Permit Information
Permit NumberBLD00-02514
StatusFinaled
Name GADZOOKS
Site Address 350 N MILWAUKEE ST Unit: 2040
Project NameBTS - #2040
Customer Number 
ePlanReviewNo
Description
To remodel a 2,576 sq.ft. retail space on the 2nd level for a new tenant per approved plans on file. Work to include, new storefornt and entry doors, new noncombustible partitions to construct, dressing rooms, office, stockroom and one fully accessible restroom, new ceiling and related finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall be maintained as installed under the 1985 UBC. (P.C.#683-00)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/23/20008/23/20005/16/2001 DONE
Permanent occupancy UNPAID FEE  11/21/2000 DONE
Perm. Occ. Cert. #8475 issued 11-21-00 to Gadzooks on the upper level of Boise Towne Square.
Permanent Occupancy 11/20/200011/20/2000 DONE
Details
FIRE-Final Inspection11/17/200011/20/200011/20/2000APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/17/2000 at 12:03:05. Contact: ###-####.
BLD-Final11/17/200011/20/200011/20/2000PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/17/2000 at 12:06:01. Contact: ###-####...ok for c/o 11/20/2000 5:05:00 PM
BLD-Final11/16/200011/17/200011/17/2000PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/16/2000 at 11:46:18. Contact: ###-####.
FIRE-Final Inspection11/16/200011/17/200011/17/2000AFAIL
DetailsJoe Tawney
###-####. Final Fail Alarm test and door hdwre 11/17/2000 11:58:13 AM
FIRE-Final Inspection11/15/200011/16/200011/16/2000PCANC
DetailsJoe Tawney
###-####.Cancel to be rescheduled 11/16/2000 12:57:22 PM
BLD-Conference11/15/200011/15/200011/15/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/15/2000 5:29:16 PM grid const ok
BLD-Framing/Rough-in11/14/200011/15/200011/15/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/14/2000 at 15:08:20. Contact: ###-####.
BLD-Other11/13/200011/14/200011/14/2000PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/13/2000 at 09:02:40. Contact: ###-####.
BLD-Framing/Rough-in10/23/200010/24/200010/24/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/23/2000 at 16:49:11. Contact: ###-####.add gyp over plywood at lids; complete connections at eng'd storefront. ok to continue 10/24/2000 3:34:40 PM
BLD-Framing/Rough-in10/20/200010/23/200010/23/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/20/2000 at 08:37:06. Contact: ###-####. need all eng'd bracing installed & elec r/i 10/23/2000 5:19:01 PM
Issue PAID IN FULL permit  10/19/2000 DONE
Plan resubmittals received  10/18/2000 DONE
RECEIVED THREE SETS OF PLANS AND CACULATIONS FROM KELLER AND ASSOCIATES. FORWARDED SAME TO RON HILL. 10/18/00
PLANS/APPL TAKEN TO FRONT DESK  10/18/2000 PASS
DetailsRon Hill
Inspection Record Card- Bld  10/18/2000 DONE
Print Occupancy Form  10/18/2000 DONE
Telephone call  10/18/2000 DONE
Larry EKC ###-####
Plan assigned to (R_H)8/30/2000 10/18/2000 PASS
Details
10/18/2000 14:00:36 RMH - activity updated through activity BLDA022 from case BLD00-02514.
Routing - PLAN CHECK9/27/2000 10/18/2000  
DetailsRon Hill
Plan Reviewer's activity  10/11/2000 FAIL
DetailsRon Hill
No engineering with resubmitted plans, called and talked to Matt Johnson architect, told him that I was still in need of the engineering that I have requested.
Plan resubmittals received  10/9/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM MIENHARDT AND QUINTANA ARCHITECTS, THREE SETS OF AHEETS A2, A5 AND A6, FORWARDED SAME TO RON HILL
Plan Reviewer's activity  10/2/2000 FAIL
DetailsRon Hill
Received and reviewed resubmittals, still lacking details and engineering for storefront structure, Called and talked to Architect Rob Quintanas, I faxed him an example of the structural engineering requirements, Faxed it at 10:30 on 10-02-00.
Plan resubmittals received  9/28/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1, A2, A5, A6, AND A8. ROUTED TO RON HILL. KMM
Routing - FIRE9/22/20009/27/20009/27/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  9/27/2000 FAIL
Routing - PLAN CHECK8/31/2000 9/22/2000 FAIL
DetailsRon Hill
Routed plans to fire department for review.
Plan Reviewer's activity  9/22/2000 FAIL
DetailsRon Hill
Mailed requirements to the architect, tryed to fax but could not connect. Will route to fire department.
Case Summary (BLD)  9/22/2000 DONE
Routing - PUBLIC WORKS8/30/2000 8/31/2000 PASS
Pending Assignment by MYS8/30/2000 8/30/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  8/30/2000 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  8/28/2000 DONE
Received Certificate of Value  8/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  8/24/2000 DONE
REQUIRES RECORD DECLARATION FORM TO BE SIGNED BY OWNER
Received Certificate of Value  8/24/2000 FAIL
REQUIRES ELECT. AND MECHANICAL VALUES. FAXED AND CALLED, MATT JOHNSON. KMM
Application received  8/23/2000  
Recd Pcfee & Taken To Pln CK  8/23/2000 DONE