Letter of compliance | | | 10/26/2000 | | DONE |
|
|
|
Letter of Compliance #19972 issued 10-26-00.
|
BLD-Final | 9/29/2000 | 10/3/2000 | 10/3/2000 | A | PASS |
Jim Storey
|
|
|
FN GIL ###-#### l/c ok card w/ contractor. 10/3/2000 11:37:34 AM
|
FIRE-Final Inspection | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Rick Jackson
|
|
|
FIRE FN GIL ###-#### will adjust door on Monday prior to structural inspection 9/29/2000 4:00:49 PM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PART |
|
|
|
Gil ###-#### please call before you go out so he can meet you out there for the basement walls only 8/23/00 8:26:14 AM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PART |
|
|
|
Gil ###-#### please call before you go out so he can meet you out there for the basement walls only 8/23/2000 1:42:33 PM
|
Issue PAID IN FULL permit | | | 8/8/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/7/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 8/4/2000 | 8/4/2000 | 8/4/2000 | | PASS |
Dan Stuart
|
|
|
8/4/2000 17:53:01 DRS - activity updated through activity BLDA022 from case BLD00-02311.
|
Routing - PLAN CHECK | 8/4/2000 | 8/4/2000 | 8/4/2000 | | PASS |
|
|
|
Approved as noted and attached. Pending fire code analysis for approval and issuance.
|
Routing - FIRE | 8/4/2000 | 8/4/2000 | 8/4/2000 | | PASS |
|
|
|
Reviewed scope of work with Bill Alexander. Condition noted on plan that fire inspector field review required as condition of permit and final approval. This has been done in an effort to speed up issuance of permit for project that can be field verified with support on questions from office review staff if necessary. drs
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2000 | | PASS |
|
|
|
Routing to permit desk for issuance.
|
Application received | | | 8/3/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/3/2000 | | |
|
|
|
Using previously approved architectural plans from the record vault per city policy. Red-lined on previously approved plans the proposed changes and Kathy Horton of Idaho Power Co. provided reference plans of a legible nature for assisting determination of scope of work and how it is to be done.
|
Meeting | | | 8/3/2000 | | |
|
|
|
Met with Bob Ross concerning plan submittal for quick permit process for Idaho Power Co. remodel of third floor print shop area increase and warehouse decrease. Told Bob a copy of the original approved plans from the records vault needs to be provided with each submittal as outlined in the Boise Policy Guidelines. I sent Bob to Records to obtain a copy of the original approved basement plan to verify same existing uses and for policy compliance. He returned with copy and plans were accepted. He also provided us with a letter from Kathy Horton, representing Idaho Power stating they would have full set of as-built plans for the entire building completed by December 31, 2000 to accompany the Record Vault approved plans to help in processing for permits in a quicker fashion.
|