Fee Review-notes | 8/3/2000 | 8/3/2000 | 4/30/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 3/18/2003 | 3/18/2003 | 3/18/2003 | | PASS |
Jim Sly
|
|
|
Previously passed by 425 3/18/2003 4:31:44 PM
|
DOC - Permit Finaled | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 3/18/2003 4:31:51 PM
|
BLD-Final | 4/27/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PASS |
Tom Arcoraci
|
|
|
FR GENE ###-####
|
BLD-Framing/Rough-in | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | CANC |
Tom Arcoraci
|
|
|
Gene ###-####--CANCEL- PER GENE
|
BLD-Framing/Rough-in | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | CANC |
Tom Arcoraci
|
|
|
Gene ###-####
|
BLD-Framing/Rough-in | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Tom Arcoraci
|
|
|
2HR WALL CANOPY\\###-#### 11/3/2000 3:55:42 PM cn posted wall covered without inspection needs fire blk ect...... 11/3/2000 4:55:20 PM
|
BLD-Conference | 9/22/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 9/22/2000 paraphat ok to cover
|
BLD-Conference | 9/22/2000 | 9/22/2000 | 9/22/2000 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 9/22/2000 paraphat ok to cover
|
BLD-Framing/Rough-in | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tom Arcoraci
|
|
|
FR -TIM ###-#### conf on 2 hr wall with 325 also 9/20/2000 4:10:21 PM
|
BLD-Framing/Rough-in | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | FAIL |
Tom Arcoraci
|
|
|
R/I- SCOTT -PLEASE CALL 1ST BEFORE INSP-###-#### provide details for two hour wall 9/14/2000 4:05:21 PM
|
Issue PAID IN FULL permit | | | 9/12/2000 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/14/2000 | | 9/8/2000 | | PASS |
Carl Westfall
|
|
|
9/8/00 13:20:54 CJW - activity updated through activity BLDA022 from case BLD00-02304.
|
Routing - PLAN CHECK | 9/6/2000 | | 9/8/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/8/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/8/2000 | | DONE |
|
|
|
called permit ready
|
Routing - FIRE | 9/1/2000 | 9/6/2000 | 9/6/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 9/6/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/14/2000 | | 9/1/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/31/2000 | | PASS |
|
|
|
UBC plan review started August 31, 2000 and finished the next day. The drawings were approved with conditions. See the conditions list.
|
Plan routing begun/TENANTS | | | 8/14/2000 | | DONE |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plan Reviewer's activity | | | 8/11/2000 | | DONE |
|
|
|
NO APPROVAL OR REVIEW REQUIRED BY PLANNING STAFF per Marty Santoyo.
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2000 | | HOLD |
|
|
|
REQUIRES PLANS TO BE FULLY DIMENSIONED. TYPICAL OR OVERALL. SITE PLAN NEEDS TO SHOUW FIRE HYDRANT PLACEMENT, RADIUS CURVES BUIODING DIMENSIONS AND ALL DISTANCES TO PROPERTY LINES. 2 HR. WALL NEEDS TO BE DIMENSIONED AS WELL. NEEDS PLANNING AND ZONING INFORMATION. FAXED TIM PERRY OF THESE NEEDS. PLANS IN MY HOLD BOX. KMM
|
Received Certificate of Value | | | 8/3/2000 | | DONE |
|
|
|
|
Application received | | | 8/3/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/3/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|