Permit Information
Permit NumberBLD00-02474
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 8455 W WESTPARK ST
Project NameSCP GLOBAL TECH
Customer Number2K009
ePlanReviewNo
Description
* SCP GLOBAL TECHNOLOGIES OFFICE ADDITION, DRH00-00076 AND DRH00-00136* To construct a two story, V-N, office addition based on occupancy groups, fully sprinkled, 60 feet all around, unlimited area building. Work to include: reinforced concrete footings, foundation, columns, floor slabs, & exterior elements; structural steel columns, beams & GLB; framed walls, shear walls, floor & roof systems; interior finishes, elevator, stairs, electrical, plumbing, mechanical, sprinkler & alarm systems; to create office's, conference rooms, locker room & breakroom; accessibility requirements; and Zoning / Public Works conditions; all per approved plans, notes on plans & plan review comments attached to approved plans as part thereof. NOTE: THIS BUILDING IS FULLY SPRINKLED FOR ALLOWABLE AREA INCREASE. PC#00-710 / DRS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/30/20036/30/20036/30/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 6/26/20016/26/2001 DONE
Details
BLD-Final6/26/20016/26/20016/26/2001 PASS
DetailsRuss Owen
Final/ok to issue perm. occ.
Permanent occupancy  6/26/2001 DONE
Perm. Occ. Cert. #8731 issued 6-26-01 to SCP Global Technologies.
FIRE-Final Inspection6/22/20016/22/20016/22/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/22/2001 8:57:52 AM
Temporary occupancy  5/23/2001 PART
Temp. Occ. Cert. #4548 issued 5-23-01 to SCP Global Technologies.
BLD-Final5/18/20015/21/20015/21/2001APART
DetailsRuss Owen
guardrails have been completed ,need the final letter from s-i and efis contractor and signatures for final. 12/21/2001 11:04:18 AM
BLD-Final5/16/20015/17/20015/17/2001PPART
DetailsRuss Owen
temp occ Ted ###-#### ok temp oc,need final letter for s-i and efis system, guardrail.at front. and all other signature. 12/17/2001 5:39:14 PM
FIRE-Final Inspection5/14/20015/15/20015/15/2001PPART
DetailsJoe Tawney
Ted Parrott ###-#### Final OK for temporary occupancy. Remaining items exc FACP to be completed within 2 to 3 days 5/15/2001 3:46:41 PM
FIRE-Final Inspection5/9/20015/10/20015/10/2001PFAIL
DetailsJoe Tawney
###-#### Final Fail Alarm system 5/10/2001 2:28:05 PM
BLD-Framing/Rough-in5/4/20015/7/20015/7/2001APART
DetailsRuss Owen
handrail ted ###-#### laft stairway at front face has cooetions,also left ramp req handrails or architect to submit. 12/7/2001 12:01:23 PM
BLD-Framing/Rough-in4/23/20014/24/20014/24/2001APART
DetailsRuss Owen
ceiling ted ###-#### ok to install ceiling grid, noted ext handrails not incompliance,also need approved ext wall cover for studs at 24 oc as per plans. 11/24/2001 1:59:29 PM
BLD-Framing/Rough-in4/2/20014/3/20014/3/2001APART
DetailsRuss Owen
Ted Parrot ###-#### complete upper floor lights and lower floor adnl pods. 4/3/2001 12:42:39 PM
BLD-Framing/Rough-in3/1/20013/1/20013/1/2001PPASS
DetailsRuss Owen
###-####corrections made and verified by pinacle,project engineer.ok to sheetrock.exterior parapet still requires addnl anchorage. 3/1/2001 5:36:00 PM
BLD-Framing/Rough-in2/21/20012/22/20012/22/2001APART
DetailsRuss Owen
###-####meet with framer will ,correct items and recall. 2/22/2001 12:22:35 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001AFAIL
DetailsRuss Owen
###-####,will meet with framer am. to go over c/n. 2/21/2001 1:54:36 PM
BLD-Foundation11/28/200011/29/200011/29/2000APART
DetailsRuss Owen
Ted Parrott ###-#### subject to s-i 11/29/2000 12:25:47 PM
BLD-Footing11/17/200011/20/200011/20/2000APART
DetailsTom Arcoraci
will pour at 1:00\\###-#### sp insp 11/20/2000 8:45:51 AM
BLD-Footing11/13/200011/14/200011/14/2000APART
DetailsCarl Dependahl
###-####; spec insp report pending 11/14/2000 10:23:30 AM
Routing - PLAN CHECK11/3/2000 11/9/2000 PASS
Received missing engineering information & detail. Plans approved per red-lined notes & attached plan check comments as part of the approved plan.
Plan resubmittals received  11/9/2000 PASS
Received submittals to engineering details as requested from Darren Truchot, Pinnacle Engineers. Routing to issue permit.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2000 PASS
Routing to permit desk for issuance.
Print Occupancy Form  11/9/2000 DONE
Inspection Record Card- Bld  11/9/2000 DONE
Telephone call  11/9/2000 DONE
called permit ready
Issue PAID IN FULL permit  11/9/2000 DONE
Plan assigned to (DRS)9/6/2000 11/9/2000 PASS
DetailsDan Stuart
11/9/2000 09:50:35 DRS - activity updated through activity BLDA022 from case BLD00-02474.
