Letter of compliance | | | 6/27/2002 | | DONE |
|
|
|
Letter of Compliance #22539 issued 6-27-02.
|
BLD-Final | 6/19/2002 | 6/19/2002 | 6/19/2002 | | DONE |
|
|
|
Final/ok for perm. occ.
|
Fee Review-notes | 8/2/2000 | 8/2/2000 | 10/18/2001 | | DONE |
|
|
|
3/12-left mesg. for julie @ esi
|
Temporary occupancy | | | 10/8/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4610 issued 10-8-01 to the Boise First Church of the Nazarene for the shell bldg.
|
BLD-Final | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PART |
Jim Sly
|
|
|
Jim Martin, ###-#### : ) OK for Temp Occ. 10/5/2001 3:55:49 PM
|
PubWorks Occupancy Approval | | | 10/2/2001 | | DONE |
|
|
|
Signed Permanent Occupancy 10/02/01. R.Rokovitz
|
Code Occupancy Approval | | | 10/2/2001 | | FAIL |
|
|
|
Bonded for remaining landscaping $9,058.50 - Signed temporary
|
BLD-Other | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PART |
Jim Sly
|
|
|
PROFIT Mtg. today @ 1:30 : )
|
BLD-Framing/Rough-in | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | PART |
Jim Sly
|
|
|
per jim s set up for r/i Test to see if permit "un-blocked" 8/16/2001 11:07:44 AM
|
Inspection Record Card- Bld | | | 6/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2001 | | DONE |
|
|
|
TALKED TO MARY TO VERIFY PLANS ARE READY
|
Print Occupancy Form | | | 6/22/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 6/8/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 5/25/2001 | | DONE |
|
|
|
plan modifcation submitted with a $500 check
|
FIRE-Conference | 4/20/2001 | 4/20/2001 | 4/20/2001 | P | PASS |
Joe Tawney
|
|
|
Leroy ###-#### Conf regarding elevated walkways. 4 ft wide or less does not req spklr protection. 4/20/2001 4:03:24 PM
|
BLD-Foundation | 3/30/2001 | 4/3/2001 | 4/3/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 15:22:05. Contact: ###-####. Continuation of slab pours..... 4/3/2001 11:36:31 AM
|
BLD-Foundation | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 15:21:18. Contact: ###-####. M.T.I. on to test concrete for slab on grade 4/2/2001 9:13:57 AM
|
BLD-Foundation | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Alan Hauser
|
|
|
special inspection 3/30/2001 9:08:44 AM
|
BLD-Foundation | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 15:43:40. Contact: ###-####. slab on grade mti tested concrete 3/26/2001 10:05:42 AM
|
BLD-Foundation | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 16:17:15. Contact: ###-####. mti on site to inspect and test 3/15/2001 10:32:58 AM
|
BLD-Foundation | 3/12/2001 | 3/13/2001 | 3/13/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 16:47:41. Contact: ###-####. M.T.I. on site to do spec. inpsc 3/13/2001 12:45:48 PM
|
BLD-Foundation | 3/9/2001 | 3/12/2001 | 3/12/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 16:45:18. Contact: ###-####. Grout pour West wall OK pending special ins and appr. 3/12/2001 11:37:07 AM
|
BLD-Foundation | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 14:28:14. Contact: ###-####. Grout and deck pending special insp and appr. 3/9/2001 11:08:47 AM
|
BLD-Foundation | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 13:40:12. Contact: ###-####. Grout pour pend special insp and appr. 3/8/2001 10:24:04 AM
|
BLD-Foundation | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 12:36:42. Contact: ###-####. Grout pour pend special insp and appr. 3/7/2001 11:14:29 AM
|
BLD-Foundation | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:07:08. Contact: ###-####. Grout pour pend ecial insp appr. 3/6/2001 9:56:19 AM
|
BLD-Foundation | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 14:38:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/02/2001 at 07:29:03.
