Fee Review-notes | 2/27/2001 | 2/27/2001 | 9/17/2001 | | DONE |
|
|
|
|
Fee Review-notes | 8/1/2000 | 8/1/2000 | 9/17/2001 | | DONE |
|
|
|
|
BLD-Final | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 10:10:10. Contact: ###-####. talk with robert myer with health dept said I could sign for him for perm/ final ok bld. for occ. 7/23/2001 9:21:36 AM
|
Permanent Occupancy | | 7/23/2001 | 7/23/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/23/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8771 issued 7-23-01 to "The Church in Boise."
|
BLD-Final | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 14:13:56. Contact: ###-####. need per occ from dist health fire caulk mec rooms uni sex sign cry room 7/6/2001 11:07:05 AM
|
FIRE-Final Inspection | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 08:00:25. Contact: ###-####.
|
Code Occupancy Approval | | | 7/5/2001 | | PASS |
|
|
|
Inspected and passed. It was noted that the City of Boise Forester had modified the locations and removal of diseased/dying trees. Of note, is the removal of a tree in the northeast corner of the lot, as it was in the 40' triangle of the corner.
|
FIRE-Final Inspection | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 09:26:42. Contact: ###-####. occupant load sign adn bollards for gas meter 7/3/2001 1:48:01 PM
|
FIRE-Conference | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 09:47:13. Contact: ###-####. reviewed exit signage; extinguishers and occupant load signs 6/20/2001 7:55:15 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 11:14:17. Contact: ###-####. suspended ceiling grid ok to cover 6/1/2001 11:24:27 AM
|
Case Summary (BLD) | | | 5/18/2001 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/19/2001 | 4/20/2001 | 4/20/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 16:08:24. Contact: ###-####. c/n items completed ok to cover 4/20/2001 10:53:47 AM
|
BLD-Framing/Rough-in | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 09:07:30. Contact: ###-####.c/n posted 4/23/2001 9:15:27 AM
|
Plan resubmittals received | | | 4/18/2001 | | DONE |
|
|
|
Received one copy of revised M1.0, M1.1, P1.0 and P1.1. Routed to David Lightfoot. KMM
|
BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 16:05:26. Contact: ###-####. Mechanical, electrical and plumbing sign off needed. 4/13/2001 1:48:51 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 13:17:25. Contact: ###-####. erterior sheer ok. 3/30/2001 3:08:16 PM
|
BLD-Foundation | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:07:32. Contact: ###-####. wall 2/22/2001 2:49:02 PM
|
BLD-Footing | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 08:18:23. Contact: ###-####.
|
(F) Reprint permit | | | 12/14/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/7/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2000 | | DONE |
|
|
|
called permit ready fees due and ACHD
|
Plan assigned to (MLO) | 8/1/2000 | | 11/27/2000 | | PASS |
Mike Otto
|
|
|
11/27/2000 14:24:28 MLO - activity updated through activity BLDA022 from case BLD00-02219.
|
Routing - PLUMBING | 11/22/2000 | | 11/27/2000 | | PASS |
|
|
|
ROUTE TO PLUMBING WHEN RESUBMITTALS RECEIVED THAT INLCLUDE PLUMBING PLANS FOR ROOF DRAINS AND ADDED MOP SINK. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/22/2000 | | DONE |
|
|
|
Received two copies of revised sheets A1.1, A4.2 AND P1.1 dated 11/1/00 . Two copies of revised sheets A1.1, A1.2, A4.2, A7.1 P1.1 dated 11/21/00 ROUTED TO MIKE O. KMM
|
Routing - PLAN CHECK | 11/22/2000 | | 11/22/2000 | | PASS |
|
|
|
|
Routing - FIRE | 11/16/2000 | 11/16/2000 | 11/16/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 11/13/2000 | 11/14/2000 | 11/14/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant flows. 3rd request? plans returned to plan review
|
Routing Off Site - STRUCTURAL | 11/8/2000 | | 11/13/2000 | | PASS |
|
|
|
Sent one set of plans to consultanting engineer via PDQ. 11/8/00 DAR
|
Routing - PLAN CHECK | 11/8/2000 | | 11/13/2000 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT.
|
Plan resubmittals requested | | | 11/13/2000 | | FAIL |
|
|
|
UBC CORRECTIONS.
|
Routing - PUBLIC WORKS | 11/13/2000 | | 11/13/2000 | | PASS |
|
|
|
have added additional fixture (mop sink)
|
Routing - FIRE | 11/6/2000 | 11/8/2000 | 11/8/2000 | | FAIL |
Bill Alexander
|
|
|
Lack Fire Flows on hydrant located. Called and requested submittal
|
Plan resubmittals received | | | 11/7/2000 | | DONE |
|
|
|
Received plan resubmittals from Design Resources, two sets of sheets A1.1, A3.1, A4.2, A7.1, S2.2, forwarded same to Mike Otto. 1/7/00 DAR
|
Routing - PLAN CHECK | 10/30/2000 | | 11/6/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Plan resubmittals requested | | | 11/6/2000 | | FAIL |
|
|
|
UBC CORRECTIONS AND SHORT STRUCTURAL SET FOR REVIEWING ENGINEER. MLO
|
Plan resubmittals received | | | 10/27/2000 | | DONE |
|
|
|
RECEIVED THW COPIES OF REVISED PLANS AND TWO COPIES OF REVISED CALCULATIONS FROM ROCKY TOWLE. ROUTED TO MIKE O. KMM
|
Routing - FIRE | 8/23/2000 | 8/28/2000 | 8/29/2000 | | FAIL |
Bill Alexander
|
|
|
|
Routing Off Site - STRUCTURAL | 8/11/2000 | | 8/29/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/29/2000 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS FAXED TO ARCHITECT.
|
Plan Review Completed(1st rev) | | | 8/29/2000 | | FAIL |
|
|
|
plans returned to plan check
|
Routing - PLAN CHECK | 8/15/2000 | | 8/23/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Plan resubmittals requested | | | 8/23/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - PLUMBING | 8/14/2000 | | 8/15/2000 | | FAIL |
|
|
|
turn down
|
Routing - PLANNING | 8/11/2000 | | 8/14/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2000 | | 8/11/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/8/2000 | | PEND |
|
|
|
RECEIVED ONE ADDITIONAL SET OF PRINTS FOR OUTSIDE ENG. HOWEVER THEY WERE NOT STAMPED OR SIGNED. CALLED ROCKY OF THIS NEED
RECEIVED TWO ADITIONAL COPIES OF SHEETS M1.0 AND M3.0 ( SHEET M1.0 IS A MODIFIED SHEET). ONE SHEET OF C1.2 ONE VICINITY MAP AND ONE DEED OR LEGAL DESCRIPTION. PUT WITH PLANS.
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2000 | | HOLD |
|
|
|
REQUIRES: 1. OUTSIDE ENG. COPY.
2. M3 SHEET NOT SIGNED
3. THREE ADDITIONAL CIVIL SETS. RECEIVED 8/1/00
4. COMPLETE LEGAL DESCRIPTION
5. VICINITY MAP
6. FIRE SPRINKLER, FIRE ALARM AND SMOKE SYSTEMS PART OF DESIGN?
FAXED AND LEFT MESAGES FOR ROCKY. KMM
|
Received Certificate of Value | | | 8/1/2000 | | DONE |
|
|
|
|
Application received | | | 8/1/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2000 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 12/7/2000 | 12/7/2000 | | | |
|
|
|
received a.c.h.d- # 01-00160 for $2,713/mls
|
Plan routing begun/NEW & ADDTN | | | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | | | | | |
|
|
|
|