Case Summary (BLD) | | | 6/7/2005 | | |
|
|
|
|
Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/12/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8717 issued 6-12-01 to Riders Bar & Grill.
|
BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PASS |
Carl Dependahl
|
|
|
Final - Joe, ###-####, c/n ok 6/11/2001 4:35:48 PM
|
Permanent Occupancy | | 6/11/2001 | 6/11/2001 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 6/7/2001 | | PASS |
|
|
|
Inspected today and passed.
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/8/2001 8:26:24 AM w/ Jim re c/n
|
BLD-Conference | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/7/2001 2:01:47 PM w/ owner, need p&z to approve ext or landscape changes
|
Fee Review-notes | 8/8/2000 | 8/8/2000 | 4/25/2001 | | DONE |
|
|
|
|
BLD-Final | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
fn-- vicky ###-#### , c/n, door hdwe, other finals, complete landscape, etc...ok for t/o 4/16/2001 6:11:35 PM
|
FIRE-Final Inspection | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Cancel should be 409 4/17/2001 8:34:13 AM
|
BLD-Conference | 4/16/2001 | 4/16/2001 | 4/16/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/16/2001 11:18:20 AM w/ owner re final req's
|
FIRE-Final Inspection | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 4/16/2001 2:35:57 PM
|
Temporary occupancy | | | 4/16/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4537 issued 4-16-01 to Riders Bar & Grill.
|
BLD-Final | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/2/2001 4:52:08 PM ok to cover....may req scuttle & ladder to roof units, location to be figured.
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/1/2001 1:48:44 PM w/ owner: recall for shaft,& col. reinsp
|
BLD-Framing/Rough-in | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; verbal c/n to add2 studs at ea. int brg point for girder trusses; begin/complete 1hr shaft, obtain complete hvac r/i; ok to rock ext walls only 2/27/2001 12:10:22 PM
|
BLD-Energy code compliance | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### insul installed 2/27/2001 12:10:44 PM
|
BLD-Framing/Rough-in | 2/26/2001 | 2/26/2001 | 2/27/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### conf only 2/27/2001 12:11:04 PM
|
BLD-Energy code compliance | 2/26/2001 | 2/26/2001 | 2/27/2001 | P | NR |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | PART |
Carl Dependahl
|
|
|
FR INSP VICKY ###-#### ; ok to insul ext walls only; need complete shaft, etc. 2/26/2001 10:47:14 AM
|
BLD-Energy code compliance | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | NR |
Carl Dependahl
|
|
|
VICKY ###-#### ENERGY CODE INSP
|
BLD-Framing/Rough-in | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | NR |
Tom Arcoraci
|
|
|
###-#### no truss eng 2/22/2001 4:17:53 PM
|
BLD-Conference | 2/21/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/21/2001 9:11:48 AM w/ Western htg re smoke/fire dampers req'd
|
BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/20/2001 11:06:16 AM w/ owner re insulation at hvac
|
BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 11:04:40 AM keep c/n, coil strap installed at south side roof...wip
|
BLD-Conference | 2/6/2001 | 2/6/2001 | 2/6/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 10:29:09 AM magna wall stucco ok for 1hr ext per NER
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | FAIL |
Carl Dependahl
|
|
|
joe ###-#### shear nail, c/n; coil straps at roof, install hd's as req 2/5/2001 5:10:12 PM d 2/5/2001 5:10:17 PM
|
BLD-Conference | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 16:26:32. Contact: ###-####.w/ owner re firew 1/25/2001 12:00:13 PM alls 1/25/2001 12:00:18 PM
|
BLD-Footing | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PART |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 08:48:46. Contact: .isolated col ftgs 12/7/2000 3:49:32 PM
|
BLD-Foundation | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; fnd ok 12/7/2000 3:49:09 PM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | NR |
Carl Dependahl
|
|
|
joe ###-#### rebar not a frame 11/29/2000 12:36:35 PM
|
BLD-Concrete | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/29/2000 12:37:28 PM ftgs, pend soils report (MTI?)
|
BLD-Conference | 11/20/2000 | 11/20/2000 | 11/20/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/20/2000 10:30:18 AM w/ owner re ryder's bar ...has fire walls to avoid sprinkling bldg
|
(F) Reprint permit | | | 11/6/2000 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 11/3/2000 | 11/3/2000 | 11/3/2000 | | DONE |
|
|
|
Impact fee certificate #00-010843 paid on 10/11/00-$13,231.00-mps
|
Issue PAID IN FULL permit | | | 11/3/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/2/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2000 | | DONE |
|
|
|
called permit ready fees due and need ACHD
|
Plan assigned to (MLO) | 8/11/2000 | | 11/2/2000 | | PASS |
Mike Otto
|
|
|
11/2/2000 14:29:08 MLO - activity updated through activity BLDA022 from case BLD00-02347.
