Permit NumberBLD00-02229
StatusFinaled
Name CITY OF BOI SE
Site Address 1025 S CAPITOL BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel & refurbish within the existing 1021 sq.ft. kitchen area per approved plans on file (food preparation area for adjoining dining area of 630 s.f. - Occupant Load - 42) . Work to include replacement of fire suppression system in range hood, repair existing range hood venting & install within new 1-hour shaft, replacement of exterior windows on the north wall, plumbing and miscellaneous repairs. NOTE: This building is fully sprinkled as substitution of 1-hour F.R. construction per records. BASEMENT IS SPRINKLED AND APPROVED FOR MECHANICAL SERVICE USE TO TENANT SPACE ONLY - HAS 1-EXIT - NO STORAGE OR OTHER USE OF BASEMENT ALLOWED UNDER THIS PERMIT. ALL ADJOING SPACE TO WEST & SOUTH ARE VACANT. (P.C.#648-00)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/27/20036/27/20036/27/2003 DONE
Additional values from subcontractors.
Fee Review-notes8/1/20008/1/20004/18/2001 DONE
pd by JV
Permanent Occupancy 10/24/200010/24/2000 DONE
Details
BLD-Final10/23/200010/24/200010/24/2000APASS
DetailsRuss Owen
fn- jessie ###-####
Print Occupancy Form  10/24/2000 DONE
Permanent occupancy  10/24/2000 DONE
Perm. Occ. Cert. #8442 issued 10-24-00 to the Boulevard Cafe.
FIRE-Final Inspection10/16/200010/17/200010/17/2000PPASS
DetailsRick Jackson
JESSIE-- ###-#### FIRE FN area under this permit okay; building not fully sprinklered as indicated on permit - will talk to Dan Stuart about this 10/18/2000 10:02:47 AM
BLD-Final10/16/200010/17/200010/17/2000PFAIL
DetailsJim Storey
JESSIE ###-#### FN OCC need occ card need exit door hardware/ door in hall. 10/17/2000 4:53:50 PM
FIRE-Final Inspection9/29/20009/29/200010/2/2000PFAIL
DetailsRick Jackson
trip test\\###-####\\call first to meet with Jessie cell ###-#### need filters; complete exhaust system with balance test results; tape on sprinkler head by basement stair; tag extinguishers; tested extinguishing system - pass; 10/2/2000 10:10:13 AM
Print Occupancy Form  8/22/2000 DONE
Inspection Record Card- Bld  8/22/2000 DONE
Issue & PRINT permit  8/22/2000 DONE
Routing - FIRE8/21/20008/21/20008/21/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/21/2000 PASS
Routing - PLAN CHECK8/21/2000 8/21/2000 PASS
TOOK TO DAN STUART. To permit desk for issuance. Approved as noted and attached.
PLANS/APPL TAKEN TO FRONT DESK  8/21/2000 PASS
To permit desk for issuance.
Plan assigned to (DRS)8/15/2000 8/21/2000 PASS
DetailsDan Stuart
8/21/2000 17:14:46 DRS - activity updated through activity BLDA022 from case BLD00-02229.
Routing - PLAN CHECK8/18/2000 8/21/2000 PEND
NO RESPONSE TO PLAN REVIEW COMMENTS REQUIRED. ROUTING TO FIRE CODE ANALYST FOR REVIEW.
Routing - PUBLIC WORKS8/15/2000 8/18/2000 PASS
Routing - PLUMBING8/18/2000 8/18/2000 PASS
provide an indirect waste receptor for ice bin drain, no indirect waste receptor will be allowed to be inclosed within a cabinet or not in full view, all waste and vent and water piping must be installed per 97 upc and all state and local codes
Plan routing begun/TENANTS  8/15/2000 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Plan had to be routed to Central District Health after application was received.
Plans ACCEPTED BY PLAN TECH  8/14/2000 DONE
CLIENT HAD TO TAKE PLANS TO CDH BEFORE I COULD ACCEPT. KMM
Routing Off Site - C.D.H8/3/2000 8/10/2000 PASS
Application received  8/1/2000  
Recd Pcfee & Taken To Pln CK  8/1/2000 DONE
taken plans to plan check has not paid any money yet
Received Certificate of Value  8/1/2000 DONE