Case Summary (BLD) | | | 12/9/2005 | | |
|
|
|
|
Fee Review-notes | 8/4/2000 | 8/4/2000 | 5/9/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 3/21/2001 | | DONE |
|
|
|
Letter of Compliance #21370 issued 3-21-01.
|
BLD-Final | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | PART |
Carl Dependahl
|
|
|
Harry ###-####, final ok this portion,( w/ BLD00-00758... has struct c/n on seismic, need report) 3/20/2001 4:18:35 PM
|
FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/13/2001 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 13:25:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/13/2001 at 13:47:02.
|
BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/9/2001 4:48:55 PM struct ok pend other finals
|
BLD-Framing/Rough-in | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/9/2001 4:48:08 PM shaft ok
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/27/2001 12:12:47 PM w/ bldr...need eng's letter
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 13:25:35. Contact: ###-####...grease duct shaft 2/13/2001 4:07:41 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 13:25:35. Contact: ###-####...grease duct shaft 2/13/2001 4:07:41 PM
|
BLD-Conference | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/17/2001 3:06:58 PM w/contractor re plans
|
BLD-Conference | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PASS |
Carl Dependahl
|
|
|
Harry ###-#### need signatures and eng's ok for final 1/11/2001 5:11:28 PM
|
BLD-Framing/Rough-in | 11/22/2000 | 11/24/2000 | 11/24/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 16:01:33. Contact: ###-####. c/n issued, need eng's ok for seismic upgrades 11/24/2000 2:44:45 PM
|
BLD-Footing | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 10:33:56. Contact: ###-####. ftg at entry ok by mti. need eng's observation for diaphragms and connections 11/15/2000 2:17:10 PM
|
Issue PAID IN FULL permit | | | 9/13/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/16/2000 | 8/16/2000 | 8/18/2000 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 8/4/2000 | 8/4/2000 | 8/18/2000 | | PASS |
Dan Stuart
|
|
|
8/18/2000 09:54:53 DRS - activity updated through activity BLDA022 from case BLD00-02318.
|
Routing - PLAN CHECK | 8/18/2000 | | 8/18/2000 | | PASS |
|
|
|
TOOK TO DAN STUART. Approved as noted & attached. Routing to permit desk for issuance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2000 | | PASS |
|
|
|
Routing to issue permit
|
Inspection Record Card- Bld | | | 8/18/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/18/2000 | | DONE |
|
|
|
|
Telephone call | | | 8/18/2000 | | DONE |
|
|
|
called Margie Kennedy at Armstrong Architects permit ready for pickup
|
Routing - PLAN CHECK | 8/16/2000 | 8/16/2000 | 8/16/2000 | | PEND |
|
|
|
Resubmited plans okay. Routing to PW for determination of sewer use fee's if any.
|
Plan resubmittals received | | | 8/15/2000 | | |
|
|
|
New floor plans received showing adjustment of layout to meet currently adopted code for accessibility.
|
Telephone call | | | 8/12/2000 | | DONE |
|
|
|
Talked with Margie Kennedy, Armstrong Architect to review floor plan deficiencies with current code and let her know what she needed to do per section 104.2.8 UBC if she wanted to use alternate design. Margie said she had used the 1976 ANSI to design the restrooms. She would consider what action to take and either provide letter to Tim Hogland asking for approval as equivalent accessibility compliant plan or provide new design floor plan to meet current code.
|
Plan resubmittals received | | | 8/11/2000 | | |
|
|
|
New sheet A2.1 submitted. The plans indicate design per the 1998 ICC/ANSI which has not yet been adopted by Boise City. Margie will need to provide a written request to Tim Hogland provideing evidence of equivalence between her proposal to use the ICC/ANSI-98 instead of currently adopted CABO/ANSI-92 guidelines per section 104.2.8 - 'ALTERNATE MATERIALS, ALTERNATE DESIGN AND METHODS OF CONSTRUCTION', 1997 UBC or redesign FLOOR PLAN LAYOUT TO MEET CURRENT CODE.
|
Telephone call | | | 8/10/2000 | | DONE |
|
|
|
Call from Margie @ Armstrong Arch concerning reason for accessibility requirements for new restroom since there was no vertical access to the second floo. The code only gives exception to requirements for vertical access when the second floor is less than 3,000 sq. ft. in area. This space is listed as 2,930 sq. ft. so only access to areas on the second floor are required. Margie will resubmit.
|
Routing - PLAN CHECK | 8/4/2000 | 8/4/2000 | 8/4/2000 | | FAIL |
|
|
|
Plans submitted for permit to install new restroom on the second floor wher rejected for review to to lack of accessiblity compliance of the unisex restroom. Architect to redraw & submit new layout plan showing compliance.
|
Plan assigned to (MYS) | 8/4/2000 | 8/4/2000 | 8/4/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 8/4/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/4/2000 | | DONE |
|
|
|
|
Meeting | | | 8/4/2000 | | FAIL |
Dan Stuart
|
|
|
Met with Jason Band, Armstrong Architects to review plan submittal for additional restroom on the second level. Plans were incomplete in that they did not meet accessibility requirements. Jason took plans back to redraw and resubmit.
|