Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02392
StatusFinaled
Name TRINITY HOMES
Site Address 2739 N LAKEHARBOR LN
Project NameFLOODWAY
Customer Number890-5697
ePlanReviewNo
Description
To construct a 4397 sq. ft. two story single family dwelling (2400 sq. ft. first floor/1997 sq. ft. second floor) with a attached 1093 sq. ft. three car garage, 1128 sq. ft. of deck and 279 sq. ft. of porches. Per approved plans, engineering and requirement list. This is a shade restricted lot. CU-157-92 per Angie Brosious. JIM WYLLIE APPROVED. This is not located within the regulatory flood zone and technically does not have to comply with provisions of the Boise City Floodplain Ordinance, BUT he does have RECOMMENDATIONS ATTACHED. PC#725 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/28/20013/28/20013/28/2001PPASS
DetailsTony Young
fn occ-- joe-- ###-####
c of c#20318 issued 3/28/2001 4:54:50 PM
DOC - Permit Finaled3/28/20013/28/20013/28/2001PPASS
DetailsTony Young
Added by Inspector: 415 On 3/28/2001 4:55:11 PM
BLD-Final3/22/20013/23/20013/23/2001PFAIL
DetailsTony Young
###-####
c/n posted 10 items 3/23/2001 3:44:29 PM
BLD-Framing/Rough-in12/29/200012/29/200012/29/2000PNR
DetailsSteven Webb
shear ###-#### c/n issued, call for re-inspection with inspector 415 12/29/2000 1:46:54 PM
BLD-Framing/Rough-in11/27/200011/28/200011/28/2000APASS
DetailsTony Young
Scheduled by Inspector: 415 On 11/27/2000 12:00:57 PM
BLD-Energy code compliance11/27/200011/28/200011/28/2000APASS
DetailsTony Young
Scheduled by Inspector: 415 On 11/27/2000 12:01:31 PM
BLD-Framing/Rough-in11/24/200011/27/200011/27/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/24/2000 at 13:38:13. Contact: ###-####.
c/n posted, fireblocks, straps, int shear.
exterior nailing ok, need 2nd story straps 11/27/2000 12:02:44 PM
BLD-Framing/Rough-in11/21/200011/22/200011/22/2000AFAIL
DetailsTony Young
FR JOE -- ###-#### gate * 2684 11/22/2000 10:20:39 AM
c/n posted, uncover all structural componets for inspection, already insulated and partialy rocked, no inspection made 11/22/2000 10:59:23 AM
Plan assigned to (SAM)9/11/2000 9/15/2000 PASS
DetailsSteve Munroe
9/15/2000 09:40:59 SAM - activity updated through activity BLDA022 from case BLD00-02392.
PLANS/APPL TAKEN TO FRONT DESK  9/15/2000 DONE
Inspection Record Card- Bld  9/15/2000 DONE
Telephone call  9/15/2000 DONE
called
Issue PAID IN FULL permit  9/15/2000 DONE
BLD-Foundation9/11/20009/12/20009/12/2000PPART
DetailsTony Young
Randy ###-####
wip ...ok 9/12/2000 4:18:38 PM
BLD-Footing9/11/20009/11/20009/11/2000PPART
DetailsTony Young
###-####
appears ok ,,,wip 9/11/2000 2:46:29 PM
BLD-Footing8/25/20008/25/20008/25/2000PFAIL
DetailsTony Young
###-####
old dump area in back of hole, need soil engineering b-4 pouring mud. no prperty pins visible, no forms on job. 8/25/2000 12:48:45 PM
Routing - PUBLIC WORKS8/10/20008/14/20008/17/2000 PASS
Routing - PLANNING8/10/20008/14/20008/15/2000 PASS
Application received  8/10/2000  
Routing - PLAN CHECK8/17/20008/17/2000  PEND
Routing - PUBLIC WORKS8/10/20008/10/2000  PASS
TOOK TO JIM WYLIE FOR A COND.letter attached with cond.pe
Early Start Permit    PEND
early start
Case Summary (BLD)     
Plan Review Report