Case Summary (BLD) | | | 11/2/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/9/2005 | | |
|
|
|
|
BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/4/2001 5:02:46 PM ok for c/o
|
Permanent Occupancy | | 4/4/2001 | 4/4/2001 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 4/4/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8621 issued 4-4-01 to Zutto's Restaurant.
|
BLD-Conference | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/3/2001 3:48:25 PM need plbg ok'd for final
|
Fee Review-notes | 8/22/2000 | 8/22/2000 | 3/19/2001 | | DONE |
|
|
|
|
BLD-Final | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-#### TEMP OCC; c/n: eng's affidavit, other sig's, etc. OKfor t/o 3/12/2001 2:07:07 PM
|
Temporary occupancy | | | 3/12/2001 | | PART |
|
|
|
Temp. Occ. cert. #4523 issued 3-12-01 to Zutto's.
|
FIRE-Final Inspection | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 08:34:47. Contact: ###-####.
|
FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 | P | FAIL |
Rick Jackson
|
|
|
Harry ###-####
|
FIRE-Final Inspection | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | FAIL |
Rick Jackson
|
|
|
Perry ###-#### need to test extinguishing system; door hardware; occupant load sign; detectors for AHU shutdown 3/5/2001 1:06:34 PM
|
BLD-Final | 3/2/2001 | 3/5/2001 | 3/5/2001 | P | NR |
Carl Dependahl
|
|
|
Perry ###-####
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### need final reinspect letter from mti re door frames, rest appears ok 3/1/2001 3:30:06 PM
|
BLD-Conference | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 13:42:10. Contact: ###-####. w/ contactor...need complete all items, submit eng's observation. 2/28/2001 9:34:19 AM
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/27/2001 9:43:47 AM w/ cont re; t/o req's... need chk w/ Tim re omission of hvac access ladder
|
BLD-Framing/Rough-in | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 08:34:49. Contact: ###-####. 1st fl ok to cover; need stamped eng's observation report 1/19/2001 3:55:50 PM
|
BLD-Conference | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/11/2001 5:12:14 PM need engs ok
|
BLD-Framing/Rough-in | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Jim Sly
|
|
|
###-#### Pending special and seismic inspections and approvals. 12/27/2000 11:19:43 AM
|
Issue PAID IN FULL permit | | | 12/1/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/30/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/30/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2000 | | DONE |
|
|
|
called permit ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2000 | | PASS |
|
|
|
ROUTING TO PERMIT DESK FOR ISSUANCE.
|
Plan assigned to (DRS) | 9/19/2000 | | 11/29/2000 | | PASS |
Dan Stuart
|
|
|
11/29/2000 20:09:28 DRS - activity updated through activity BLDA022 from case BLD00-02503.
|
Routing - PLAN CHECK | 11/21/2000 | | 11/29/2000 | | PASS |
|
|
|
INSERTED NEW SUBMITTALS OF 11/21/00 INTO PLANS. TRANSFERED NOTES TO BOTH PLANS, ADJUSTED OCCUPANT LOAD FIGURES AND PREPARED TO PROCESS FOR PERMIT.
|
Plan resubmittals received | | | 11/21/2000 | | DONE |
|
|
|
Received two copies of revised sheets E1.0, one copy of respopnse letter and info on walk-in cooler, one copy of revised cert. of value. Routed to Dan S. KMM
|
Received Certificate of Value | | | 11/21/2000 | | |
|
|
|
RECEIVED NEW CERTIFICATE OF VALUE. ATTCHED TO PLANS & COPY TO PERMIT DESK FOR USE IN ISSUING PERMIT.
|
Plan Review Completed(1st rev) | | | 11/20/2000 | | FAIL |
|
|
|
failed bldg review
|
Routing - FIRE | 11/15/2000 | | 11/20/2000 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 11/15/2000 | | FAIL |
|
|
|
Faxed and mailed copy of plan review with cover letter to margie. Routing to fire code analyst for review.
|
Routing - PLAN CHECK | 9/26/2000 | | 11/15/2000 | | FAIL |
|
|
|
PLAN REVIEW COMPLETED CLARIFICATION ON ACHD FEE'S REQUIRED. ROUTING TO FIRE CODE ANALYSTS FOR REVIEW AND COMMENT.
|
Routing - PLUMBING | 9/21/2000 | | 9/26/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2000 | | 9/21/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 9/19/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Signed by Carol Johnson, Central District Health on 8/24/00.
|
Additional plans submitted | | | 9/19/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF P-1 SHEET. PUT TWO WITH PLANS AND ONE IN HOLD BOX. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2000 | | DONE |
|
|
|
|
Pending Assignment by MYS | 9/19/2000 | | 9/19/2000 | | DONE |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/24/2000 | | HOLD |
|
|
|
REQUIRES PLUMB. PLANS. FAXED AND LEFT MESSAGE WITH MARGIE KENNEDY. KMM
|
Received Certificate of Value | | | 8/22/2000 | | DONE |
|
|
|
|
Application received | | | 8/22/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/2000 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 12/1/2000 | 12/1/2000 | | | |
|
|
|
received impact fee #01-00143 for $7,002.00/12/1/00/mls
|