Permit Information
Permit NumberBLD00-02318
StatusFinaled
Name STOLTZ MARKETING GROUP / KEN STOLTZ
Site Address 615 W MAIN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To add frame walls with sheetrock cover, within a 2,930 sq. ft. second story tenant space, to create a 60 square foot room to be used as a unisex accessible restroom; to use a corner for an approximate 34" by 34", 1-hour shaft from penetration of first level ceiling, through 2nd floor, through attic area and extend through roof to a minimum height equal to the curb height above roof that will support the future exhaust fan system to be used with future grease exhaust hood for future restaurant kitchen hood on first level and a 24" x 24" shaft for make up air for hood system. This area is in tight quarters and requires precise layout & construction to maintain all noted & required minimum clearances W/I the restroom for accessibility compliance. This permit does not include installation of the exhaust hood, exhaust duct system or make up air. Separate application, plan submitals, review, approval and permit is required. All per approved plans, notes & plan review comments attached. The scope of this work will be ongoing at same time as remodel and seismic structural retrofit code upgrade under BLD00-00758. PC#00-644/drs.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/9/2005  
Fee Review-notes8/4/20008/4/20005/9/2001 DONE
Letter of compliance  3/21/2001 DONE
Letter of Compliance #21370 issued 3-21-01.
BLD-Final3/20/20013/20/20013/20/2001PPART
DetailsCarl Dependahl
Harry ###-####, final ok this portion,( w/ BLD00-00758... has struct c/n on seismic, need report) 3/20/2001 4:18:35 PM
FIRE-Final Inspection3/13/20013/14/20013/13/2001ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/13/2001 at 13:25:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/13/2001 at 13:47:02.
BLD-Final3/9/20013/9/20013/9/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/9/2001 4:48:55 PM struct ok pend other finals
BLD-Framing/Rough-in3/9/20013/9/20013/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/9/2001 4:48:08 PM shaft ok
BLD-Conference2/27/20012/27/20012/27/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2001 12:12:47 PM w/ bldr...need eng's letter
BLD-Framing/Rough-in2/12/20012/13/20012/13/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/12/2001 at 13:25:35. Contact: ###-####...grease duct shaft 2/13/2001 4:07:41 PM
BLD-Framing/Rough-in2/12/20012/13/20012/13/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/12/2001 at 13:25:35. Contact: ###-####...grease duct shaft 2/13/2001 4:07:41 PM
BLD-Conference1/17/20011/17/20011/17/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/17/2001 3:06:58 PM w/contractor re plans
BLD-Conference1/10/20011/11/20011/11/2001APASS
DetailsCarl Dependahl
Harry ###-#### need signatures and eng's ok for final 1/11/2001 5:11:28 PM
BLD-Framing/Rough-in11/22/200011/24/200011/24/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/22/2000 at 16:01:33. Contact: ###-####. c/n issued, need eng's ok for seismic upgrades 11/24/2000 2:44:45 PM
BLD-Footing11/15/200011/15/200011/15/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/15/2000 at 10:33:56. Contact: ###-####. ftg at entry ok by mti. need eng's observation for diaphragms and connections 11/15/2000 2:17:10 PM
Issue PAID IN FULL permit  9/13/2000 DONE
Routing - PUBLIC WORKS8/16/20008/16/20008/18/2000 PASS
Plan assigned to (DRS)8/4/20008/4/20008/18/2000 PASS
DetailsDan Stuart
8/18/2000 09:54:53 DRS - activity updated through activity BLDA022 from case BLD00-02318.
Routing - PLAN CHECK8/18/2000 8/18/2000 PASS
TOOK TO DAN STUART. Approved as noted & attached. Routing to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  8/18/2000 PASS
Routing to issue permit
Inspection Record Card- Bld  8/18/2000 DONE
Print Occupancy Form  8/18/2000 DONE
Telephone call  8/18/2000 DONE
called Margie Kennedy at Armstrong Architects permit ready for pickup
Routing - PLAN CHECK8/16/20008/16/20008/16/2000 PEND
Resubmited plans okay. Routing to PW for determination of sewer use fee's if any.
Plan resubmittals received  8/15/2000  
New floor plans received showing adjustment of layout to meet currently adopted code for accessibility.
Telephone call  8/12/2000 DONE
Talked with Margie Kennedy, Armstrong Architect to review floor plan deficiencies with current code and let her know what she needed to do per section 104.2.8 UBC if she wanted to use alternate design. Margie said she had used the 1976 ANSI to design the restrooms. She would consider what action to take and either provide letter to Tim Hogland asking for approval as equivalent accessibility compliant plan or provide new design floor plan to meet current code.
Plan resubmittals received  8/11/2000  
New sheet A2.1 submitted. The plans indicate design per the 1998 ICC/ANSI which has not yet been adopted by Boise City. Margie will need to provide a written request to Tim Hogland provideing evidence of equivalence between her proposal to use the ICC/ANSI-98 instead of currently adopted CABO/ANSI-92 guidelines per section 104.2.8 - 'ALTERNATE MATERIALS, ALTERNATE DESIGN AND METHODS OF CONSTRUCTION', 1997 UBC or redesign FLOOR PLAN LAYOUT TO MEET CURRENT CODE.
Telephone call  8/10/2000 DONE
Call from Margie @ Armstrong Arch concerning reason for accessibility requirements for new restroom since there was no vertical access to the second floo. The code only gives exception to requirements for vertical access when the second floor is less than 3,000 sq. ft. in area. This space is listed as 2,930 sq. ft. so only access to areas on the second floor are required. Margie will resubmit.
Routing - PLAN CHECK8/4/20008/4/20008/4/2000 FAIL
Plans submitted for permit to install new restroom on the second floor wher rejected for review to to lack of accessiblity compliance of the unisex restroom. Architect to redraw & submit new layout plan showing compliance.
Plan assigned to (MYS)8/4/20008/4/20008/4/2000 DONE
DetailsMarlene Southard
Application received  8/4/2000  
Recd Pcfee & Taken To Pln CK  8/4/2000 DONE
Meeting  8/4/2000 FAIL
DetailsDan Stuart
Met with Jason Band, Armstrong Architects to review plan submittal for additional restroom on the second level. Plans were incomplete in that they did not meet accessibility requirements. Jason took plans back to redraw and resubmit.