Permit Information
Permit NumberBLD00-02242
StatusFinaled
Name (VANILLA FINISH SHELL)
Site Address 300 W MAIN ST
Project Name300 MAIN
Customer Number 
ePlanReviewNo
Description
To remodel and add a second floor to an existing building with new core area work and new exiting system for future office tenant spaces (Vanilla Finish). The building has a 12,028 sq. ft. first floor and will have a 6,368 sq. ft. second floor. The building also has a 1,280 sq. ft. basement for storage and for mechanical/electrical use. NO OCCUPANCY is allowed under this permit. Separate permits will be required to occupy the tenant spaces. Work to include demolishing several interior walls, upgrading and constructing new core restrooms meeting current accessibility standards, other accessible upgrades, some minor exterior modifications including some exterior doors- window glass replacement-new windows in previous door openings-CMU infill wall, upgrading exterior and interior stairway handrails to meet code, adding wheel-guard rail at 4" height to existing accessible ramp, constructing a new second floor with supporting beams/columns and new footings, structural fill at existing indoor swimming pool location then providing a new framed floor, new elevator installation and enclosure, two new interior exit stairways from new second floor, new exiting system consisting of a one-hour rated corridor with rated doors, one-hour rated Areas of Refuge, new interior walls with doors, interior finish, new suspended ceiling, alarm system work, new plumbing work, new mechanical work, and new electrical work. THIS IS A SHELL PERMIT ONLY. SCOPE OF WORK PERMIT. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: THIS BUILDING IS NOT FIRE SPRINKLERED. (P.C.#619-00) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/2/20008/2/20002/20/2003 DONE
BLD-Aging Inspection2/3/20032/3/20032/3/2003 DONE
DetailsCarl Dependahl
DOC - Permit Finaled2/3/20032/3/20032/3/2003APASS
DetailsCarl Dependahl
Finaled by inspector at 2/3/2003 7:48:41 AM
FIRE-Final Inspection12/3/200212/4/200212/4/2002APASS
DetailsRick Jackson
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final12/3/200212/4/200212/4/2002ANR
DetailsCarl Dependahl
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final12/4/200212/4/200212/4/2002PPASS
DetailsCarl Dependahl
###-####...permit is superceded by BLD01-02790, final or "void" ok. 12/4/2002 3:01:30 PM
BLD-Final12/2/200212/3/200212/3/2002ANR
DetailsCarl Dependahl
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, need fire, etc. 12/3/2002 10:23:57 AM
BLD-Conference11/26/200211/27/200211/27/2002ACANC
DetailsCarl Dependahl
Dave ###-####
BLD-Conference11/27/200211/27/200211/27/2002PPASS
DetailsCarl Dependahl
Dave ###-####...struct ok, need fire consultation re storage area exis 11/27/2002 4:16:07 PM
BLD-Final11/25/200211/26/200211/26/2002AFAIL
DetailsCarl Dependahl
DAVE THIS IS FOR OCCUPANCY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final11/22/200211/25/200211/25/2002PNR
DetailsCarl Dependahl
c/n, need consult fire re exiting from "storage" area...prior to final sign off...other struct items ok, rec'd eng's & spec insp reports. 11/26/2002 1:39:02 PM
BLD-Conference11/22/200211/22/200211/22/2002PPASS
DetailsCarl Dependahl
original shell permit, superceded by BLD01-02790...ok to final this as spec insp & eng's final reports are ok. 11/22/02 3:11:49 PM
BLD-Conference11/22/200211/22/200211/22/2002PCANC
DetailsCarl Dependahl
BLD-Conference11/22/200211/22/200211/22/2002PPASS
DetailsCarl Dependahl
FIRE-Conference4/15/20024/15/20024/15/2002PPART
DetailsRick Jackson
harold ###-#### for conf met with Harold of Mountain Power; since an elevator is now in the building, an elevator recall control unit will be required per NFPA 72 para 3-9.3.1; he was going to get Dave Maxwell to submit plans 4/15/2002 3:27:10 PM
BLD-Conference3/7/20023/7/20023/7/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/7/2002 3:12:15 PM w/ Jason B & new contractor at site...left c/n list to complete items.
BLD-Other3/5/20023/6/20023/6/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/05/2002 at 13:42:13. Contact: ###-####.... 3/6/2002 2:59:31 PM c/n,draftstops,spec insp reports, etc. ok to issue new permits 3/6/2002 3:16:25 PM
BLD-Conference2/27/20022/27/20022/27/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2002 6:05:09 PM w/ Jason...need final prior to new permits
BLD-Aging Inspection12/18/200112/18/200112/18/2001 NR
DetailsCarl Dependahl
new plan mod per Jason...may be add'l permit 12/18/2001 3:53:25 PM
BLD-Conference10/15/200110/15/200110/15/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/15/2001 11:09:54 AM w/ Jason B. re status of permit...keep c/n. Need review of plans for add'l work.
