok to continue 6/22/2001 11:36:08 AM
|
BLD-Footing | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Carl Dependahl
|
|
|
ft jc----- ###-#### - at this address 713 s 14th ???...masonry cols at west....ftgs ok 6/21/2001 11:30:58 AM
|
Override - Parcel Holds | | | 6/21/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2001 | | 6/21/2001 | | PASS |
|
|
|
Routed for plan modification review.
|
Override - Parcel Holds | | | 6/20/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 6/20/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 6/6/2001 | | 6/18/2001 | | |
|
|
|
Plan modification received.
|
Plan resubmittals received | | | 6/18/2001 | | DONE |
|
|
|
Received three sets of planresubmittals, sheet S-3 and two sets of revised caculations, forwarded same to Carl Westfall. 6/18/01 DAR
|
Plan resubmittals received | | | 6/7/2001 | | DONE |
|
|
|
Received plan resubmittals from Larson Architects,3 sets plus small documents and revised structural caculations, forwarded same to Carl Westfall. 6/7/01 DAR
|
BLD-Framing/Rough-in | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PART |
Carl Dependahl
|
|
|
masonry cells ###-####; infills at north side; struct. steel lintels installed over infill...need complete plans, looks ok. 6/1/2001 2:36:43 PM
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/8/2001 4:31:22 PM w/westfall re modification/deletion of car park area
|
BLD-Conference | 4/30/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 15:10:47. Contact: ###-####. Contractor / developer request modification...demo parking structure rather than reuse; submit written request w/ plan sheets for review. 5/1/2001 4:04:25 PM
|
BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/30/2001 4:04:20 PM w/ Cornell Larson...may need add'l plan/ submittal for changes...Meet onsite??
|
Issue PAID IN FULL permit | | | 11/29/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/18/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/18/2000 | | DONE |
|
|
|
called permit ready and fees due and need ACHD cert
|
Plan assigned to (CJW) | 8/10/2000 | | 10/18/2000 | | PASS |
Carl Westfall
|
|
|
10/18/00 08:15:28 CJW - activity updated through activity BLDA022 from case BLD00-02062.
|
Routing - PUBLIC WORKS | 10/16/2000 | | 10/17/2000 | | PASS |
|
|
|
|
Routing - FIRE | 10/16/2000 | 10/16/2000 | 10/16/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 8/24/2000 | | 10/16/2000 | | PASS |
|
|
|
Drawings approved after 2nd UBC plan review.
|
Plan resubmittals received | | | 10/16/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS SP-3, A-1, S-1, S-4. AND STRUCT. CALCS. ROUTED TO CARL. KMM
|
Plan resubmittals received | | | 9/26/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM CORNEL LARSONSMALL DOCUMENTS AND THREE SETS WITH SHEETSSP-2, A-1, A-2,A-5, A-6, A-7, S-2, S-2,S-4 AND P1.0, FORWARDED SAME TO CARL WESTFALL. 9/26/00 DAR
|
Routing - FIRE | 8/17/2000 | 8/23/2000 | 8/23/2000 | | FAIL |
Bill Alexander
|
|
|
Lack Hydrant location and UBC-UFC related issues covered by Carl W.
|
Plan Review Completed(1st rev) | | | 8/23/2000 | | |
Bill Alexander
|
|
|
Failed first UBC and UFC plan reviews.
|
Routing - PUBLIC WORKS | 8/17/2000 | | 8/17/2000 | | FAIL |
|
|
|
brian murphy failed requires drainage plan revision8/17/00
|
Routing - PLAN CHECK | 7/25/2000 | | 8/16/2000 | | |
|
|
|
Failed first UBC plan review.
|
Plan Reviewer's activity | | | 8/14/2000 | | |
|
|
|
Failed first UBC plan review. UBC plan review started August 14, 2000 and finished August 16, 2000. A response from the architect is required. See the conditions list.
|
Plan assigned to (JCB) | 7/21/2000 | | 8/10/2000 | | |
Jason Blais
|
|
|
REASSIGNED TO CARL WESTFALL.
|
Routing - PUBLIC WORKS | 7/21/2000 | | 7/25/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION REQUIRED BY BRIAN MURPHY. 7/25/00 DAR
|
Routing - PLANNING | 7/25/2000 | | 7/25/2000 | | PASS |
|
|
|
|
Pending Assignment by MYS | 7/21/2000 | | 7/21/2000 | | DONE |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2000 | | DONE |
|
|
|
MARLENE, I SPOKE WITH DONNA AT CORNEL'S OFFICE. SHE STATED THIS IS A PERMIT FOR EXTERIOR WORK ONLY. I AM HAVING HER REVAMP HER PROJECT DECRIPTION AND HAVE ASKED HER TO FAX IT TO ME. THANKS, KATHY
|
Received Certificate of Value | | | 7/18/2000 | | DONE |
|
|
|
|
Application received | | | 7/18/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/18/2000 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 11/29/2000 | 11/29/2000 | | | |
|
|
|
received letter from achd/the district will not assess an impact fee for this project since it is a remodel of an existing t office use/mls
|
Routing Off Site - STRUCTURAL | 7/24/2000 | | | | |
|
|
|
contacted pdq to take plans to outside eng. kmm
|