|
BLD-Foundation | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 15:17:26. Contact: ###-####. CMU grout and concrete pour Pending special insp report and approvals. 3/1/2001 9:19:24 AM
|
BLD-Foundation | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 13:01:20. Contact: ###-####. wip mti on site 2/28/2001 11:01:18 AM
|
BLD-Foundation | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 11:45:32. Contact: ###-####. M.T.I. on site testing inspecting crew is placing lite weight concrete second floor S.E. corner of bldg 2/27/2001 9:43:15 AM
|
BLD-Foundation | 2/22/2001 | 2/26/2001 | 2/26/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:08:50. Contact: ###-####. Grout pend special insp and appr. 2/26/2001 11:38:40 AM
|
BLD-Foundation | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:07:59. Contact: ###-####.
|
BLD-Foundation | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 13:23:20. Contact: ###-####. Grout pour pend special insp and appr. 2/22/2001 1:13:20 PM
|
BLD-Foundation | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 10:33:02. Contact: ###-####. Grout pour...pending special insp & appr. 2/21/2001 10:31:20 AM
|
BLD-Foundation | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 13:11:22. Contact: ###-####. pend special insp and appr. 2/20/2001 12:04:53 PM
|
BLD-Foundation | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 14:11:57. Contact: ###-####. Grout pour...pend special insp and appr. 2/16/2001 10:16:41 AM
|
BLD-Foundation | 2/14/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:53:08. Contact: ###-####. CMU Pending special insp and appr. 2/15/2001 12:53:03 PM
|
BLD-Foundation | 2/13/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 17:01:38. Contact: ###-####. M.T.I on site to test and inspect 2/14/2001 4:53:22 PM
|
BLD-Foundation | 2/12/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 13:51:47. Contact: ###-####. M T I on site for spec insp 2/13/2001 2:08:14 PM
|
BLD-Foundation | 2/9/2001 | 2/12/2001 | 2/12/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 13:43:56. Contact: ###-####. CMU/Grout OK pend MTI insp and appr. 2/12/2001 12:11:15 PM
|
BLD-Foundation | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 15:59:34. Contact: ###-####. by a contractor via Hello! on 02/08/2001 at 15:59:34. Contact: ###-####. 2/9/2001 11:48:46 AM Grout pour (N.Wall) OK pend special insp and appr. 2/9/2001 11:50:30 AM
|
BLD-Foundation | 2/5/2001 | 2/6/2001 | 2/6/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/05/2001 at 15:07:47. Contact: ###-####. mti on site 2/6/2001 8:44:46 AM
|
BLD-Footing | 2/1/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 15:25:06. Contact: ###-####. M T I on site to test and inspect rebar 2/2/2001 3:22:01 PM
|
BLD-Foundation | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 10:22:01. Contact: ###-####. Grout pour OK pend special insp and appr. 1/30/2001 2:20:56 PM
|
CHANGE STATUS TO (ISS) | | | 1/29/2001 | | DONE |
|
|
|
|
BLD-Concrete | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Jim Sly
|
|
|
###-#### 1/24/2001 3:48:02 PM Grout pour OK pend special insp and appr. 1/24/2001 3:49:01 PM
|
Receive PAYMENT IN FULL | | | 1/23/2001 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 1/23/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/22/2001 | | DONE |
|
|
|
TALKED TO MARY TO VERIFY PLANS ARE READY
|
Routing - PLAN CHECK | 12/20/2000 | | 1/19/2001 | | PASS |
|
|
|
Plan Modification
|
Routing Off Site - STRUCTURAL | 12/15/2000 | | 1/19/2001 | | PASS |
|
|
|
Plan Modification. routed Plan modification to consultanting engineer via PDQ. 12/15/00 DAR NOTE: structural approved by M.Otto.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2000 | | 12/20/2000 | | PASS |
|
|
|
Plan Modification
|
Routing - PLANNING | 12/20/2000 | | 12/20/2000 | | PASS |
|
|
|
Ok per CUP00-29
|
