BLD-Conference | 3/18/2003 | 3/18/2003 | 3/18/2003 | A | CANC |
Russ Owen
|
|
|
just looking at permit hist. 3/18/2003 10:27:31 AM
|
Fee Review-notes | 8/24/2000 | 8/24/2000 | 5/23/2001 | | DONE |
|
|
|
|
DOC - Permit Finaled | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/28/2001 1:37:03 PM ok pem oc.
|
Letter of compliance | | | 2/28/2001 | | DONE |
|
|
|
Letter of Compliance #21348 issued 2-28-01.
|
BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | FAIL |
Russ Owen
|
|
|
###-####raise bath room sinks,letter from engineer ok special insp def.and zoning insp reqd. 2/8/2001 11:27:44 AM
|
FIRE-Final Inspection | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### ###-#### Final OK for certificate of completion 2/8/2001 12:41:45 PM
|
BLD-Final | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 17:25:20. Contact: ###-####. grid ok 1/31/2001 11:18:43 AM
|
FIRE-Final Inspection | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### met with contractor for conference; reviewed items for final: fire lanes, signage, door hardware; address; exit signs 1/30/2001 9:34:03 AM
|
BLD-Framing/Rough-in | 1/9/2001 | 1/10/2001 | 1/10/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 18:21:15. Contact: ###-####.
|
BLD-Foundation | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PART |
Dave Hannah
|
|
|
Late AM, please. Bob, ###-####
|
BLD-Footing | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Carl Dependahl
|
|
|
###-####; ext ftgs ok; centerline n/r 10/27/2000 12:13:05 PM
|
(F) Reprint permit | | | 10/23/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/20/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/19/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2000 | | DONE |
|
|
|
Bob Lemoine at ###-#### permit ready
|
Telephone call | | | 10/18/2000 | | DONE |
|
|
|
BOB LAMOINE, LAMOINE CONSTRUCTION CALLED TO CHECK ON PERMIT PROGRESS. I REVIEWED THE NEW SUBMITTAL CHANGES ON A4 FOR THE STEL SPANDRAL BEAM REQUIRED PER ENGINEERING AND ASK HIM TO PROVIDE A DETAIL SHOWING THE HEIGHT ON THE WALL FOR INSTALLATION AND THE SIZE OF THE BEAM PER DESIGN OF BEHLEN MANUFACTURING AS NOTED IN ENGINEERS PLAN REVIEW RE-SUBMITTAL RESPONSE. HE IS GETTING INFORMATION FOR ATTACHMENT TO PLANS.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2000 | | PASS |
|
|
|
ROUTED TO FRONT DESK FOR ISSUANCE OF PERMIT.
|
Routing - PLAN CHECK | 10/16/2000 | | 10/18/2000 | | PASS |
|
|
|
PLAN RE-SUBMITTALS ASSEMBLED INTO ORIGINAL PLAN SUBMITTALS WITH ENGINEERING RESPONSE AND SPECIAL INSPECTION APPLIACATION FORM TO BE COMPLETED AND DELIVERED TO STRUCTURAL INSPECTOR. MR. LEMOINE STATED DAVE CRAM, MTI, WILL BE THE SPECIAL INSPECTION AGENCY / INSPECTOR. CHECKED OFF ITEMS MIKE OTTO HAD MARKED FOR RESUBMITTAL.
|
Plan resubmittals received | | | 10/18/2000 | | |
|
|
|
RECEIVED NEW SHEET A7 FOR DOOR MODIFICATIONS TO 3/4 HOUR ASSEMBLIES AT THE WEST SIDE WALL W/I 10 FEET OF PROPERTY LINE PER OSCAR. INSERTED INTO PLANS.
|
Meeting | | | 10/18/2000 | | PASS |
|
|
|
TOOK PLANS TO TEMPRA WILSON TO SHOW HER THE MODIFICATIONS TO THE WEST WALL SHOWING INSTALLATION OF NEW EXTERIOR FIRE-RATED DOORS REQUIRED BECAUSE OF EXCESSIVE TRAVEL DISTANCE WITHIN FUTURE TENANT SPACES (>75 FEET) AND NEW 4' X 4' EXTERIOR LANDINGS AT EACH DOOR. SHE STATED SHE WOULD NOT HAVE TO REVIEW PLANS AGAIN.
|
Application received | | | 10/18/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 8/31/2000 | | 10/18/2000 | | PASS |
Mike Otto
|
|
|
10/18/2000 17:22:49 DRS - activity updated through activity BLDA022 from case BLD00-02533.
