Permit Information
Permit NumberBLD00-02246
StatusFinaled
Name BOISE FIRST CHURCH OF THE NAZARENE
Site Address 3852 N EAGLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
BOISE FIRST CHURCH OF THE NAZARENE * SITEWORK AND BUILDING SHELL. TO CONSTRUCT A 65,906 SQ. FT. TWO STORY, TYPE II-FR, FULLY FIRE SPRINKLERED CHURCH SHELL BUILDING. OTHER WORK INCLUDES ALL SITE WORK, PAVING AND LANDSCAPING PER APPROVED PLANS AND ATTACHMENTS. NO OCCUPANCY IS AUTHORIZED UNDER THIS PERMIT. SEPARATE PLANS AND PERMITS FOR TENANT IMPROVEMENTS MUST BE SUBMITTED FOR REVIEW. CUP00-00029 , PC #622-00, MLO FIRST FLOOR HAS 38,446 SQ. FT AND THE SECOND FLOOR HAS 27,460 SQ. FT. THE FIRE SPRINKLERS WERE USED FOR AREA INCREASE.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  6/27/2002 DONE
Letter of Compliance #22539 issued 6-27-02.
BLD-Final6/19/20026/19/20026/19/2002 DONE
Final/ok for perm. occ.
Fee Review-notes8/2/20008/2/200010/18/2001 DONE
3/12-left mesg. for julie @ esi
Temporary occupancy  10/8/2001 PART
Temp. Occ. Cert. #4610 issued 10-8-01 to the Boise First Church of the Nazarene for the shell bldg.
BLD-Final10/5/200110/5/200110/5/2001PPART
DetailsJim Sly
Jim Martin, ###-#### : ) OK for Temp Occ. 10/5/2001 3:55:49 PM
PubWorks Occupancy Approval  10/2/2001 DONE
Signed Permanent Occupancy 10/02/01. R.Rokovitz
Code Occupancy Approval  10/2/2001 FAIL
Bonded for remaining landscaping $9,058.50 - Signed temporary
BLD-Other8/21/20018/21/20018/21/2001PPART
DetailsJim Sly
PROFIT Mtg. today @ 1:30 : )
BLD-Framing/Rough-in8/15/20018/16/20018/16/2001APART
DetailsJim Sly
per jim s set up for r/i Test to see if permit "un-blocked" 8/16/2001 11:07:44 AM
Inspection Record Card- Bld  6/22/2001 DONE
Telephone call  6/22/2001 DONE
TALKED TO MARY TO VERIFY PLANS ARE READY
Print Occupancy Form  6/22/2001 DONE
CHANGE STATUS TO (R)  6/8/2001 DONE
CHANGE STATUS TO (PND)  5/25/2001 DONE
plan modifcation submitted with a $500 check
FIRE-Conference4/20/20014/20/20014/20/2001PPASS
DetailsJoe Tawney
Leroy ###-#### Conf regarding elevated walkways. 4 ft wide or less does not req spklr protection. 4/20/2001 4:03:24 PM
BLD-Foundation3/30/20014/3/20014/3/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/30/2001 at 15:22:05. Contact: ###-####. Continuation of slab pours..... 4/3/2001 11:36:31 AM
BLD-Foundation3/30/20014/2/20014/2/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/30/2001 at 15:21:18. Contact: ###-####. M.T.I. on to test concrete for slab on grade 4/2/2001 9:13:57 AM
BLD-Foundation3/29/20013/30/20013/30/2001APART
DetailsAlan Hauser
special inspection 3/30/2001 9:08:44 AM
BLD-Foundation3/23/20013/26/20013/26/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/23/2001 at 15:43:40. Contact: ###-####. slab on grade mti tested concrete 3/26/2001 10:05:42 AM
BLD-Foundation3/14/20013/15/20013/15/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/14/2001 at 16:17:15. Contact: ###-####. mti on site to inspect and test 3/15/2001 10:32:58 AM
BLD-Foundation3/12/20013/13/20013/13/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/12/2001 at 16:47:41. Contact: ###-####. M.T.I. on site to do spec. inpsc 3/13/2001 12:45:48 PM
BLD-Foundation3/9/20013/12/20013/12/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/09/2001 at 16:45:18. Contact: ###-####. Grout pour West wall OK pending special ins and appr. 3/12/2001 11:37:07 AM
BLD-Foundation3/8/20013/9/20013/9/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/08/2001 at 14:28:14. Contact: ###-####. Grout and deck pending special insp and appr. 3/9/2001 11:08:47 AM
BLD-Foundation3/7/20013/8/20013/8/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/07/2001 at 13:40:12. Contact: ###-####. Grout pour pend special insp and appr. 3/8/2001 10:24:04 AM
BLD-Foundation3/6/20013/7/20013/7/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/06/2001 at 12:36:42. Contact: ###-####. Grout pour pend special insp and appr. 3/7/2001 11:14:29 AM
BLD-Foundation3/5/20013/6/20013/6/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/05/2001 at 16:07:08. Contact: ###-####. Grout pour pend ecial insp appr. 3/6/2001 9:56:19 AM
BLD-Foundation3/1/20013/2/20013/2/2001ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/01/2001 at 14:38:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/02/2001 at 07:29:03.
