Permanent occupancy | | | 4/19/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8639 issued 4-19-01 to ESI for ofc. addn.
|
Permanent Occupancy | | 4/13/2001 | 4/13/2001 | | DONE |
|
|
|
|
BLD-Final | 4/13/2001 | 4/13/2001 | 4/13/2001 | | PASS |
|
|
|
Final - ok for perm. occ.
|
Code Occupancy Approval | | | 4/11/2001 | | PASS |
|
|
|
Meets compliance with DRH00-00180 - Signed final did bond release.
|
Fee Review-notes | 7/21/2000 | 7/21/2000 | 3/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2001 | | DONE |
|
|
|
Talked w/Shelby re: status of temp. occ. cert.
|
Temporary occupancy | | | 1/16/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4505 issued 1-16-01 to Engineered Structures.
|
BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 14:50:18. Contact: ###-####.ok subject to hchd and zoning. 1/8/2001 11:18:37 AM
|
FIRE-Final Inspection | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for cetificate of occupancy 1/8/2001 1:15:56 PM
|
Code Occupancy Approval | | | 1/8/2001 | | FAIL |
|
|
|
Need to bond for 1approx. 12 shrubs, perma bark and some sprinkler heads. To bering in CC for $385.00 to bond for temporary.
|
FIRE-Final Inspection | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail Constr not complete 1/5/2001 8:22:56 AM
|
BLD-Final | 1/3/2001 | 1/4/2001 | 1/4/2001 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 15:10:11. Contact: ###-####.
|
FIRE-Final Inspection | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | FAIL |
Joe Tawney
|
|
|
###-####. Spklr final Fail Air pressure switch 1/4/2001 1:21:36 PM
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 08:53:39. Contact: ###-####. 12/22/2000 9:03:33 AM grid ok 12/22/2000 9:26:15 AM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 12:37:54. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 11/29/2000 3:45:07 PM ok to rock special inspections completed for welding bolting,and concrete.
|
BLD-Framing/Rough-in | 11/22/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 12:00:40. Contact: ###-####.ok pending s-i reports welding ,concrete,also verification of fireretardant wood in walls for backing plywood. 11/28/2000 8:57:19 AM
|
CHANGE STATUS TO (ISS) | | | 11/21/2000 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Dave Hannah
|
|
|
FR RUTH ###-#### crew not ready still working on framing elec mec check and make sure they have special inspection reports on welding and other items 11/17/2000 4:15:33 PM
|
Receive PAYMENT IN FULL | | | 11/3/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/3/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/13/2000 | | 11/2/2000 | | PASS |
Mike Otto
|
|
|
11/2/2000 15:37:51 MLO - activity updated through activity BLDA022 from case BLD00-02128.
|
Routing - PLAN CHECK | 11/1/2000 | | 11/2/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/31/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A-1.1 AND ONE COPY OF LETTER OF CORRECTIONS. ROUTED TO MIKE OTTO. KMM
|
Routing - PLAN CHECK | 10/25/2000 | | 10/27/2000 | | FAIL |
|
|
|
PLAN MODIFICATION
|
Routing - FIRE | 10/20/2000 | | 10/25/2000 | | PASS |
|
|
|
PLAN MODIFICATION-No change to original review of 9/20/00.
|
Routing - PLANNING | 10/13/2000 | | 10/17/2000 | | PASS |
|
|
|
Approved per DRH00-180.
|
Routing - PUBLIC WORKS | 10/13/2000 | | 10/13/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
CHANGE STATUS TO (PND) | | | 10/13/2000 | | DONE |
|
|
|
due to Modification
|
Plans ACCEPTED BY PLAN TECH | | | 10/13/2000 | | DONE |
|
|
|
PLAN MODIFICATION
|
BLD-Foundation | 9/27/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 13:58:56. Contact: ###-####. ft ok profit meeting 9/29/2000 12:16:30 PM
|
Plan resubmittals received | | | 9/28/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS CS1, D1, A1, A5, A5.1, A5.2, A5.5, A7 CD1, E1.1, D1.3, E2.1, E2.4, E3.1, E3.2, EM1, FA1, M1, M2, M3, M4, M5, P1, P2, SPECIFICATIONS. TWO COPIES OF CHANGE DIRECTIVE NO. SEVEN. ROUTED TO CARL DEPENDAHL. KMM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2000 | | DONE |
|
|
|
george ###-####
|
Inspection Record Card- Bld | | | 9/26/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/24/2000 | | 9/26/2000 | | PASS |
Mike Otto
|
|
|
9/26/2000 08:56:05 MLO - activity updated through activity BLDA022 from case BLD00-02128.
|
Routing - FIRE | 9/14/2000 | 9/19/2000 | 9/20/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 9/20/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/11/2000 | | 9/14/2000 | | PASS |
|
|
|
|
Routing - PLUMBING | 9/8/2000 | | 9/11/2000 | | PASS |
|
|
|
no plumbing associated with this project
|
Routing - PLANNING | 9/7/2000 | | 9/8/2000 | | PASS |
|
|
|
Approved per DRH00-180.
|
Routing - PUBLIC WORKS | 9/1/2000 | | 9/7/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/1/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2000 | | DONE |
|
|
|
ROUTED COUNTY PLANS AND ADDITIONAL OUTSIDE ENG. COPY TO MIKE OTTO. KMM
|
Plan Reviewer's activity | | | 7/25/2000 | | HOLD |
|
|
|
DESIGN REVIEW REQUIRED PRIOR TO BEGINNING ROUTING. THIS PLAN WAS SUBMITTED WITHOUT DESIGN REVIEW APPROVAL. 3RD SET OF PLANS TO SEND OUT TO OUTSIDE ENGINEERING. ARCHITECT NOTIFIED. ON HOLD AT PLAN TECHNICIAN DESK.
|
Telephone call | | | 7/25/2000 | | DONE |
|
|
|
CALLED GEORGE BLECHA AND ADVISED HIM HE WOULD NEED A DESIGN REVIEW, A THIRD SET OF PLANS TO SEND TO CONSULTING ENGINEERS AND CACULATIONS FOR DRAINAGE FOR THE ADDED PARKING. ADVISED GEORGE THAT PLANS WERE ON HOLD. 7/25/00 DAR
|
Received Certificate of Value | | | 7/24/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/24/2000 | | DONE |
|
|
|
|
Application received | | | 7/21/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|