Case Summary (BLD) | | | 6/9/2014 | | DONE |
|
|
|
|
Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9179 issued 6-18-02 to the Renaissance @ Liberty Lake Apts., center portion, Bldg. #2.
|
BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
Final, ok for perm. occ. cert.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PART |
Tom Arcoraci
|
|
|
wip 1/28/2002 8:41:23 AM
|
Case Summary (BLD) | | | 1/16/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 1/16/2002 | | |
|
|
|
|
FIRE-Final Inspection | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/26/2001 11:33:43 AM Correction notice completed. Fire life/safety finaled. Ok for perm occ
|
BLD-Aging Inspection | 10/30/2001 | 10/30/2001 | 10/30/2001 | | PART |
Tom Arcoraci
|
|
|
wip 10/30/2001 8:54:33 AM
|
Temporary occupancy | | | 8/31/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4586 issued 8-31-01 to the Renaissance @ Liberty Lakes Apts., Bldg. #2 center portion.
|
FIRE-Final Inspection | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Joe Tawney
|
|
|
Final OK for temporary Occupancy. C/N issued 8/30/2001 2:04:40 PM
|
BLD-Final | 8/29/2001 | 8/30/2001 | 8/30/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 16:15:14. Contact: ###-####. ok for temp 8/30/2001 5:50:12 AM
|
BLD-Energy code compliance | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
jeff ###-#### insulation
|
BLD-Framing/Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
dry wall nailing--jeff- ###-####
|
BLD-Framing/Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Tom Arcoraci
|
|
|
###-####
|
BLD-Energy code compliance | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### Jeff
|
BLD-Framing/Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to inul west and center 6/27/2001 3:27:02 AM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Tom Arcoraci
|
|
|
fire calking jeff ###-#### ok to rock bath tub walls 6/19/2001 4:52:23 AM
|
BLD-Conference | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Tom Arcoraci
|
|
|
jEFF bURNS ###-####
|
BLD-Conference | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
jeff- ###-#### for conf ok to use exp in 710.3 ubc for third floor ceiling 6/8/2001 11:07:54 AM
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/7/2001 | P | PASS |
Tom Arcoraci
|
|
|
Jeff ###-#### fire place and corr material 6/7/2001 9:59:33 AM
|
BLD-Conference | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Tom Arcoraci
|
|
|
John ###-#### PLUMBING FIRE STOP WILL BE METACAULK 1000 5/31/2001 11:44:48 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Tom Arcoraci
|
|
|
partial Jeff ###-#### WIP SHEAR PARTIAL 5/31/2001 4:51:03 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### WIP 5/11/2001 2:42:31 PM
|
BLD-Conference | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
Jeff ###-#### conf on stairs and exit width 5/7/2001 5:31:01 PM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PART |
Tom Arcoraci
|
|
|
shear wall \\###-#### ok to rock ext first floor 5/7/2001 5:29:58 PM
|
BLD-Conference | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### 4x12 stringers for stairs per plan 4/30/2001 11:31:39 AM
|
BLD-Footing | 4/24/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Dave Hannah
|
|
|
late pm ###-####
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### JEFF conf on eng 4/23/2001 3:35:43 PM
|
BLD-Conference | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### Jeff Burns ec conf r19walls r38 ceiling u-50 windows ok per 325 4/4/2001 3:34:21 PM
|
BLD-Conference | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | NH |
Russ Owen
|
|
|
Jeff Burns ###-#### no one at the site called left mesg. 4/3/2001 10:34:41 AM
|
Issue PAID IN FULL permit | | | 3/30/2001 | | DONE |
|
|
|
|
BLD-Foundation | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Footing | 3/23/2001 | 3/26/2001 | 3/26/2001 | P | PASS |
Tom Arcoraci
|
|
|
pumping at 3:OO LARRY ###-####
|
(F) Reprint permit | | | 3/16/2001 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/3/2000 | | 3/6/2001 | | PASS |
Carl Westfall
|
|
|
3/6/01 13:22:52 CJW - activity updated through activity BLDA022 from case BLD00-02268.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/6/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/6/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 2/27/2001 | 2/27/2001 | 2/27/2001 | | PASS |
|
|
|
Approved per CUP99-127 Dave Abo and per DRH99-258 Marty S.
|
Plan Reviewer's activity | | | 2/24/2001 | | PASS |
|
|
|
DRAWINGS APPROVED, WITH CONDITIONS, AFTER RESUBMITTAL REVEIW.
|
Routing - FIRE | 2/14/2001 | 2/20/2001 | 2/20/2001 | | PASS |
Bill Alexander
|
|
|
|
Plan Reviewer's activity | | | 2/1/2001 | | |
|
|
|
Failed 2nd UBC plan review. Completed 2nd UBC plan review. Items still not resolved.
|
Routing - FIRE | 10/18/2000 | 10/23/2000 | 10/24/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 10/24/2000 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 9/1/2000 | | 10/18/2000 | | |
|
|
|
Failed first UBC review. Drawings not routed until all reviews were done.
|
Plan Reviewer's activity | | | 9/27/2000 | | |
|
|
|
Failed first UBC plan review. UBC plan review started September 27, 2000 and finished October 3, 2000. A response from the architect was required. See the conditions list.
|
Routing - PLANNING | | | 8/31/2000 | | PASS |
|
|
|
See approval in DRH00-258
|
Routing - PLUMBING | 8/28/2000 | | 8/30/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/24/2000 | | 8/28/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/24/2000 | | DONE |
|
|
|
PLAN REVIEW MONEY RECEIVED. STARTED ROUTING PLANS.
|
Application received | | | 8/3/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 2/27/2001 | | | | |
|
|
|
|