BLD-Conference | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/24/2001 6:11:02 PM w/ St. Lukes proj mgr, need to determine fix for north wall....earth/wood separation.
|
BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 4/17/2001 | 4/19/2001 | 4/19/2001 | P | NR |
Tom Arcoraci
|
|
|
scott ###-#### needs other finals 4/19/2001 3:36:50 PM
|
BLD-Energy code compliance | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Alan Hauser
|
|
|
Travis ###-####
|
BLD-Energy code compliance | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | FAIL |
Steven Webb
|
|
|
needs energy report,c/n issued 11/6/2000 1:46:35 PM
|
Override - Parcel Holds | | | 11/6/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 11/6/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Steven Webb
|
|
|
Travis ###-####: c/n issued ok to insulate, need to verify compliance with c/n at energy. 11/3/2000 10:26:52 AM
|
Override - Parcel Holds | | | 11/2/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PART |
Steven Webb
|
|
|
TRavis ###-####: C/N issued, need eng. on Eng. I-beams plumbing cut outs. 10/31/2000 12:26:58 PM
|
Override - Parcel Holds | | | 10/31/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Steven Webb
|
|
|
Travis ###-#### please call on your way out!! Reviewed prior c/n items.
|
Override - Parcel Holds | | | 10/25/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### see cn notice two numerous to list 10/11/2000 2:40:04 PM
|
Override - Parcel Holds | | | 10/11/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/11/2000 | | |
|
|
|
|
Plan assigned to (DJO) | 9/21/2000 | 9/21/2000 | 9/21/2000 | | PASS |
Dan Overy
|
|
|
9/21/2000 10:04:15 DJO - activity updated through activity BLDA022 from case BLD00-02517.
|
Plan Reviewer's activity | | | 9/21/2000 | | PEND |
|
|
|
have contacted both designer and contractor about items that need modified. addendums to be faxed on one-hour eave overhang at detached garage and 2nd floor redesign to obtain room dimensions for bedroom. other items will be red-lined including re-inforcing requirements and holdown/anchor bolt at front of single family dwelling.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/21/2000 | | DONE |
|
|
|
information rec.
|
Telephone call | | | 9/21/2000 | | DONE |
|
|
|
called GQ homes ###-####
|
Inspection Record Card- Bld | | | 9/21/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 9/21/2000 | | |
|
|
|
|
BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | CANC |
Tony Young
|
|
|
FT INSP JAKE ###-####
j.s. to do 9/14/2000 10:14:32 AM
|
BLD-Concrete | 9/14/2000 | 9/14/2000 | 9/14/2000 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 9/14/2000 ft ok
|
Override - Parcel Holds | | | 9/13/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/23/2000 | 8/23/2000 | 8/25/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 8/23/2000 | 8/23/2000 | 8/25/2000 | | PASS |
|
|
|
|
Application received | | | 8/23/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 8/25/2000 | 8/25/2000 | | | PEND |
|
|
|
|
Early Start Permit | | | | | PEND |
|
|
|
|
Pending Assignment by DJO | 8/23/2000 | | | | PEND |
Dan Overy
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|