BLD-Foundation2/28/20013/1/20013/1/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/28/2001 at 15:17:26. Contact: ###-####. CMU grout and concrete pour Pending special insp report and approvals. 3/1/2001 9:19:24 AM
BLD-Foundation2/27/20012/28/20012/28/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/27/2001 at 13:01:20. Contact: ###-####. wip mti on site 2/28/2001 11:01:18 AM
BLD-Foundation2/26/20012/27/20012/27/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/26/2001 at 11:45:32. Contact: ###-####. M.T.I. on site testing inspecting crew is placing lite weight concrete second floor S.E. corner of bldg 2/27/2001 9:43:15 AM
BLD-Foundation2/22/20012/26/20012/26/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/22/2001 at 10:08:50. Contact: ###-####. Grout pend special insp and appr. 2/26/2001 11:38:40 AM
BLD-Foundation2/22/20012/23/20012/23/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/22/2001 at 10:07:59. Contact: ###-####.
BLD-Foundation2/21/20012/22/20012/22/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/21/2001 at 13:23:20. Contact: ###-####. Grout pour pend special insp and appr. 2/22/2001 1:13:20 PM
BLD-Foundation2/20/20012/21/20012/21/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/20/2001 at 10:33:02. Contact: ###-####. Grout pour...pending special insp & appr. 2/21/2001 10:31:20 AM
BLD-Foundation2/19/20012/20/20012/20/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/19/2001 at 13:11:22. Contact: ###-####. pend special insp and appr. 2/20/2001 12:04:53 PM
BLD-Foundation2/15/20012/16/20012/16/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/15/2001 at 14:11:57. Contact: ###-####. Grout pour...pend special insp and appr. 2/16/2001 10:16:41 AM
BLD-Foundation2/14/20012/15/20012/15/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/14/2001 at 13:53:08. Contact: ###-####. CMU Pending special insp and appr. 2/15/2001 12:53:03 PM
BLD-Foundation2/13/20012/14/20012/14/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/13/2001 at 17:01:38. Contact: ###-####. M.T.I on site to test and inspect 2/14/2001 4:53:22 PM
BLD-Foundation2/12/20012/13/20012/13/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/12/2001 at 13:51:47. Contact: ###-####. M T I on site for spec insp 2/13/2001 2:08:14 PM
BLD-Foundation2/9/20012/12/20012/12/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/09/2001 at 13:43:56. Contact: ###-####. CMU/Grout OK pend MTI insp and appr. 2/12/2001 12:11:15 PM
BLD-Foundation2/8/20012/9/20012/9/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/08/2001 at 15:59:34. Contact: ###-####. by a contractor via Hello! on 02/08/2001 at 15:59:34. Contact: ###-####. 2/9/2001 11:48:46 AM Grout pour (N.Wall) OK pend special insp and appr. 2/9/2001 11:50:30 AM
BLD-Foundation2/5/20012/6/20012/6/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/05/2001 at 15:07:47. Contact: ###-####. mti on site 2/6/2001 8:44:46 AM
BLD-Footing2/1/20012/2/20012/2/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/01/2001 at 15:25:06. Contact: ###-####. M T I on site to test and inspect rebar 2/2/2001 3:22:01 PM
BLD-Foundation1/29/20011/30/20011/30/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/29/2001 at 10:22:01. Contact: ###-####. Grout pour OK pend special insp and appr. 1/30/2001 2:20:56 PM
CHANGE STATUS TO (ISS)  1/29/2001 DONE
BLD-Concrete1/24/20011/24/20011/24/2001PPART
DetailsJim Sly
###-#### 1/24/2001 3:48:02 PM Grout pour OK pend special insp and appr. 1/24/2001 3:49:01 PM
Receive PAYMENT IN FULL  1/23/2001 DONE
Receive PAYMENT IN FULL PRINT  1/23/2001 DONE
Inspection Record Card- Bld  1/22/2001 DONE
Print Occupancy Form  1/22/2001 DONE
Telephone call  1/22/2001 DONE
TALKED TO MARY TO VERIFY PLANS ARE READY
Routing - PLAN CHECK12/20/2000 1/19/2001 PASS
Plan Modification
Routing Off Site - STRUCTURAL12/15/2000 1/19/2001 PASS
Plan Modification. routed Plan modification to consultanting engineer via PDQ. 12/15/00 DAR NOTE: structural approved by M.Otto.