BLD-Foundation | 12/13/2000 | 12/14/2000 | 12/14/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 13:31:37. Contact: ###-####. Pend spec insp. 12/14/2000 12:21:20 PM
|
Plan resubmittals received | | | 12/14/2000 | | |
|
|
|
|
CHANGE STATUS TO (PND) | | | 12/14/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/14/2000 | | DONE |
|
|
|
Plan Modification
|
Plan resubmittals received | | | 12/13/2000 | | DONE |
|
|
|
Received two copies of revised struct. calcs. Routed to Jim Sly. KMM
|
BLD-Foundation | 12/11/2000 | 12/12/2000 | 12/12/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 15:22:36. Contact: ###-####. Sched Continue grout pours.....OK pend spec insp.........uled by a contractor via Hello! on 12/11/2000 at 15:22:36. Contact: ###-####. 12/12/2000 9:56:06 AM
|
FIRE-Sprinkler Rough-in | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK on Supply line cover 12/12/2000 12:07:31 PM
|
Plan resubmittals received | | | 12/12/2000 | | DONE |
|
|
|
Plan resubmittals received from Architure Northwest, two sets of sheets A2.0, A2.1,S2.1, S2.2, S2.3, S2.4, S3.5, A4.O, AND A6.1. Forwarded same to Jim Sly. 12/12/00 DAR
|
BLD-Foundation | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:31:38. Contact: ###-####. Grout North CMU wall ...Pend spec insp & appr. 12/8/2000 10:58:00 AM
|
BLD-Foundation | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 12:50:03. Contact: ###-####.
|
BLD-Foundation | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 15:10:51. Contact: ###-####.
|
BLD-Foundation | 11/28/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 16:41:33. Contact: ###-####. CMU grout pour N. Gym wall OK pend spec insp & appr. 11/29/2000 2:55:54 PM
|
BLD-Foundation | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 11:06:01. Contact: ###-####. Grout pours at CMU @ gym S. wall OK pend spec 11/27/2000 12:58:35 PM
|
BLD-Foundation | 11/21/2000 | 11/22/2000 | 11/22/2000 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 13:59:41. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/22/2000 at 09:30:19.
|
BLD-Foundation | 11/21/2000 | 11/21/2000 | 11/21/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 09:16:48. Contact: ###-####. North gym found wall OK pend special insp tests and appr. 11/21/2000 3:36:23 PM
|
BLD-Footing | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 08:29:14. Contact: ###-####. footing North OK pend special insp tests and appr. 11/20/2000 4:16:01 PM
|
BLD-Foundation | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 14:22:44. Contact: ###-####. CMU Gym wall OK pend spec insp approve. 11/16/2000 3:16:42 PM
|
BLD-Foundation | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 16:38:43. Contact: ###-####. Bond beam CMU wall OKpend spec. insp apprr. 11/14/2000 2:48:01 PM
|
BLD-Foundation | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 16:15:41. Contact: ###-####.
|
BLD-Foundation | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:50:47. Contact: ###-####. Gym E. wall OK pend special insp appr. 11/7/2000 2:20:25 PM
|
BLD-Footing | 11/2/2000 | 11/3/2000 | 11/3/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 09:36:04. Contact: ###-####. Footing at Gym west wall OK pend special insp appr. 11/3/2000 2:48:30 PM
|
BLD-Footing | 10/31/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 14:42:25. Contact: ###-####. Footing OK pend special insp appr. 11/1/2000 5:05:20 PM
|
BLD-Foundation | 10/30/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 13:10:45. Contact: ###-####. West found wall OK pending special insp approve. 10/31/2000 2:39:54 PM
|
BLD-Foundation | 10/30/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 13:10:45. Contact: ###-####. West found wall OK pending special insp approve. 10/31/2000 2:39:54 PM
|
BLD-Footing | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 16:13:08. Contact: ###-####.