|
Routing - FIRE | 11/1/2000 | 11/1/2000 | 11/1/2000 | | PASS |
Bill Alexander
|
|
|
routed back to fire for sprinkler system has been deleted.
|
Routing - PLAN CHECK | 10/30/2000 | | 11/1/2000 | | PASS |
|
|
|
|
Routing - FIRE | 10/25/2000 | 10/30/2000 | 10/30/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLUMBING | 10/18/2000 | | 10/20/2000 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/11/2000 | | 10/19/2000 | | PASS |
|
|
|
SENT STRUCTURAL ENGINEERING VIA PDQ TO CONSULTANTING ENGINEER. 10/11/00 DAR
|
Routing - PLAN CHECK | 10/13/2000 | | 10/18/2000 | | |
|
|
|
Received resubmittals and routed to plumbing and fire.
|
Plan resubmittals received | | | 10/17/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF SHEET A-1, A-3, A-9.1, M-1, FOR MIKE O.
THREE COPIES OF REVISED SHEET A-1, FOR SAM ROGERS, AND THREE COPIES OF REVISED SHEET M-2. ROUTED ALL TO MIKE O. KMM
10/18/2000-Put all resubmittals in plans and routed to Plumbing and Fire. (mys)
|
Routing - PLUMBING | 10/12/2000 | | 10/13/2000 | | FAIL |
|
|
|
provide sizing information for all waste, vent, and water piping for this project, if the waste and vent system serving the bar area is a combination waste and vent system toilets are prohibited, provide a fixture schedule listing water and waste requirements, please provide a plan addressing marked items above.
|
Plan resubmittals received | | | 10/10/2000 | | DONE |
|
|
|
RECEIVED THREE SETS OF RESUBMITTALS AND THREE SETS OF STRUCTURAL CACULATIONS FROM PINNACLE ENGINEERS, FORWARDED SAME TO MIKE OTTO. 10/10/00 DAR
|
Routing - PUBLIC WORKS | 10/5/2000 | | 10/5/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/21/2000 | | 9/29/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN COVERING ROOF RUN OFF PER BRIAN MURPHY. 9/29/00 DAR
|
Routing - PLANNING | 9/19/2000 | | 9/21/2000 | | PASS |
|
|
|
Approve per conditions of DRH00-47 and as noted on the plans regarding landscaping, one-way arrow/sign posted for the driveway on the north side of the building and "right turn" only sign at the intersection of the driveway with vacated 17th street. Also see letter to Joe Gipson under DRH00-47.
|
Plan Review Completed(1st rev) | | | 9/19/2000 | | FAIL |
|
|
|
failed bldg and fire reviews plans returned to plan check
|
Routing - FIRE | 9/12/2000 | | 9/19/2000 | | FAIL |
|
|
|
DAVE ROUTE TO PW WHEN BACK FROM FIRE. KMM
|
Routing - PLAN CHECK | 9/11/2000 | | 9/12/2000 | | FAIL |
|
|
|
|
Routing - PLUMBING | 8/28/2000 | | 9/11/2000 | | FAIL |
|
|
|
requires pw pretreatment approval prior to review
|
Routing - PUBLIC WORKS | 8/28/2000 | | 8/28/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN (ROOF RUN OFF 1/2
|
Routing - PLANNING | 8/21/2000 | | 8/28/2000 | | FAIL |
|
|
|
Still need information submitted per Design Review approval (DRH00-47).
|
Routing Off Site - STRUCTURAL | 8/14/2000 | | 8/25/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED TO ARCHITECT.
|
Plan resubmittals requested | | | 8/25/2000 | | FAIL |
|
|
|
STRUCTRUAL CORRECTIONS
|
Routing - PUBLIC WORKS | 8/11/2000 | | 8/21/2000 | | FAIL |
|
|
|
FAILED BY BRIAN M. REQUIRES DRAINAGE PLAN JIM RICH PROOF OF LEGAN LAND DIV. AND JOHN JOHNSON SEWER RELOCATION PLAN TO BE INCLUDED WITH THIS SET.
|
Plan routing begun/NEW & ADDTN | | | 8/11/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2000 | | DONE |
|
|
|
THIS PERMIT INCLUDES ALL BUILDINGS PER JOHN M. KMM
|
Pending Assignment by MYS | 8/8/2000 | | 8/11/2000 | | DONE |
Marlene Southard
|
|
|
8/11/00 16:05:19 JCM - activity updated through activity BLDA174 from case BLD00-02347.
|
Received Certificate of Value | | | 8/8/2000 | | DONE |
|
|
|
|
Application received | | | 8/8/2000 | | |
|
|
|
|