PLANS/APPL TAKEN TO FRONT DESK  1/19/2001 DONE
Routing - PUBLIC WORKS12/14/2000 12/20/2000 PASS
Plan Modification
Routing - PLANNING12/20/2000 12/20/2000 PASS
Ok per CUP00-29
BLD-Foundation12/13/200012/14/200012/14/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/13/2000 at 13:31:37. Contact: ###-####. Pend spec insp. 12/14/2000 12:21:20 PM
Plan resubmittals received  12/14/2000  
CHANGE STATUS TO (PND)  12/14/2000 DONE
Plans ACCEPTED BY PLAN TECH  12/14/2000 DONE
Plan Modification
Plan resubmittals received  12/13/2000 DONE
Received two copies of revised struct. calcs. Routed to Jim Sly. KMM
BLD-Foundation12/11/200012/12/200012/12/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/11/2000 at 15:22:36. Contact: ###-####. Sched Continue grout pours.....OK pend spec insp.........uled by a contractor via Hello! on 12/11/2000 at 15:22:36. Contact: ###-####. 12/12/2000 9:56:06 AM
FIRE-Sprinkler Rough-in12/12/200012/12/200012/12/2000PPART
DetailsJoe Tawney
###-####. OK on Supply line cover 12/12/2000 12:07:31 PM
Plan resubmittals received  12/12/2000 DONE
Plan resubmittals received from Architure Northwest, two sets of sheets A2.0, A2.1,S2.1, S2.2, S2.3, S2.4, S3.5, A4.O, AND A6.1. Forwarded same to Jim Sly. 12/12/00 DAR
BLD-Foundation12/7/200012/8/200012/8/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/07/2000 at 15:31:38. Contact: ###-####. Grout North CMU wall ...Pend spec insp & appr. 12/8/2000 10:58:00 AM
BLD-Foundation12/5/200012/6/200012/6/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/05/2000 at 12:50:03. Contact: ###-####.
BLD-Foundation11/30/200012/1/200012/1/2000APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/30/2000 at 15:10:51. Contact: ###-####.
BLD-Foundation11/28/200011/29/200011/29/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/28/2000 at 16:41:33. Contact: ###-####. CMU grout pour N. Gym wall OK pend spec insp & appr. 11/29/2000 2:55:54 PM
BLD-Foundation11/27/200011/27/200011/27/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/27/2000 at 11:06:01. Contact: ###-####. Grout pours at CMU @ gym S. wall OK pend spec 11/27/2000 12:58:35 PM
BLD-Foundation11/21/200011/22/200011/22/2000PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/21/2000 at 13:59:41. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/22/2000 at 09:30:19.
BLD-Foundation11/21/200011/21/200011/21/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/21/2000 at 09:16:48. Contact: ###-####. North gym found wall OK pend special insp tests and appr. 11/21/2000 3:36:23 PM
BLD-Footing11/20/200011/20/200011/20/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/20/2000 at 08:29:14. Contact: ###-####. footing North OK pend special insp tests and appr. 11/20/2000 4:16:01 PM
BLD-Foundation11/15/200011/16/200011/16/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/15/2000 at 14:22:44. Contact: ###-####. CMU Gym wall OK pend spec insp approve. 11/16/2000 3:16:42 PM
BLD-Foundation11/13/200011/14/200011/14/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/13/2000 at 16:38:43. Contact: ###-####. Bond beam CMU wall OKpend spec. insp apprr. 11/14/2000 2:48:01 PM
BLD-Foundation11/9/200011/13/200011/13/2000APART
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 11/09/2000 at 16:15:41. Contact: ###-####.
BLD-Foundation11/6/200011/7/200011/7/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/06/2000 at 15:50:47. Contact: ###-####. Gym E. wall OK pend special insp appr. 11/7/2000 2:20:25 PM
BLD-Footing11/2/200011/3/200011/3/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/02/2000 at 09:36:04. Contact: ###-####. Footing at Gym west wall OK pend special insp appr. 11/3/2000 2:48:30 PM
BLD-Footing10/31/200011/1/200011/1/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/31/2000 at 14:42:25. Contact: ###-####. Footing OK pend special insp appr. 11/1/2000 5:05:20 PM
BLD-Foundation10/30/200010/31/200010/31/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/30/2000 at 13:10:45. Contact: ###-####. West found wall OK pending special insp approve. 10/31/2000 2:39:54 PM
BLD-Foundation10/30/200010/31/200010/31/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/30/2000 at 13:10:45. Contact: ###-####. West found wall OK pending special insp approve. 10/31/2000 2:39:54 PM
BLD-Footing10/26/200010/27/200010/27/2000APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/26/2000 at 16:13:08. Contact: ###-####.
