Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02175
StatusFinaled
Name IDANHA PUB AND GRILL
Site Address 928 W MAIN ST
Project NameIDANHA
Customer Number 
ePlanReviewNo
Description
(IDANHA PUB & GRILL) This building is fire sprinklered, under the provisions of the 1994 UCBC, to allow it to be 10 feet and 2 stories too tall AND to be over area. To construct a bar (1,450 square feet) and a wine bar (500 square feet) on the first floor (Southwest corner) of the Idanha Building. Work is to include interior non-bearing walls, interior windows, interior doors, exterior doors, a new structural header, and millwork all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. The maximum allowable occupant load of "Bar 108" (87) shall be posted near the main exit. PC-625-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/9/2013 DONE
Case Summary (BLD)  4/27/2005  
Case Summary (BLD)  4/25/2005 DONE
Case Summary (BLD)  4/25/2005  
Case Summary (BLD)  4/25/2005  
Fee Review-notes9/23/20029/23/200212/6/2002 DONE
Permanent Occupancy 2/25/20022/25/2002 DONE
Details
BLD-Final2/25/20022/25/20022/25/2002PPASS
DetailsCarl Dependahl
Cathy has the card; struct ok for c/o 2/25/2002 4:21:30 PM
BLD-Conference2/25/20022/25/20022/25/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/25/2002 4:19:26 PM w/ 409 re final...fire ok
Permanent occupancy UNPAID FEE  2/25/2002 DONE
Perm. Occ. Cert. #9045 issued 2-25-02 to the Idanha Pub and Grill.
FIRE-Alarm Testing2/5/20022/6/20022/7/2002ACANC
DetailsRick Jackson
###-#### BRETT per Dave Miller - not to sign for perm occupancy pending resolution of kitchen exhaust system 2/7/2002 3:55:43 PM
FIRE-Final Inspection2/4/20022/5/20022/5/2002ANR
DetailsRick Jackson
fn fire christina ###-#### will reschedule for 2/6 2/5/2002 3:31:27 PM
BLD-Final2/4/20022/5/20022/5/2002PNR
DetailsCarl Dependahl
christina-- ###-#### fn occ
BLD-Conference1/28/20021/28/20021/28/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/28/2002 9:46:30 AM w/GS re Schott's...south exit has had panic hdwe. installed
BLD-Final12/17/200112/18/200112/18/2001ANR
DetailsCarl Dependahl
BRET ###-####
BLD-Final12/18/200112/18/200112/18/2001PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/18/2001 11:44:00 AM ###-#### Brett...recall 12/18/2001 12:11:39 PM
BLD-Final12/18/200112/18/200112/18/2001PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/18/2001 2:37:55 PM ###-#### bret...need remove add'l latch at exit 12/18/2001 4:42:32 PM
BLD-Final11/29/200111/29/200111/29/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 11/29/2001 2:15:38 PM 2nd c/n re south exit doors, resolve grease duct issues; Notice & Order issued to complete c/n items or vacate (total 30 days)
BLD-Conference10/19/200110/19/200110/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/19/2001 2:27:01 PM w GS...need make corrections at exit door asap
BLD-Conference10/16/200110/16/200110/16/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/16/2001 2:01:33 PM w/ Brett re prior c/n
BLD-Conference10/9/200110/9/200110/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/9/2001 8:43:48 AM w/ GS re meeting w/ Ken Howell & Dave Miller...chimney/grease duct to be evaluated by Creighton Eng'g...keep c/n
BLD-Conference9/25/20019/25/20019/25/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/25/2001 4:52:41 PM re: Complaints of removal of exit & some exterior illumination; exit light must be provided, exterior is subject to "P&Z" or Historic review.
BLD-Conference8/28/20018/28/20018/28/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/28/2001 8:31:18 AM w/ Dave M & GS, re schotts grease duct
BLD-Conference8/20/20018/21/20018/21/2001APART
DetailsCarl Dependahl
As per our phone call; W/ GS, need Fire Dept. clarification re grease duct. Keep c/n re exit door. 8/22/2001 10:09:28 AM
BLD-Conference8/17/20018/17/20018/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/17/2001 10:31:33 AM w/Christina re exit door, keep c/n.
BLD-Conference8/16/20018/16/20018/16/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/16/2001 8:08:17 AM w/ P Schott re c/n, UBC 1007.2.5 & 1003.3.1.1 re exit doors
BLD-Final8/14/20018/15/20018/15/2001PFAIL
DetailsCarl Dependahl
FN OCC KRISTINA- ###-#### c/n re exit door; partial insp only, need resolve kitchen exhaust issues w BFD, obtain all other perm ok's. 8/15/2001 1:17:24 PM
BLD-Framing/Rough-in8/1/20018/3/20018/3/2001ANR
DetailsCarl Dependahl
unable to contact; keep c/n (to meet w/ door hdwe sales at site ... called Brett to ask to reset insp 8/8/2001 4:35:41 PM 8/8/2001 4:36:34 PM
Telephone call  7/23/2001 DONE
Talked to Brett (contractor) re: status of temp. occ.
