To construct a 3,400 sq.ft., one story, type II-N, office infill addition between a 9,600 sq.ft. warehouse (w/2,204 sq.ft. mezzanine) and 13,582 sq.ft. office building per approved plans on file. Original buildings were constructed in Ada County and annexed into the city. This building is located in an AE floodzone. Elevation certificate is on file in the Building Dept. with the top of floor elevation at 2668.6 ft.
NOTE: This building fully fire sprinklered for area increase. (P.C.#583-00)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  4/19/2001 DONE
Perm. Occ. Cert. #8639 issued 4-19-01 to ESI for ofc. addn.
Permanent Occupancy 4/13/20014/13/2001 DONE
Details
BLD-Final4/13/20014/13/20014/13/2001 PASS
Final - ok for perm. occ.
Code Occupancy Approval  4/11/2001 PASS
Meets compliance with DRH00-00180 - Signed final did bond release.
Fee Review-notes7/21/20007/21/20003/19/2001 DONE
Telephone call  3/8/2001 DONE
Talked w/Shelby re: status of temp. occ. cert.
Temporary occupancy  1/16/2001 PART
Temp. Occ. Cert. #4505 issued 1-16-01 to Engineered Structures.
BLD-Final1/5/20011/8/20011/8/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/05/2001 at 14:50:18. Contact: ###-####.ok subject to hchd and zoning. 1/8/2001 11:18:37 AM
FIRE-Final Inspection1/8/20011/8/20011/8/2001PPASS
DetailsJoe Tawney
###-####. Reinsp OK for cetificate of occupancy 1/8/2001 1:15:56 PM
Code Occupancy Approval  1/8/2001 FAIL
Need to bond for 1approx. 12 shrubs, perma bark and some sprinkler heads. To bering in CC for $385.00 to bond for temporary.
FIRE-Final Inspection1/4/20011/5/20011/5/2001AFAIL
DetailsJoe Tawney
###-####. Final Fail Constr not complete 1/5/2001 8:22:56 AM
BLD-Final1/3/20011/4/20011/4/2001PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/03/2001 at 15:10:11. Contact: ###-####.
FIRE-Final Inspection1/4/20011/4/20011/4/2001PFAIL
DetailsJoe Tawney
###-####. Spklr final Fail Air pressure switch 1/4/2001 1:21:36 PM
BLD-Final12/21/200012/22/200012/22/2000ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/21/2000 at 08:53:39. Contact: ###-####. 12/22/2000 9:03:33 AM grid ok 12/22/2000 9:26:15 AM
BLD-Framing/Rough-in11/28/200011/29/200011/29/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/28/2000 at 12:37:54. Contact: ###-####.
BLD-Framing/Rough-in11/29/200011/29/200011/29/2000PPASS
DetailsRuss Owen
Added by Inspector: 407 On 11/29/2000 3:45:07 PM ok to rock special inspections completed for welding bolting,and concrete.
BLD-Framing/Rough-in11/22/200011/27/200011/27/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/22/2000 at 12:00:40. Contact: ###-####.ok pending s-i reports welding ,concrete,also verification of fireretardant wood in walls for backing plywood. 11/28/2000 8:57:19 AM
CHANGE STATUS TO (ISS)  11/21/2000 DONE
BLD-Framing/Rough-in11/17/200011/17/200011/17/2000PFAIL
DetailsDave Hannah
FR RUTH ###-#### crew not ready still working on framing elec mec check and make sure they have special inspection reports on welding and other items 11/17/2000 4:15:33 PM
Receive PAYMENT IN FULL  11/3/2000 DONE
(F) Reprint permit  11/3/2000 DONE
Plan assigned to (MLO)10/13/2000 11/2/2000 PASS
DetailsMike Otto
11/2/2000 15:37:51 MLO - activity updated through activity BLDA022 from case BLD00-02128.
Routing - PLAN CHECK11/1/2000 11/2/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/2/2000 DONE
Plan resubmittals received  10/31/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A-1.1 AND ONE COPY OF LETTER OF CORRECTIONS. ROUTED TO MIKE OTTO. KMM
Routing - PLAN CHECK10/25/2000 10/27/2000 FAIL
PLAN MODIFICATION
Routing - FIRE10/20/2000 10/25/2000 PASS
PLAN MODIFICATION-No change to original review of 9/20/00.
Routing - PLANNING10/13/2000 10/17/2000 PASS
Approved per DRH00-180.
Routing - PUBLIC WORKS10/13/2000 10/13/2000 PASS
PLAN MODIFICATION
CHANGE STATUS TO (PND)  10/13/2000 DONE
due to Modification
Plans ACCEPTED BY PLAN TECH  10/13/2000 DONE
PLAN MODIFICATION
BLD-Foundation9/27/20009/29/20009/29/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/27/2000 at 13:58:56. Contact: ###-####. ft ok profit meeting 9/29/2000 12:16:30 PM
Plan resubmittals received  9/28/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS CS1, D1, A1, A5, A5.1, A5.2, A5.5, A7 CD1, E1.1, D1.3, E2.1, E2.4, E3.1, E3.2, EM1, FA1, M1, M2, M3, M4, M5, P1, P2, SPECIFICATIONS. TWO COPIES OF CHANGE DIRECTIVE NO. SEVEN. ROUTED TO CARL DEPENDAHL. KMM
PLANS/APPL TAKEN TO FRONT DESK  9/26/2000 DONE
Telephone call  9/26/2000 DONE
george ###-####
Inspection Record Card- Bld  9/26/2000 DONE
Print Occupancy Form  9/26/2000 DONE
Issue PAID IN FULL permit  9/26/2000 DONE
Plan assigned to (MLO)7/24/2000 9/26/2000 PASS
DetailsMike Otto
9/26/2000 08:56:05 MLO - activity updated through activity BLDA022 from case BLD00-02128.
Routing - FIRE9/14/20009/19/20009/20/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  9/20/2000 PASS
Routing - PLAN CHECK9/11/2000 9/14/2000 PASS
Routing - PLUMBING9/8/2000 9/11/2000 PASS
no plumbing associated with this project
Routing - PLANNING9/7/2000 9/8/2000 PASS
Approved per DRH00-180.
Routing - PUBLIC WORKS9/1/2000 9/7/2000 PASS
Plan routing begun/NEW & ADDTN  9/1/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/1/2000 DONE
ROUTED COUNTY PLANS AND ADDITIONAL OUTSIDE ENG. COPY TO MIKE OTTO. KMM
Plan Reviewer's activity  7/25/2000 HOLD
DESIGN REVIEW REQUIRED PRIOR TO BEGINNING ROUTING. THIS PLAN WAS SUBMITTED WITHOUT DESIGN REVIEW APPROVAL. 3RD SET OF PLANS TO SEND OUT TO OUTSIDE ENGINEERING. ARCHITECT NOTIFIED. ON HOLD AT PLAN TECHNICIAN DESK.
Telephone call  7/25/2000 DONE
CALLED GEORGE BLECHA AND ADVISED HIM HE WOULD NEED A DESIGN REVIEW, A THIRD SET OF PLANS TO SEND TO CONSULTING ENGINEERS AND CACULATIONS FOR DRAINAGE FOR THE ADDED PARKING. ADVISED GEORGE THAT PLANS WERE ON HOLD. 7/25/00 DAR
Received Certificate of Value  7/24/2000 DONE
Plans ACCEPTED BY PLAN TECH  7/24/2000 DONE
Application received  7/21/2000  
Recd Pcfee & Taken To Pln CK     