BLD-Conference10/10/200110/10/200110/10/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 10/10/2001 4:54:02 PM c/n, submit plans for ext work (in progress) "stop work"
BLD-Conference10/8/200110/8/200110/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/8/2001 10:44:10 AM w/ Jason B re plan modification ( again!)...new arch on job...they want to void this permit but must be finalled.
BLD-Aging Inspection9/26/20019/26/20019/26/2001 PART
DetailsCarl Dependahl
Wip...plan modified, ok. 9/26/2001 8:29:26 AM
BLD-Framing/Rough-in7/26/20017/27/20017/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2001 at 09:03:05. Contact: ###-####. east ceilling 2nd floor ok for cover only. 7/27/2001 2:57:49 PM
BLD-Conference7/12/20017/12/20017/12/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/12/2001 12:00:46 PM need other finals & arch's letter requesting deletion of work not to be completed for "shell";
BLD-Framing/Rough-in6/7/20016/7/20016/7/2001PPART
DetailsCarl Dependahl
Rick ###-####; shaft & duct enclosure at west stair ok to continue. 2nd fl framing at east portion ok... 6/7/2001 3:05:25 PM
BLD-Framing/Rough-in6/4/20016/4/20016/4/2001PPART
DetailsCarl Dependahl
###-####; ok to cover floor at east...seal floor drains 1st. ok to frame "shafts" for hvac 6/4/2001 3:19:34 PM
BLD-Framing/Rough-in5/21/20015/21/20015/21/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/21/2001 at 09:53:16. Contact: ###-####....floor ok at pool 1st fl area 5/21/2001 5:15:08 PM
Telephone call  5/21/2001 DONE
left mess that permit is ready
Plan assigned to (JCB)4/3/2001 5/18/2001 PASS
DetailsJason Blais
PLAN MODIFICATION. Resubmittal sheets required.
Routing - PLAN CHECK5/9/2001 5/18/2001 PASS
Plan modification approved. Permit and plans taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/18/2001 PASS
Inspection Record Card- Bld  5/18/2001 DONE
Print Occupancy Form  5/18/2001 DONE
Plan resubmittals received  5/11/2001 DONE
Plan Modification resubmittals - Received Sheets G1.0, A1.0, A2.0, A2.1A, A3.0, A4.0, A5.0, A8.0, A8.1, S1.1, S2.1, SA.1, SA.2 along with structural calcs for floor framing over old pool area and new stair framing. Forwarded to Jason B.
Routing - FIRE5/4/2001 5/9/2001 PASS
Plan Modification
Routing - PLAN CHECK3/28/2001 5/4/2001 FAIL
Plan Modification - Plan review report sent and faxed to architect. Numerous items to be addressed. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  5/4/2001  
Plan Modification - Resubmittals and response required for further review.
Plan resubmittals received  4/25/2001 DONE
Received two sets of plan resubmittals from ZGA Architects, Art Albanese. 4/25/01 DAR
BLD-Conference4/24/20014/24/20014/24/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/24/2001 4:04:55 PM w/ bldr onsite, need hvac drawings, etc.
Plan Reviewer's activity  4/19/2001  
Met with architect Art Albanese. Went over numerous changes to the original plan approval. It was decided that (2) whole new sets of plans were to be submitted since there were so many changes. The original approved plans would not be good for future reference so they should be purged from the records dept.
Plan resubmittals received  4/16/2001 DONE
Received plan resubmittals from ZGA Architects two sets of sheet A2.1A. forwarded same to Jason Blais. 4/16/01 DAR
BLD-Footing4/2/20014/2/20014/2/2001PPART
DetailsCarl Dependahl
swimming pool area ###-####; new floor ftgs 4/2/2001 5:22:18 PM
Routing - PLANNING3/27/2001 3/28/2001 PASS
Approved per Building Permit plans.