|
Meeting | | | 10/17/2000 | | PASS |
|
|
|
DISCUSSED RESUBMITTAL OF SITE PLAN WITH BILL ALEXANDER. FIRE CODE ANALYST. GRADING PERMIT HAD BEEN APPROVED WITH CONDITIONS. ARCHITECT HAD ADDRESSED SOME OF THE CONDITIONS ON THE RESUBMITTAL. BILL SIAD THE FIELD INSPECTOR WOULD REVIEW PER COMMENTS ON HIS PLAN REVIEW COMMENTS. DID NOT NEED TO ROUTE BACK.
|
Routing - PLUMBING | 10/11/2000 | | 10/13/2000 | | PASS |
|
|
|
per plans and 97 upc, project will require both P-1's, !st resubmitted sept. 21st. the second oct. 11th one has plumbing the other has site utilities.
|
Plan resubmittals received | | | 10/12/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET P1. PUT WITH PLANS. KMM
|
Plan resubmittals received | | | 10/12/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A0, A1, A2, A3, A4, A6. TWO COPIES OF RESPONSE TO CITY COMMENTS. PUT WITH PLANS. KMM
|
Plan resubmittals received | | | 10/11/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM LARRY KNOPP, TWO SETS OF SHEET A1, FORWARDED SAME TO MIKE OTTO. 10/11/00 DAR
|
Routing - PLUMBING | 9/29/2000 | | 10/2/2000 | | FAIL |
|
|
|
please provide a plan showing the routing of the domestic water and sanitary sewer services
|
Routing - FIRE | 9/25/2000 | 9/28/2000 | 9/28/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 9/28/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 9/26/2000 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS
|
Routing Off Site - STRUCTURAL | 8/31/2000 | | 9/26/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM CORRECTIONS FAXED TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 9/20/2000 | | 9/25/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT
|
Plan resubmittals requested | | | 9/25/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Plan resubmittals received | | | 9/21/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM LARRY KNOPP, 4 SHEETS OF A-1, TWO SHEETS OF A-3 AND P-1, FORWARDED SAME TO MIKE OTTO. 9/21/00 DAR
|
Routing - PLUMBING | 9/18/2000 | | 9/20/2000 | | FAIL |
|
|
|
requested information not provided
|
Routing - PLAN CHECK | 9/13/2000 | | 9/18/2000 | | |
|
|
|
PLANS ROUTED TO PLUMBING AND FIRE FOR EXCAVATION PERMIT UBC PLAN REVIEW ON HOLD. MLO
|
Routing - PLUMBING | 9/6/2000 | | 9/12/2000 | | FAIL |
|
|
|
increase of venting cross sectional area required, dcva and thermol expantion protection required on building water service, cleanouts required on waste lines over 5'. provide a plan showing size and location of building water and sewer services.
|
Routing - PLANNING | 9/1/2000 | | 9/6/2000 | | PASS |
|
|
|
Approve per DRH00-129
|
Routing - PUBLIC WORKS | 8/28/2000 | | 9/1/2000 | | PASS |
|
|
|
|
Telephone call | | | 9/1/2000 | | DONE |
|
|
|
RECEIVED TELEPHONE CALL FROM KEITH JONES STATING THAT WITHOUT THE FOUNDATION CALCULATIONS HE MUST PUT THE STRUCTURAL REVIEW ON HOLD. ARCHITECT WILL BE CONTACTED AGAIN TO PROVIDE CALCS ASAP. MLO
|
Plans ACCEPTED BY PLAN TECH | | | 8/31/2000 | | DONE |
|
|
|
|
Additional plans submitted | | | 8/29/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF ENG. STEEL PLANS AND CALCS FOR THE BUILDING. JOHN MENARD STATED PLANS SHOW THE LOADS BUT NOT CALCULATIONS. BOB LEMOINE SAID THOSE WILL BE ENROUTE. KMM
|
Telephone call | | | 8/28/2000 | | DONE |
|
|
|
SPOKE WITH LARRY KNOPP'S OFFICE REQUESTING THREE COPIES OF STEEL ENG. PLANS FOR THE BUILDING WITH STRUCTURAL CALCULATION. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 8/28/2000 | | HOLD |
|
|
|
ROUTED ONE COPY OF PLANS AND STRUCT. CALCS. TO MARLENE FAXED LARRY ABOUT STEEL BUILDING PLANS AND ENG. BEING REQUIRED. COPY OF PLAN FOR OUTSIDE REVIEW ARE IN MY HOLD BOX. KMM
|
Received Certificate of Value | | | 8/28/2000 | | DONE |
|
|
|
INITIAL CERT. OF VALUE WAS $469.000. MR. LEMOINE REQUESTED A GRADING PERMIT. NEW CERT. OF VALUE * PROJECT VALUE $400,400 ELECT. $28,200 PLUMB. $6,000 MECH. $9,200
|
Plan routing begun/NEW & ADDTN | | | 8/28/2000 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/24/2000 | | DONE |
|
|
|
|