Case Summary (BLD) | | | 11/22/2004 | | |
|
|
|
|
Permanent occupancy | | | 8/28/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8801 issued 8-28-01 to Night Moves Entertainment.
|
Permanent Occupancy | | 8/27/2001 | 8/27/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/15/2001 | | DONE |
|
|
|
Talked with Colleen Heaton (owner) and balance of landscaping should be completed by 6-18-01.
|
Telephone call | | | 5/21/2001 | | DONE |
|
|
|
Talked w/Jerry re: status of temp. occ. - ###-#### - he will call owner
|
Fee Review-notes | 10/23/2000 | 10/23/2000 | 3/19/2001 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 3/19/2001 | | FAIL |
|
|
|
Bonded for temporary - still need landscaping completed.
|
BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Tony Young
|
|
|
Laurie ###-####
temp. occ. ok untill trades are signed off 3/16/2001 3:30:14 PM
|
FIRE-Final Inspection | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Joe Tawney
|
|
|
early am ###-#### Reinsp OK for permanant occupancy 3/19/2001 8:03:44 AM
|
Temporary occupancy | | | 3/16/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4526 issued 3-16-01 to Night Moves Entertainment.
|
FIRE-Final Inspection | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Reschedule 3/16/2001 8:19:19 AM
|
FIRE-Final Inspection | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 3/15/2001 8:15:59 AM
|
BLD-Final | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 09:57:02. Contact: ###-####.
need trades signed off 3/14/2001 2:47:33 PM
|
BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Tony Young
|
|
|
FOR CONFERENCE--- JERRY ###-#### OR ###-#### -CALL 1ST BEFORE INSP
conf. w/ Bob A on final and plan changes, bathroom, roof vents, exit signs,ADA regs., etc. 3/8/2001 4:34:55 PM
|
BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Tony Young
|
|
|
Conference on attic ventilation requirements, required ADA restroom requirements, and exit light requirements at main entrance.
|
BLD-Conference | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 17:23:45. Contact: ###-####.
conf. on final w/ Joe Tawney various issues 2/27/2001 11:39:02 AM
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 2/27/2001 1:30:24 PM Conf with Tony Young and bldg occupants reg fire and life safety issues
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 08:35:43. Contact: ###-####.
interior walls in rear ok to cover 2/6/2001 4:03:55 PM
|
BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 | P | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 2/2/2001 4:09:50 PM
|
BLD-Framing/Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:50:33. Contact: ###-####.
ok to cover part of int. wall in rear 2/5/2001 8:37:34 AM
|
BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 10:58:34. Contact: ###-####.
roof crickets ok 1/25/2001 11:42:26 AM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 09:09:31. Contact: ###-####.
2 hr parapet wall framing ok on east side 1/9/2001 9:21:20 AM
|
BLD-Other | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 10:09:26. Contact: .
int.door frame cut into masonary wall, already done 1/8/2001 2:10:50 PM
|
Plan resubmittals received | | | 1/4/2001 | | DONE |
|
|
|
Received a letter from Night Moves Entertainment, Inc. Routed one copy to Tony Young, one to Carl W. and one to Marlene. KMM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 09:15:33. Contact: ###-####.
game room, dressing room and storage room ok to cover 11/28/2000 2:26:53 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/24/2000 | 11/24/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:45:09. Contact: ###-####.
c/n posted, need to verify elec. signoff 11/24/2000 2:22:05 PM
|
Plan resubmittals received | | | 11/15/2000 | | DONE |
|
|
|
Received two copies of revised sheets A1, GRD 1 of 2 from John Cook. Routed to Tony Young. KMM
|
Issue PAID IN FULL permit | | | 10/24/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/23/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/23/2000 | | DONE |
|
|
|
told them we need to have achd before picking up permit
|
Routing - PLAN CHECK | 10/3/2000 | | 10/23/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/23/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2000 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 8/28/2000 | | 10/23/2000 | | PASS |
Carl Westfall
|
|
|
10/23/00 14:48:53 CJW - activity updated through activity BLDA022 from case BLD00-02420.
|
Plan resubmittals received | | | 10/17/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS COVER, A2, A3, A4. ROUTED TO CARL W. KMM
|
Routing - FIRE | 10/3/2000 | 10/3/2000 | 10/3/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 9/28/2000 | | 10/3/2000 | | |
|
|
|
|
Routing - FIRE | 9/25/2000 | | 9/28/2000 | | |
Bill Alexander
|
|
|
Lack water supply certification.
|
Plan Review Completed(1st rev) | | | 9/28/2000 | | |
|
|
|
Failed first UBC and UFC review.
|
Routing - PLAN CHECK | 9/21/2000 | | 9/25/2000 | | |
|
|
|
First UBC plan review failed.
|
Plan Reviewer's activity | | | 9/23/2000 | | |
|
|
|
UBC plan review started on the building Saturday September 23, 2000 and finished September 25, 2000. A response from the architect was required. See the conditions list.
|
Routing - PLUMBING | 9/12/2000 | | 9/18/2000 | | PASS |
|
|
|
see bld00-02465 for review comments
|
Plan resubmittals received | | | 9/14/2000 | | DONE |
|
|
|
RECEIVED FIVE COPIES OF REVISED SHEET GRD 1 OF 2. SCOTT S. SAID HE WAS OK WITH IT AND DIDI NOT NEED TO REVIEW. HAD TERRY RECORDS LOOK AT AND HE SIGNED OFF. PUT PLANS BACK IN PLUMBING. KMM
|
Routing - PUBLIC WORKS | 9/7/2000 | | 9/11/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 9/11/2000 | | 9/11/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/7/2000 | | DONE |
|
|
|
RECEIVED FIVE COPIES OF REVISED A1 AND L1 SHEETS. ONE COPY OF LETTER. KMM
|
Routing - PLUMBING | 8/31/2000 | | 9/7/2000 | | |
|
|
|
Failed first review. TOOK PLANS FROM PLUMB. RESUBS RECEIVED. REROUTED PLANS. KMM
|
Routing - PUBLIC WORKS | 8/28/2000 | | 8/31/2000 | | |
|
|
|
Failed first review.
|
Routing - PLANNING | 8/30/2000 | | 8/31/2000 | | |
|
|
|
Failed first review. Site plan and landscape plan have not been modified to reflect the drainage pond which is to be built in the northeast corner of the parking lot. Revised plans, showing adequate parking, are required.
|
Plan routing begun/TENANTS | | | 8/28/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE. Approved by Bud Fulleton, Central District Health, on 8-25-00.
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2000 | | DONE |
|
|
|
THERE IS A PARKING LOT ROUTING WITH THIS PROJECT. UNDER BLD00-02465. KMM
|
Meeting | | | 8/22/2000 | | DONE |
|
|
|
JOHN COOK CAME IN AND TOOK PLANS TO ACCOMMODATE CDH'S REQUIREMENTS. PER CAROL JOHNSON KMM
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2000 | | HOLD |
|
|
|
GAVE BUD FULETON A CALL. HE IS MEETING WITH MR. ADAMSON ON 8-21-00. IF HE OKS PROJECT HE WILL GIVE CAROL A CALL SO SHE CAN SIGN OFF ON PLANS TUESDAY 8/22 OR 8/24. KMM
|
Received Certificate of Value | | | 8/14/2000 | | DONE |
|
|
|
|
Application received | | | 8/14/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 8/14/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/14/2000 | | DONE |
|
|
|
|