Routing - PLUMBING3/28/2001 3/28/2001 PASS
Plan Modification
Routing - PUBLIC WORKS3/26/2001 3/27/2001 PASS
Plan Modification
CHANGE STATUS TO (PND)  3/26/2001 DONE
accepted $500.00 for resubmittal and sent to plan review
BLD-Framing/Rough-in3/20/20013/20/20013/20/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/20/2001 at 08:18:33. Contact: ###-####...ok to cover west end corridor 3/20/2001 6:00:36 PM
BLD-Framing/Rough-in3/1/20013/1/20013/1/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/01/2001 at 07:28:02. Contact: ###-####...ok to cover floor at east side pending hvac ok; ok to insulate roof at bowstring truss area, recommend perm rated paint this condition 3/1/2001 4:35:17 PM
BLD-Framing/Rough-in2/22/20012/22/20012/22/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/22/2001 at 09:38:48. Contact: ###-####. c/n : fireblocks,draftstops, hangersn at existing joists. 2/22/2001 12:30:49 PM
BLD-Conference2/13/20012/13/20012/13/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/13/2001 at 09:15:51. Contact: ###-####. has plan mod in for review 2/13/2001 6:09:54 PM
BLD-Framing/Rough-in1/17/20011/17/20011/17/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/17/2001 at 10:52:13. Contact: ###-####. ok to cover int corr. walls/lid; need eng's detail for roof & spans. keep c/n 1/17/2001 1:48:08 PM
BLD-Foundation1/15/20011/16/20011/16/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/15/2001 at 10:12:27. Contact: ###-####. stem wall of elev pit 1/16/2001 10:24:20 AM
BLD-Footing1/3/20011/4/20011/4/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/03/2001 at 09:28:57. Contact: ###-####. elev ftg/slab ok 1/4/2001 11:40:17 AM
BLD-Conference1/4/20011/4/20011/4/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/4/2001 11:42:52 AM c/n issued; need eng's upgrades for existing deficiency at overspan roofframing,( brg walls failing) and modified attachment of new 2nd fl. due to existing condition ( at walls rg floor at perimeter)
BLD-Footing12/20/200012/21/200012/21/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/20/2000 at 13:45:23. Contact: ###-####. int ftgs for new 2nd fl, mti ok'd dowels, ok to pour 12/21/2000 3:24:13 PM
Issue PAID IN FULL permit  10/27/2000 DONE
CHANGE ISSUED DATE  10/27/2000  
Print Occupancy Form  10/9/2000 DONE
Inspection Record Card- Bld  10/9/2000 DONE
Telephone call  10/9/2000 DONE
called permit ready and fees due and need ACHD cert or receipt
Routing - PLAN CHECK10/3/2000 10/6/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/6/2000 DONE
Plan assigned to (JCB)8/10/2000 10/6/2000 PASS
DetailsJason Blais
10/6/2000 17:50:16 MYS - activity updated through activity BLDA022 from case BLD00-02242.
Routing - FIRE9/28/2000 10/3/2000 PASS
10/26/00 Revised review to eleiminate requirement to upgrade existing FA system, per aggreement by Dave Miller to allow the existing system to be removed instead of upgraded.
Routing - PLAN CHECK9/6/2000 9/28/2000 PEND
Plan and permit approval dependent on Fire Dept. approval of plans. Plans routed to Fire Dept. for review.
Application received  9/25/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, ARTHUR ALBANESE, TWO SETS OF G AND A SHEETS PLUS SMALL DOCUMENTS, FORWARDED SAME TO JASON BLAIS . 9/25/00 DAR
Plan Review Completed(1st rev)  9/6/2000 FAIL
failed building and fire reviews
Routing - FIRE9/1/2000 9/6/2000 FAIL
Routing - PLAN CHECK8/18/2000 9/1/2000 FAIL
Plan review report sent and faxed to architect. Numerous items to address. Resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  9/1/2000  
Plan resubmittals and response required for further review.
Routing - PUBLIC WORKS8/16/2000 8/18/2000 PASS
Routing - PLANNING8/10/2000 8/11/2000 PASS
Route to Marty Santoyo.
Routing - PUBLIC WORKS8/11/2000 8/11/2000 FAIL
failed requires street light plan, this project is within the defined historical distric ornamental style street light are required.
Plan routing begun/TENANTS  8/10/2000 DONE
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Pending Assignment by MYS8/10/2000 8/10/2000 DONE
DetailsMarlene Southard
8/10/2000 09:04:42 MYS - activity updated through activity BLDA184 from case BLD00-02242.
Plans ACCEPTED BY PLAN TECH  8/3/2000 DONE
SENT ART ALBANESE A FAX REQUESTING A ARCHITECT/ ENGINEER OF RECORD FORM FOR THIS PROJECT. 8/3/00
Application received  8/2/2000  
Recd Pcfee & Taken To Pln CK  8/2/2000 DONE