|
BLD-Footing | 10/25/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 12:03:14. Contact: ###-####. Rain 10/26/2000 3:21:41 PM
|
BLD-Other | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 07:52:16. Contact: ###-####. Contractor cancelled. 10/26/2000 5:00:09 PM
|
BLD-Footing | 10/23/2000 | 10/24/2000 | 10/24/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 13:09:44. Contact: ###-####. Footing for Kids 10/24/2000 1:41:29 PM
|
BLD-Conference | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 09:13:05. Contact: ###-####. Discussed proceedures for insp. with Super (Jim). 10/23/2000 4:27:48 PM
|
Plan resubmittals received | | | 10/18/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM RANDY HAVERFIELD OF ARCHITECTURE NORTHWEST TWO SETS OF SHEETS A-2.0 AND A-2.1. FORWARDED SAME TO JIM SLY . 10/19/00 DAR
|
(F) Reprint permit | | | 10/3/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2000 | | DONE |
|
|
|
called Randy and told him permit was ready, but he needed a certificate from ACHD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/25/2000 | | DONE |
|
|
|
RECEIVED TWO SETS OF RESUBMITTALS FROM RANDY HAVERFIELD SHEETS SHEETS C-2, C-3, C-4, FORWARDED SAME TO MIKE OTTO. 9/25/00 DAR
|
Plan assigned to (MLO) | 8/4/2000 | | 9/25/2000 | | PASS |
Mike Otto
|
|
|
9/25/2000 14:34:57 MLO - activity updated through activity BLDA022 from case BLD00-02246.
|
Routing - PUBLIC WORKS | 9/20/2000 | | 9/22/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET SE-1 AND SE-2. ROUTED TO MIKE OTTO. KMM
|
Plan resubmittals received | | | 9/20/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS AND SMALL DOCUMENTS FROM RANDY HAVERFIELD, ARCHITECTS NORTHWEST, TWO SETS OF SHEETA5.0, FORWARDED SAME TO MIKE OTTO 9/20/00 DAR
|
Routing - PLAN CHECK | 9/20/2000 | | 9/20/2000 | | PASS |
|
|
|
|
Routing - FIRE | 9/20/2000 | | 9/20/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/19/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM RANDY HAVERFIELD, ARCHITECTS NORTHWEST. TWO SETS OF SHEETS A-0.0, A1.0, A-3.1, FORWARDED SAME TO MIKE OTTO. 9/19/00 DAR
|
Routing - PLAN CHECK | 9/19/2000 | | 9/19/2000 | | FAIL |
|
|
|
fire rated assembly for exterior walls not provided as requested. Architect contacted by phone. MLO
|
Plan resubmittals received | | | 9/19/2000 | | PASS |
|
|
|
Fire review completed.
|
Routing - PLAN CHECK | 9/14/2000 | | 9/18/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
|
Plan resubmittals requested | | | 9/18/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - FIRE | 9/6/2000 | | 9/14/2000 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/14/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITALS FROM RANDY HAVERFIELD, 2 SETS AND A RESPONSE LETTER WITH ATTACHMENT, FORWARDED SAME TO MIKE OTTO. 9/14/00 DAR
|
Plan Review Completed(1st rev) | | | 9/14/2000 | | FAIL |
|
|
|
failed building and fire reviews
|
Routing Off Site - STRUCTURAL | 8/7/2000 | | 9/14/2000 | | PASS |
|
|
|
SENT PLANS TO OUTSIDE ENGINEER VIA PDQ. 8/7/00 DAR CORRECTIONS FAXED TO ARHCITECT
|
Routing - PUBLIC WORKS | 8/31/2000 | | 9/6/2000 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN PER BILL COLSON. 9/6/00
|
Plan resubmittals requested | | | 8/31/2000 | | FAIL |
|
|
|
UBC CORRECTIONS AND STURCTURAL
|
Routing - PLAN CHECK | 8/18/2000 | | 8/31/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLUMBING | 8/16/2000 | | 8/18/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 8/16/2000 | | 8/16/2000 | | PASS |
|
|
|
Max allowed building height is 35 feet.
|
Routing - PUBLIC WORKS | 8/7/2000 | | 8/15/2000 | | FAIL |
|
|
|
bill colson street lights, and jim rich proof of legal land div.
|
Application received | | | 8/2/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2000 | | DONE |
|
|
|
|