Permit Information
Permit NumberBLD00-02277
StatusFinaled
Name (BLD 7) (II) RENAISSANCE @ LIBERTY
Site Address 1179 N LIBERTY ST Unit: (CENTER PORTION)
Project NameRENAISSANCE @ LIBERTY
Customer Number 
ePlanReviewNo
Description
(RENAISSANCE AT LIBERTY LAKE - BUILDING #7 - Type II - CENTER PORTION) The entire building shall be of Type V-1hr construction for fire flow (2,500 gpm required). The 3 story center portion shall be fire sprinklered because it is 3 stories tall. To construct the center portion of a 3 story, 20 unit, 19,328 square foot (8,886 square feet projected roof area) apartment building. All ground floor units shall comply as "Type B" dwelling units. Work is to include concrete footings, foundations, and slabs on grade; wood stud wall systems; wood joist floor systems; wood truss roof systems; 1-hr corridors; exterior stairways; 2-hr area separation walls; vinyl siding; a fire alarm system; and composition shingles all per approved drawings, engineering, and plan review conditions on file (see BLD00-02268 for the conditions list). The fire sprinkler system within the 3 story center portion shall comply with NFPA 13R-1996 as regulated by the Fire Department. See BLD00-02275 for the NORTH PORTION and BLD00-02276 for the SOUTH PORTION. DR99-00258 CUP 99-00127 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/9/2014 DONE
Fee Review-notes6/27/20036/27/20036/27/2003 DONE
Permanent occupancy  6/21/2002 DONE
Perm. Occ. Cert. #9197 issued 6-21-02 to the Renaissance @ Liberty Lake Apts., Bldg. #7, center portion.
BLD-Final6/13/20026/13/20026/13/2002 DONE
Final ok - approved/perm. occ.
Permanent Occupancy 6/13/20026/13/2002 DONE
Details
Case Summary (BLD)  1/16/2002  
Temporary occupancy  12/5/2001 PART
Temp. Occ. Cert. #4676 issued 12-5-01 to the Renaissance at Liberty Lake Apts., Bldg. #7, center portion.
BLD-Final12/3/200112/4/200112/4/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/03/2001 at 16:59:13. Contact: ###-####. ok for temp 12/5/2001 7:47:50 AM
FIRE-Final Inspection11/30/200111/30/200111/30/2001PPASS
DetailsTroy Cobbley
Fire sprinkler system finaled. 11/30/2001 1:45:30 PM
FIRE-Alarm Testing11/27/200111/29/200111/29/2001APASS
DetailsTroy Cobbley
Fire life/safety finaled. 11/29/2001 11:19:33 AM
BLD-Wall cover10/31/200111/1/200111/1/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/31/2001 at 10:50:20. Contact: ###-####. ok to cover west side of bld 8 11/1/2001 11:42:20 AM
BLD-Wall cover10/18/200110/19/200110/19/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/18/2001 at 09:04:27. Contact: ###-####.
BLD-Wall cover10/19/200110/19/200110/19/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 10/19/2001 10:23:26 AM drops ok to cover 10/19/2001 3:18:10 PM
BLD-Wall cover10/17/200110/18/200110/18/2001PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/17/2001 at 09:32:30. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/18/2001 at 09:03:18.
BLD-Wall cover10/17/200110/17/200110/17/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 10/17/2001 10:06:30 AM ok for cover 10/17/2001 4:02:36 PM
BLD-Wall cover10/16/200110/17/200110/17/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/16/2001 at 16:05:26. Contact: ###-####. will do in pm 10/17/2001 10:07:07 AM
BLD-Wall cover10/12/200110/16/200110/16/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/12/2001 at 14:38:44. Contact: ###-####.
BLD-Wall cover10/5/200110/9/200110/9/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/05/2001 at 16:48:39. Contact: ###-####.
BLD-Wall cover10/4/200110/4/200110/4/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/04/2001 at 08:52:45. Contact: ###-####. wip ok 10/4/2001 4:09:47 PM
BLD-Wall cover10/1/200110/3/200110/3/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/01/2001 at 14:47:09. Contact: ###-####. needs studs replaced or other on third floor 10/3/2001 12:04:14 PM
BLD-Wall cover9/26/20019/26/20019/26/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/26/2001 at 07:28:21. Contact: ###-####. OK TO INSUL SOUTH 4 9/26/2001 4:17:03 PM
BLD-Wall cover9/21/20019/24/20019/24/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/21/2001 at 15:01:45. Contact: ###-####. ok to set tub 9/24/2001 3:32:45 PM
BLD-Aging Inspection8/6/20018/6/20018/6/2001 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/31/20015/31/20015/31/2001PPART
DetailsTom Arcoraci
5/31/2001 4:53:26 PM SHEAR PARTIAL WIP 5/31/2001 4:53:43 PM
BLD-Footing5/9/20015/9/20015/9/2001PPASS
DetailsTom Arcoraci
jeff ###-####- interior ft wip 5/10/2001 8:14:24 AM
BLD-Footing4/25/20014/26/20014/26/2001APASS
DetailsDave Hannah
###-####
BLD-Foundation4/24/20014/25/20014/25/2001APASS
DetailsDave Hannah
###-#### stem wall bld 4 4/25/2001 10:18:07 AM
Issue PAID IN FULL permit  3/15/2001 DONE
Print Occupancy Form  3/7/2001 DONE
Inspection Record Card- Bld  3/7/2001 DONE
Plan assigned to (CJW)8/3/2000 3/6/2001 PASS
DetailsCarl Westfall
3/6/01 13:26:04 CJW - activity updated through activity BLDA022 from case BLD00-02277.
PLANS/APPL TAKEN TO FRONT DESK  3/6/2001 PASS
Routing - PLANNING2/27/20012/27/20012/27/2001 PASS
Approved per CUP99-127 Dave Abo and per DRH99-258 Marty S.
Routing - FIRE2/14/20012/20/20012/20/2001 PASS
DetailsBill Alexander
Routing - FIRE10/18/200010/23/200010/24/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  10/24/2000  
Failed first UBC plan review.
Routing - PLAN CHECK9/1/2000 10/18/2000  
Failed first UBC plan review. Drawings not routed until all plan reviews were done.
Plan Reviewer's activity  9/27/2000  
Failed first UBC plan review. UBC plan review started September 27, 2000 and finished October 3, 2000. See the conditions list under BLD00-02268. A response from the architect was required.
Routing - PLANNING  8/31/2000 PASS
See approval in DRH00-258
Routing - PLUMBING8/28/2000 8/30/2000 PASS
Routing - PUBLIC WORKS8/24/2000 8/28/2000 PASS
Plan routing begun/NEW & ADDTN  8/24/2000 DONE
PLAN REVIEW MONEY RECEIVED. STARTED ROUTING PLANS.
Application received  8/3/2000  
Plan Reviewer's activity    PASS
See permit BLD00-02268 for additional information.
Routing - PLAN CHECK2/27/2001