Case Summary (BLD) | | | 6/9/2014 | | DONE |
|
|
|
|
Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/19/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9182 issued 6-19-02 to the Renaissance @ Liberty Lake Apts., center portion.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | | PASS |
|
|
|
Final, ok for perm. occ.
|
Case Summary (BLD) | | | 1/16/2002 | | |
|
|
|
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 12/11/2001 7:59:10 AM
|
Temporary occupancy | | | 10/10/2001 | | DONE |
|
|
|
Temp. Occ. Cert. #4614 issued 10-10-01 to the Renaissance @ Liberty Lake, Bldg. #4, center portion.
|
BLD-Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 15:22:44. Contact: ###-####. ok for temp occ needs temp glass two places 10/9/2001 2:22:01 PM
|
BLD-Final | 10/5/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 10/5/2001 8:27:34 AM Ok for perm. occ.
|
FIRE-Final Inspection | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### JEFF CALLED IN AND CANCLED INSPECTION 10-4-01 ///DLD
|
BLD-Energy code compliance | 8/11/2001 | 8/13/2001 | 8/13/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/11/2001 at 12:07:28. Contact: ###-####.
|
BLD-Energy code compliance | 8/11/2001 | 8/13/2001 | 8/11/2001 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/11/2001 at 12:01:52. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/11/2001 at 12:06:01.
|
BLD-Wall cover | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 14:36:14. Contact: ###-####. ok to insulate south side 8/9/2001 11:17:33 PM
|
BLD-Wall cover | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 08:18:59. Contact: ###-####.
|
BLD-Energy code compliance | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 14:35:48. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/2/2001 | 8/3/2001 | 8/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
late pm ###-#### ok to insulate center 8/3/2001 4:24:55 AM
|
BLD-Wall cover | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 14:43:34. Contact: ###-####. ok to insulate 4 north units 8/1/2001 10:02:37 PM
|
BLD-Framing/Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PART |
Tom Arcoraci
|
|
|
fire caulking ###-#### OK ROCK BEHIND TUBS 7/23/2001 10:28:58 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Tom Arcoraci
|
|
|
partial jeff ###-#### WIP SHEAR PARTIAL 5/31/2001 4:51:35 PM 5/31/2001 4:53:11 PM
|
BLD-Footing | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
Larry ###-####
|
BLD-Footing | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PART |
Russ Owen
|
|
|
###-#### poured appears ok . 3/27/2001 1:43:32 PM
|
Issue PAID IN FULL permit | | | 3/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/7/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2001 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/3/2000 | | 3/6/2001 | | PASS |
Carl Westfall
|
|
|
3/6/01 13:19:13 CJW - activity updated through activity BLDA022 from case BLD00-02260.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 2/27/2001 | 2/27/2001 | 2/27/2001 | | PASS |
|
|
|
Approved per CUP99-127 Dave Abo and per DRH99-258 Marty S.
|
Plan Reviewer's activity | | | 2/24/2001 | | PASS |
|
|
|
See BLD00-02250 for routing information.
|
Routing - FIRE | 2/14/2001 | 2/20/2001 | 2/20/2001 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 10/18/2000 | 10/24/2000 | 10/24/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 10/24/2000 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 9/1/2000 | | 10/18/2000 | | |
|
|
|
Failed first UBC plan review. Drawings not routed until all plan reviews were done.
|
Telephone call | | | 10/12/2000 | | DONE |
|
|
|
Called Jim Graedwohl with Bonnett Engineering and discussed the lateral design. He said he would review his calculations and call me back.
|
Plan Reviewer's activity | | | 10/11/2000 | | |
|
|
|
Failed first UBC plan review. UBC plan review started October 11, 2000 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - PLANNING | 8/30/2000 | | 8/31/2000 | | PASS |
|
|
|
See approval in DRH00-258
|
Routing - PLUMBING | 8/28/2000 | | 8/30/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/24/2000 | | 8/28/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/24/2000 | | DONE |
|
|
|
PLAN REVIEW MONEY RECEIVED. STARTED ROUTING PLANS.
|
Application received | | | 8/3/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 2/27/2001 | | | | |
|
|
|
|