Fee Review-notes | 6/27/2003 | 6/27/2003 | 6/27/2003 | | DONE |
|
|
|
Additional values from subcontractors.
7/9/03--
|
Permanent Occupancy | | 4/18/2001 | 4/18/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/18/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8636 issued 4-18-01 to the Vista Inn Best Western (addn.)
|
Code Occupancy Approval | | | 3/21/2001 | | PASS |
|
|
|
ALL CONDITIONS AND LANDSCAPE HAVE BEEN INSTALLED, FINAL OCCUPANCY SIGNED OFF.
|
BLD-Final | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | PART |
Jim Storey
|
|
|
Stan ###-#### temp ok pendig plm sign off for perm. 3/20/2001 5:36:51 PM
|
FIRE-Final Inspection | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PASS |
Rick Jackson
|
|
|
Stan Wiggins ###-####
|
BLD-Final | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | FAIL |
Jim Storey
|
|
|
fn --stan-- ###-#### door hardware adjustment/ada signage and protection/ occ load sign. 3/19/2001 4:04:44 PM
|
FIRE-Final Inspection | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | NR |
Rick Jackson
|
|
|
Stan ###-#### contractor called and said he rated door in the two hour wall isn't complete and will schedule for next week 3/16/2001 3:07:20 PM
|
BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | NR |
Jim Storey
|
|
|
after 1:00\\###-####
|
FIRE-Final Inspection | 3/14/2001 | 3/14/2001 | 3/14/2001 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/14/2001 10:22:57 AM raed doors not complete; exinguishers; alarm problems
|
BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | NR |
Carl Dependahl
|
|
|
left msg...unable to contact 3/6/2001 4:23:53 PM
|
BLD-Framing/Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | NH |
Jim Storey
|
|
|
###-####
|
FIRE-Sprinkler Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/26/2001 3:19:20 PM okay to cover
|
Plan resubmittals received | | | 2/14/2001 | | DONE |
|
|
|
Received two copies of revised sheet M-1. Routed to Dave Lightfoot. KMM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Jim Storey
|
|
|
Stan Wiggins ###-####
|
BLD-Framing/Rough-in | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 08:49:38. Contact: ###-####. drinking foutian requied/ele boxe back to back/two layer must turn at door assembly/fire stop above bathroom hard ceillings for penatrations in tunnel corridor/ pending all other insp aprovals call for reinsp for idems listed. 2/7/2001 5:15:36 PM
|
BLD-Framing/Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Jim Storey
|
|
|
###-#### c/n to reinsp. sheer attchment on east and west bearing walls 6/12 pattern spec.. 1/23/2001 9:32:20 AM
|
BLD-Framing/Rough-in | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Storey
|
|
|
Stan ###-#### exterior sheer ok for cover. 1/23/2001 2:47:22 PM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Jim Storey
|
|
|
PARTIAL FRAM\\###-#### need to relocate ramp landing per plan at 2 hr doors. 1/17/2001 2:55:52 PM
|
BLD-Footing | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Jim Storey
|
|
|
Stan Wiggins ###-#### rebar ok pending special insp./ need engineering doc for sheer wall design at holddowns. 12/20/2000 11:28:29 AM
|
Print Occupancy Form | | | 11/6/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/6/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/6/2000 | | DONE |
|
|
|
called permit ready and fees due and need ACHD
|
Issue PAID IN FULL permit | | | 11/6/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/3/2000 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/3/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/3/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 8/21/2000 | | 11/3/2000 | | PASS |
Mike Phillips
|
|
|
11/3/2000 15:01:28 M_P - activity updated through activity BLDA022 from case BLD00-02437.
|
Plan resubmittals received | | | 10/30/2000 | | DONE |
|
|
|
RECEIVED PLAN RESIBMITTALS FROM ZGA ARCHITECTS,WES EDWARDS,TWO SETS AND SMALL DOCUMENTS. 10/30/00 DAR
|
Plan Review Completed(1st rev) | | | 10/23/2000 | | FAIL |
|
|
|
failed bldg review
|
Routing - FIRE | 10/18/2000 | | 10/23/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/5/2000 | | 10/18/2000 | | |
|
|
|
ROUTING TO FIRE
|
Plan Reviewer's activity | | | 10/18/2000 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUIRED FOR FOLLOW UP REVIEW, PRIOR TO ISSUING PERMIT.
|
Additional plans submitted | | | 10/16/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF GEOTECHNICAL ENGINEERING STUDY. ROUTED TO MIKE P. KMM
|
Routing - PUBLIC WORKS | 10/3/2000 | | 10/5/2000 | | PASS |
|
|
|
Review lot line and property discription.
|
Routing - PLAN CHECK | 9/12/2000 | | 10/3/2000 | | |
|
|
|
Routed to P.W. for review of lot lines.
|
Plan resubmittals received | | | 10/2/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, WESCOTT EDWARDS. TWO SETS OF SHEETS G0.1, A1.1 A2.1, A4.1, A8.1, FORWARDED SAME TO MIKE PHILLIPS. 10/2/00 DAR
|
Plan Reviewer's activity | | | 9/25/2000 | | HOLD |
|
|
|
Building crossing property line and crossing Area Separation wall. Need to now what fire sprinklers are being used for in this section of the building to. Waiting for architect to resubmit plans reflecting these requirements corrected. This must be done prior to review.
|
Routing - PLUMBING | 9/8/2000 | | 9/12/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 9/7/2000 | | 9/8/2000 | | PASS |
|
|
|
Approved per DRH00-124, and as noted on sheet A1.1 (for additional street trees per Community Forestry).
|
Routing - PUBLIC WORKS | 9/1/2000 | | 9/7/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2000 | | DONE |
|
|
|
STILL MISSING DRAINAGE CALCS. BUT WILL STILL ROUTE TO BRIAN M. KMM
|
Plan routing begun/NEW & ADDTN | | | 9/1/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/21/2000 | | HOLD |
|
|
|
PLANS ON HOLD. REQUIRES 1. O & M MANUEL 2. DRAINAGE CALCS.
3. LEGAL DESCRIPTION
|
Plan routing begun/NEW & ADDTN | | | 8/21/2000 | | HOLD |
|
|
|
REQUIRES O & M MANUEL AND DRAINAGE CALCS. LEGAL DESCRIPTION
8/22/00 RECEIVED LEGAL DESCRIPTION. KMM
|
Application received | | | 8/16/2000 | | |
|
|
|
|
Received Certificate of Value | | | 8/16/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Routing - PLAN CHECK | 10/23/2000 | | | | |
|
|
|
|