BLD-Conference7/11/20017/11/20017/11/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 7/11/2001 11:05:25 AM w/ Brett re south exit mod. install permanent door stop so doors don't conflict
BLD-Conference6/11/20016/11/20016/11/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/11/2001 2:18:03 PM w/ Sam Rogers...req'd exit should be ok if doorstop made permanent or appropriate method of blocking or coordinating door swing at "conflicting" doors to exterior
BLD-Final6/11/20016/11/20016/11/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 6/11/2001 4:25:41 PM Per UBC 1007 .2.5. install panic or "3-point" latch,(or approved equal) c/n issued to Peter Schott; also need permanent door stop from bsmt/banquet rm. exit
Fee Review-notes7/27/20007/27/20005/30/2001 DONE
BLD-Final5/22/20015/23/20015/23/2001APART
DetailsJim Storey
Brett ###-#### panic hard ware back ordered for lobby exit to be maintaned/ handrail in 108 temp to be rechecked on perm instaltion. occ load signs temp to be check at perm occ. 5/23/2001 10:03:03 AM
FIRE-Final Inspection5/23/20015/23/20015/23/2001PFAIL
DetailsRick Jackson
Brett ###-#### still on TCO. gas valve operated properly for kitchen hood system; door hardware still not compliant for bar area; exit signs need repair in banquest room; extinguishers need to hung and current inspection tag 5/23/2001 2:23:24 PM
Temporary occupancy  5/23/2001 PART
Temp. Occ. Cert. #4547 issued 5-23-01 to the Idanha Pub and Grill.
FIRE-Final Inspection5/22/20015/22/20015/22/2001PPART
DetailsRick Jackson
###-#### Brett per agreement with Dave Miller and owner the kitchen system to be reviewed by engineer; okay to occupy bar 5/23/2001 9:12:15 AM
BLD-Final5/22/20015/22/20015/22/2001PFAIL
DetailsJim Storey
###-#### handrail and occ signage/ panic hardware to lobby pending fire sign off. 5/22/2001 4:14:08 PM
FIRE-Final Inspection5/21/20015/21/20015/21/2001PNR
DetailsRick Jackson
Brett ###-####
BLD-Final5/21/20015/21/20015/21/2001PNR
DetailsCarl Dependahl
###-#### Brett
Plan resubmittals received  5/2/2001 DONE
Received three copies of revsied sheets P2.1 One cover letter to Dave Lightfoot, One cover letter with adendum to Carl D. Routed plans and letter to David L. and one letter to Carl D. with adendum. KMM
BLD-Framing/Rough-in4/17/20014/18/20014/18/2001ACANC
DetailsJim Storey
cover for kitchen Ron ###-####
BLD-Conference4/17/20014/17/20014/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/17/2001 5:47:05 PM w/ bldr, owner (Schotts), hvac installer, etc.re kitchen finals
BLD-Conference4/9/20014/9/20014/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/9/2001 1:54:25 PM w/ contractor re c/n...& w/ Rick J. & GS re range grease duct/shaft...not part of project???
BLD-Conference4/3/20014/3/20014/3/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/3/2001 9:33:58 AM w/ Cary of A-1 lock...need approved plans for determination of hdwe...have plans onsite.
BLD-Framing/Rough-in3/29/20013/29/20013/29/2001PPART
DetailsTom Arcoraci
1st floor ###-#### wip ok to cover lid in office behind elevator 3/29/2001 2:25:47 PM
BLD-Conference3/20/20013/20/20013/20/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/20/2001 10:02:27 AM w/ bldr re firestops at lids
BLD-Framing/Rough-in3/15/20013/16/20013/16/2001APART
DetailsCarl Dependahl
1st floor ###-####; restaurant area lid ok, wine bar area lid only ok 3/16/2001 10:45:49 AM
BLD-Framing/Rough-in3/6/20013/7/20013/7/2001APART
DetailsCarl Dependahl
###-#### ok to cover main bar area only 3/7/2001 4:28:33 PM
BLD-Framing/Rough-in3/6/20013/6/20013/6/2001PPART
DetailsCarl Dependahl
###-####; walls ok 3/6/2001 2:48:06 PM
BLD-Conference12/13/200012/14/200012/14/2000AFAIL
DetailsCarl Dependahl
c/n issued for PROFIT meeting 12/14/2000 2:42:45 PM
Issue PAID IN FULL permit  9/13/2000 DONE
Print Occupancy Form  9/11/2000 DONE
Telephone call  9/11/2000 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PLUMBING9/6/2000 9/11/2000 PASS
hot and cold water connections may be required to be extended to mains, verify with field inspector
Routing - PLAN CHECK9/11/2000 9/11/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/11/2000 PASS
Plan assigned to (CJW)8/11/2000 9/11/2000 PASS
DetailsCarl Westfall
9/11/00 11:03:44 CJW - activity updated through activity BLDA022 from case BLD00-02175.
Routing - PLAN CHECK8/29/2000 9/6/2000 PASS
Resubmittal review.
Plan Reviewer's activity  9/6/2000 PASS
The drawings were approved, with conditions, after resubmittal review.
Routing - FIRE8/22/20008/23/20008/29/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/29/2000  
Failed in plumbing and plan review.
Routing - PLAN CHECK8/15/2000 8/22/2000  
Drawings failed first review.
Plan resubmittals received  8/21/2000 DONE
RECEIVED REVISED SHEETS P1.0, P2.0, P2.1. ROUTED TO CARL .
Plan Reviewer's activity  8/21/2000  
UBC plan review started August 21, 2000 and finished the next day. A response is required from the architect. See the conditions list.
Routing - PLUMBING8/14/2000 8/15/2000  
First review failed. Additional cross connection may be required, vents required downstream of all traps, provide a plan showing the size, location, and loading for the connections to existing waste and water systems.
Routing - PUBLIC WORKS8/11/2000 8/14/2000 PASS
Pending Assignment by MYS7/27/2000 8/11/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  8/11/2000 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  8/8/2000 DONE
Application received  7/27/2000  
Plans ACCEPTED BY PLAN TECH  7/27/2000  
JOHN PRICE HAD TO TAKE PLANS TO CDH TO GET SIGNED OFF. KMM
Plan resubmittals received     
RESPONSE LETTER. REVISED SHEETS A.2.1 A3.0
Inspection Record Card- Bld