Routing Off Site - STRUCTURAL10/25/2000 11/8/2000 PASS
RESUBMITTAL RESPONSE TO STRUCTURAL REVIEW COMMENTS OF 10/16/00 RECEIVED 10/23/00. FORWARDING TO PLANS & COMMENTS TO ENGINEER FOR REVIEW. 10/25/00 DAR
11/8/00 - Received fax from AHJ stating structural plan review & response to previous review comments are okay.
Plan resubmittals received  11/8/2000  
Recieved copy of approved EIFS system for use over wood.
Telephone call  11/8/2000 DONE
Call to Darren Trouchot of Pinnacle Engineers to request his details for 8/SD3; Special inspection list & deferred submittal comment on plans. He will fax to me.
Plan Reviewer's activity  11/8/2000 PEND
Organized plans & verified same data on both sets. Only need engineers thre resubmital resposnes to issued permit.
Plan resubmittals received  11/7/2000  
Partial submittal received.
Plan resubmittals received  11/6/2000  
Partial submittal.
Routing - PLANNING10/25/200010/25/200011/3/2000 PASS
Approved resubmitted plans.
Plan resubmittals received  11/3/2000 DONE
Received plan resubmittals from BRS Architects, Mike Capshaw, small documents, forwarded same to Dan Stuart. 11/3/00 DAR Submittals received were all incorrect. No change that are in compliance with code are shown. Phone call to Mike Capshaw to review accessible shower section of CABO/ANSIn A117.1-92 for room width & shower dimensions for transfere type shower; the EIFS insulation system receieved was for SBSSI land not ICBO. Product not approved for here; access ladder details incorrect and the structural support detail of beam & column not correct. Also did not include structural details referenced by structural engineer in his response. Mike will resubmit.
Plan resubmittals requested  10/25/2000  
FAXED AND MAILED ANOTHER REQUEST TO THE ARCHITECT ASKING HIM TO PROVIDE THE DETAILS AND CLARIFICATIONS HE SAID WERE SUBMITTED BUT WERE NOT OR ITEMS THAT WERE ONLY PART RESPONDED TO.
Routing - PLAN CHECK10/17/2000 10/25/2000 FAIL
REORGANIZED NEW SUBMITTALS. SENT ONE NEW SET OF PLANS WITH STRUCTURAL ENGINEERS RESPONSE & NEW PLAN MODIFICATIONS TO OUR CONTRACT OUTSIDE ENGINEERING FIRM FOR A SECOND REVIEW. I DISCUSSED CHANGES TO LANDSCAPING OF ORIGINAL REVIEW WITH TEMPRA WILSON, PLANNING, TO SEE IF SHE WANTED TO REVIEW AGAIN. SHE DOES SO I AM ROUTING THEM BACK TO HER.
REVIEW OF THE ARCHITECT RESPONSE TO MY INITIAL PLAN REVIEW COMMENTS OF 10/12/00, INDICATED HE HAD SAID A RESPONSE WAS PROVIDED BUT THE PLANS DID NOT REFLECT ANY CHANGES OR NEW RESPONSE SUBMITTALS TO SEVERAL OF THE QUESTIONS NEEDING ADDRESSED TO SHOW COMPLIANCE WITH CODE. I FAXED AND MAILED ANOTHER FOUR PAGE REQUEST FOR RESUBMITTALS TO MOKE CAPSHAW, TRYING TO BE SPECIFIC ABOUT WHAT WAS ORIGINALLY ASK FOR; WHAT HIS RESPONSE WAS; AND WHAT HE STILL NEEDED TO PROVIDE.
Plan resubmittals received  10/23/2000 DONE
RECEIVED THREE SETS OF RESUBMITTALS FROM BRS ARCHITECTS, PLUS SMALL DOCUMENTS, FORWARDED SAME TO DAN STUART. 10/23/00 DAR
Routing - FIRE10/13/200010/17/200010/17/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  10/17/2000 FAIL
Routing Off Site - STRUCTURAL9/28/20009/28/200010/16/2000 FAIL
REPORT ON OUTSIDE STRUCTURAL PLAN REVIEW. RESUBMITTALS REQUIRED & ROUT BACK FOR ADDITIONAL REVIEW. COPY OF REPORT TO ARCHITECT, MIKE CAPSHAW FOR RESPONSE ON 10/16/00
Plan resubmittals requested  10/12/2000 FAIL
Mailed & faxed copy of plan correction requirements to architect, Mike Capshaw.
Routing - PLAN CHECK9/19/2000 10/12/2000 FAIL
Started review of plan 9/28/00. Structural review sent to outside engineering review this day. Response from architect required to plan review comments. Routing to fire code analyst for review while waiting for architects response.
Plan resubmittals received  10/4/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM BRS ARCHITECTS, TWO SETS OF SMALL DOCUMENTS AND TWO SETS OF PLANS WITH THE FOLLOWING SHEETS SO.1, S1.1, S2.1, S3.1 AND S3.2, FORWARDED SAME TO DAN STUART. 10/4/00 DAR
Routing - PLUMBING9/14/2000 9/19/2000 PASS
extend 3" waste to 1st urinal, min. 1/4" per foot grade on all 4" roof drain and overflow, verify floor sink locations with field inspector
Routing - PLANNING9/11/2000 9/14/2000 PASS
Approve per DRH00-76 & 136
Routing - PUBLIC WORKS9/7/2000 9/11/2000 PASS
Plans ACCEPTED BY PLAN TECH  9/7/2000 DONE
Recd Pcfee & Taken To Pln CK  8/31/2000 DONE
Application received  8/18/2000