Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-02307
StatusFinaled
Name HAWKINS SMITH
Site Address 1951 S SATURN WAY
Project NameSPECTRUM VIEW BLDG 1
Customer Number 
ePlanReviewNo
Description
SPECTRUM VIEW OFFICE BUILDING #1 * TO CONSTRUCT A NEW 26,000 SQ. FT., ONE STORY, SHELL OFFICE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS AND STEEL ROOF JOISTS WITH METAL ROOF DECK. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR AREA INCREASE. NOTE: THIS BUILDING WILL HAVE A SPRINKLER SYSTEM DESIGNED FOR LIGHT HAZARD OCCUPANCIES ONLY. THIS SPRINKLER SYSTEM WILL LIMIT THIS BUILDING TO "B" OCCUPANCIES ONLY. SPRINKLER MODIFICATIONS WILL BE REQUIRED FOR OTHER PROPOSED OCCUPANCIES. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH00-00128/PC#636-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/6/2009 DONE
Case Summary (BLD)  7/10/2003  
Letter of compliance  10/4/2001 DONE
Letter of Compliance #20913 issued 10-4-01.
BLD-Final9/28/200110/1/200110/1/2001APASS
DetailsRuss Owen
Craig Hilldebrand, ###-####
Fee Review-notes8/3/20008/3/20006/26/2001 DONE
Temporary occupancy  6/26/2001 PART
Temp. Occ. Cert. #4562 issued 6-26-01 to Spectrum View.
FIRE-Final Inspection6/22/20016/25/20016/25/2001APASS
DetailsRick Jackson
Aaron ###-####
BLD-Final6/22/20016/25/20016/25/2001PFAIL
DetailsRuss Owen
aaron ###-#### achd has not signed the card. 6/25/2001 4:15:27 PM
FIRE-Alarm Testing6/20/20016/21/20016/21/2001PPASS
DetailsJoe Tawney
Alarm test OK 6/21/2001 3:39:14 PM
FIRE-Final Inspection6/20/20016/21/20016/21/2001PFAIL
DetailsJoe Tawney
Final fail C/N issued 6/21/2001 3:38:52 PM
BLD-Final6/20/20016/21/20016/21/2001PFAIL
DetailsJoe Tawney
Final Fail C/N issued 6/21/2001 3:39:44 PM
BLD-Conference6/20/20016/20/20016/20/2001 PASS
Status changed from exp to iss. No inspection activities listed. All special insp. reports must be provided to insp..
CHANGE STATUS TO (ISS)  6/20/2001 DONE
No structural inspections listed .All inspection reports must be provided to inspector.
(F) Reprint permit  11/20/2000 DONE
Issue PAID IN FULL permit  11/13/2000 DONE
Routing - PUBLIC WORKS9/18/2000 9/18/2000 PASS
Routing - PLAN CHECK9/18/2000 9/18/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/18/2000 PASS
Telephone call  9/18/2000 DONE
called Pat to pick up grading and shell ###-####
Inspection Record Card- Bld  9/18/2000 DONE
Print Occupancy Form  9/18/2000 DONE
Plan assigned to (JCM)8/11/2000 9/18/2000 PASS
DetailsJohn Menard
9/18/00 14:17:03 JCM - activity updated through activity BLDA022 from case BLD00-02307.
Routing - PUBLIC WORKS9/11/2000 9/13/2000 FAIL
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 9/13/00
Routing - PLAN CHECK8/31/2000 9/11/2000  
Plan resubmittals received  9/8/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LARSON ARCHITECTS, CORNEL LARSON, 3EACH REVISED DRAINAGE CACULATION AND 8 EACH REVISED CIVIL DRAWINGS, FORWARDED SAME TO JOHN MENARD. 9/8/00
Plan Reviewer's activity  9/5/2000 PASS
REVIEWED AND APPROVED REVISED STRUCTURAL PLANS AND CALCULATIONS. JCM
Plan resubmittals received  9/1/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS S-2, S-10 AND S-12 ROUTED TO JOHN M. KMM
Routing - FIRE8/24/20008/28/20008/30/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/30/2000 FAIL
PUBLIC WORKS
Plan resubmittals received  8/25/2000 PASS
RECEIVED A REVISED APPLICATION, FROM THE ARCHITECT OF RECORD, INDICATING THE PROPOSED CONSTRUCTION TYPE TO BE III-N. JCM
Plan resubmittals requested  8/25/2000  
FAXED CORNEL LARSON A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. JCM
Routing Off Site - STRUCTURAL8/11/2000 8/25/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Routing - PLAN CHECK8/23/2000 8/24/2000  
Plan resubmittals requested  8/24/2000  
FAXED CORNEL LARSON TO REQUEST CLARIFICATION ON THE PROPOSED CONSTRUCTION TYPE FOR THIS PROJECT. JCM
Routing - PLUMBING8/22/2000 8/23/2000 PASS
Routing - PUBLIC WORKS8/21/2000 8/23/2000 FAIL
FAILED REQUIRES DRAINAGE PLANS PER BRIAN MURPHY.
Routing - PLANNING8/21/2000 8/22/2000 PASS
Approved per DRH00-128.
Routing - PUBLIC WORKS8/14/2000 8/21/2000 FAIL
RECEIVED O & M PLAN
Plan routing begun/NEW & ADDTN  8/11/2000 DONE
WAS WAITING FOR O & M PLAN. WHICH I RECEIVED 8/14/00 KMM
Pending Assignment by JCM8/11/2000 8/11/2000 DONE
DetailsJohn Menard
8/11/00 08:52:41 KMM - activity updated through activity BLDA166 from case BLD00-02307.
Plans ACCEPTED BY PLAN TECH  8/11/2000 DONE
Received Certificate of Value  8/3/2000 DONE
Application received  8/3/2000  
Recd Pcfee & Taken To Pln CK     
Plan resubmittals received     
3 EA STRUCTURAL REVIEW COMMENTS 3 EACH S-3 S-11 P-1, P-3 M-1 M-2 M-3 M-4 M-5