Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD00-02285
StatusFinaled
Name (BLD 12) (II) RENAISSANCE @ LIBERTY
Site Address 1277 N LIBERTY ST Unit: (CENTER PORTION)
Project NameRENAISSANCE @ LIBERTY
Customer Number 
ePlanReviewNo
Description
(RENAISSANCE AT LIBERTY LAKE - BUILDING #12 - Type II - CENTER PORTION) The entire building shall be of Type V-1hr construction for fire flow (2,500 gpm required). The 3 story center portion shall be fire sprinklered because it is 3 stories tall. To construct the center portion of a 3 story, 20 unit, 19,328 square foot (8,886 square feet projected roof area) apartment building. All ground floor units shall comply as "Type B" dwelling units. Work is to include concrete footings, foundations, and slabs on grade; wood stud wall systems; wood joist floor systems; wood truss roof systems; 1-hr corridors; exterior stairways; 2-hr area separation walls; vinyl siding; a fire alarm system; and composition shingles all per approved drawings, engineering, and plan review conditions on file (see BLD00-02268 for the conditions list). The fire sprinkler system within the 3 story center portion shall comply with NFPA 13R-1996 as regulated by the Fire Department. See BLD00-02258 for the NORTH PORTION and BLD00-02284 for the SOUTH PORTION. DR 99-00258 CUP 99-00127 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/9/2014 DONE
Fee Review-notes6/27/20036/27/20036/27/2003 DONE
Permanent occupancy  6/24/2002 DONE
Perm. Occ. Cert. #9210 issued 6-24-02 to the Renaissance @ Libert Lake Apts., Bldg. #12, center portion.
Permanent Occupancy 6/13/20026/13/2002 DONE
Details
BLD-Final6/13/20026/13/20026/13/2002 DONE
Final - approved/perm. occ.
Temporary occupancy  2/22/2002 PART
Temp. Occ. Cert. #4735 issued 2-22-02 to the Renaissance @ Liberty Lake, Bldg. #12, center portion.
BLD-Final2/20/20022/21/20022/21/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/20/2002 at 13:49:47. Contact: ###-####. OK for Temp Occ. 2/21/2002 2:14:34 PM
FIRE-Final Inspection2/15/20022/15/20022/15/2002PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 2/15/2002 2:04:11 PM Fire life/safety finaled. Fire sprinkler and fire alarm finaled
Case Summary (BLD)  1/16/2002  
BLD-Wall cover12/21/200112/24/200112/24/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/21/2001 at 16:29:51. Contact: ###-####. ok to cover south 4 of 12 12/24/2001 9:35:49 AM
BLD-Wall cover12/21/200112/24/200112/24/2001ACANC
DetailsTom Arcoraci
Scheduled by Inspector: 407 On 12/21/2001 5:21:24 PM
BLD-Wall cover12/21/200112/21/200112/21/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/21/2001 at 08:37:09. Contact: ###-####.unable to do set up for monday am. 12/21/2001 5:23:18 PM
BLD-Wall cover12/18/200112/19/200112/19/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/18/2001 at 15:54:25. Contact: 94197748. 2nd and 3rd floors ok to cover 12/19/2001 9:55:35 AM
BLD-Wall cover12/12/200112/13/200112/13/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/12/2001 at 09:13:03. Contact: ###-####.ok north side. 12/13/2001 11:52:16 AM
BLD-Wall cover12/11/200112/12/200112/12/2001PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/11/2001 at 13:38:03. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/12/2001 at 09:10:38.
BLD-Wall cover12/6/200112/7/200112/7/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/06/2001 at 13:38:25. Contact: ###-####. ok to cover center sec of bld 11 12/7/2001 11:05:01 AM
BLD-Wall cover12/5/200112/6/200112/6/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/05/2001 at 17:23:02. Contact: ###-####. ok to rock 12/6/2001 12:27:13 PM
BLD-Wall cover12/6/200112/6/200112/6/2001PPART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/6/2001 10:29:57 AM
BLD-Wall cover12/4/200112/5/200112/5/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/04/2001 at 09:14:37. Contact: ###-####. ok for drops need to re inspect two hr walls at 3rd floor 12/5/2001 1:58:32 PM
BLD-Wall cover12/3/200112/4/200112/4/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/03/2001 at 09:50:42. Contact: ###-####. wip 12/4/2001 8:46:06 AM
BLD-Framing/Rough-in11/29/200111/30/200111/30/2001APART
DetailsTom Arcoraci
JEFF ###-#### WALL COVER wip 11/30/2001 11:44:57 AM
BLD-Framing/Rough-in11/30/200111/30/200111/30/2001PPART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/30/2001 10:35:57 AM ok inul north 4 units 11/30/2001 2:49:17 PM
BLD-Wall cover11/26/200111/27/200111/27/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/26/2001 at 12:07:01. Contact: ###-####. ok to set tubs 11/27/2001 11:04:10 AM
BLD-Aging Inspection10/29/200110/29/200110/29/2001 PART
DetailsTom Arcoraci
wip 10/29/2001 1:32:50 PM
BLD-Aging Inspection8/27/20018/27/20018/27/2001 PART
DetailsTom Arcoraci
wip 8/26/2001 9:18:29 PM
BLD-Footing6/26/20016/27/20016/27/2001PPASS
DetailsTom Arcoraci
###-####
BLD-Foundation5/22/20015/22/20015/22/2001PPASS
DetailsTom Arcoraci
Larry ###-#### they are pouring at one o clock
BLD-Footing5/9/20015/10/20015/10/2001APART
DetailsTom Arcoraci
Larry ###-####
Issue PAID IN FULL permit  3/15/2001 DONE
Print Occupancy Form  3/7/2001 DONE
Inspection Record Card- Bld  3/7/2001 DONE
Plan assigned to (CJW)8/3/2000 3/6/2001 PASS
DetailsCarl Westfall
3/6/01 13:30:12 CJW - activity updated through activity BLDA022 from case BLD00-02285.
PLANS/APPL TAKEN TO FRONT DESK  3/6/2001 PASS
Routing - PLANNING2/27/20012/27/20012/27/2001 PASS
Approved per CUP99-127 Dave Abo and per DRH99-258 Marty S
Plan Reviewer's activity  2/24/2001 PASS
See BLD00-02268 for more information.
Routing - FIRE2/14/20012/20/20012/20/2001 PASS
DetailsBill Alexander
Routing - FIRE10/18/200010/23/200010/24/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  10/24/2000  
Failed first UBC plan review.
Routing - PLAN CHECK9/1/2000 10/18/2000  
Failed first UBC review. Drawings not routed until all plan reviews were done.
Plan Reviewer's activity  9/27/2000  
Failed first UBC plan review. UBC plan review started September 27, 2000 and finished October 3, 2000. See the conditions list under BLD00-02268. A response from the architect was required.
Routing - PLANNING  8/31/2000 PASS
See approval in DRH00-258
Routing - PLUMBING8/28/2000 8/30/2000 PASS
Routing - PUBLIC WORKS8/24/2000 8/28/2000 PASS
Plan routing begun/NEW & ADDTN  8/24/2000 DONE
RECEIVED PLAN REVIEW MONEY. STARTED ROUTING PLANS.
Application received  8/3/2000  
Routing - PLAN CHECK2/27/2001