BLD-Footing10/25/200010/26/200010/26/2000PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/25/2000 at 12:03:14. Contact: ###-####. Rain 10/26/2000 3:21:41 PM
BLD-Other10/26/200010/26/200010/26/2000PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/26/2000 at 07:52:16. Contact: ###-####. Contractor cancelled. 10/26/2000 5:00:09 PM
BLD-Footing10/23/200010/24/200010/24/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/23/2000 at 13:09:44. Contact: ###-####. Footing for Kids 10/24/2000 1:41:29 PM
BLD-Conference10/23/200010/23/200010/23/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/23/2000 at 09:13:05. Contact: ###-####. Discussed proceedures for insp. with Super (Jim). 10/23/2000 4:27:48 PM
Plan resubmittals received  10/18/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM RANDY HAVERFIELD OF ARCHITECTURE NORTHWEST TWO SETS OF SHEETS A-2.0 AND A-2.1. FORWARDED SAME TO JIM SLY . 10/19/00 DAR
(F) Reprint permit  10/3/2000 DONE
Issue PAID IN FULL permit  9/29/2000 DONE
Inspection Record Card- Bld  9/26/2000 DONE
Print Occupancy Form  9/26/2000 DONE
Telephone call  9/26/2000 DONE
called Randy and told him permit was ready, but he needed a certificate from ACHD
PLANS/APPL TAKEN TO FRONT DESK  9/25/2000 DONE
Plan resubmittals received  9/25/2000 DONE
RECEIVED TWO SETS OF RESUBMITTALS FROM RANDY HAVERFIELD SHEETS SHEETS C-2, C-3, C-4, FORWARDED SAME TO MIKE OTTO. 9/25/00 DAR
Plan assigned to (MLO)8/4/2000 9/25/2000 PASS
DetailsMike Otto
9/25/2000 14:34:57 MLO - activity updated through activity BLDA022 from case BLD00-02246.
Routing - PUBLIC WORKS9/20/2000 9/22/2000 PASS
Plan resubmittals received  9/20/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET SE-1 AND SE-2. ROUTED TO MIKE OTTO. KMM
Plan resubmittals received  9/20/2000 DONE
RECEIVED PLAN RESUBMITTALS AND SMALL DOCUMENTS FROM RANDY HAVERFIELD, ARCHITECTS NORTHWEST, TWO SETS OF SHEETA5.0, FORWARDED SAME TO MIKE OTTO 9/20/00 DAR
Routing - PLAN CHECK9/20/2000 9/20/2000 PASS
Routing - FIRE9/20/2000 9/20/2000 PASS
Plan resubmittals received  9/19/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM RANDY HAVERFIELD, ARCHITECTS NORTHWEST. TWO SETS OF SHEETS A-0.0, A1.0, A-3.1, FORWARDED SAME TO MIKE OTTO. 9/19/00 DAR
Routing - PLAN CHECK9/19/2000 9/19/2000 FAIL
fire rated assembly for exterior walls not provided as requested. Architect contacted by phone. MLO
Plan resubmittals received  9/19/2000 PASS
Fire review completed.
Routing - PLAN CHECK9/14/2000 9/18/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
Plan resubmittals requested  9/18/2000 FAIL
UBC CORRECTIONS
Routing - FIRE9/6/2000 9/14/2000 FAIL
Plan resubmittals received  9/14/2000 DONE
RECEIVED PLAN RESUBMITALS FROM RANDY HAVERFIELD, 2 SETS AND A RESPONSE LETTER WITH ATTACHMENT, FORWARDED SAME TO MIKE OTTO. 9/14/00 DAR
Plan Review Completed(1st rev)  9/14/2000 FAIL
failed building and fire reviews
Routing Off Site - STRUCTURAL8/7/2000 9/14/2000 PASS
SENT PLANS TO OUTSIDE ENGINEER VIA PDQ. 8/7/00 DAR CORRECTIONS FAXED TO ARHCITECT
Routing - PUBLIC WORKS8/31/2000 9/6/2000 FAIL
REQUIRES STREET LIGHT PLAN PER BILL COLSON. 9/6/00
Plan resubmittals requested  8/31/2000 FAIL
UBC CORRECTIONS AND STURCTURAL
Routing - PLAN CHECK8/18/2000 8/31/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing - PLUMBING8/16/2000 8/18/2000 PASS
Routing - PLANNING8/16/2000 8/16/2000 PASS
Max allowed building height is 35 feet.
Routing - PUBLIC WORKS8/7/2000 8/15/2000 FAIL
bill colson street lights, and jim rich proof of legal land div.
Application received  8/2/2000  
Recd Pcfee & Taken To Pln CK  8/2/2000 DONE