Permit Information
Permit NumberBLD00-02588
StatusFinaled
Name LIBERTY ONE
Site Address 10 N LIBERTY ST
Project NameLIBERTY ONE-SHELL
Customer Number 
ePlanReviewNo
Description
THE LIBERTY ONE BUILDING (SHELL) * TO CONSTRUCT A NEW 12,240 SQ.FT. ONE STORY SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF TILT-UP CONCRETE EXTERIOR WALLS AND STEEL FRAME ROOF AND INTERIOR SUPPORT STRUCTURE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. THIS BUILDING IS FULLY FIRE SPRINKLED. SEPARATE FIRE SPRINKLER AND ALARM PLANS WITH APPROVAL AND SEPARATE PERMITTING IS REQUIRED FOR EACH BEFORE ANY OVERHEAD OR UNDERGROUND WORK IS DONE. DRH00-00158/PC#709-00/JCM GRADING PERMIT UNDER SEPARATE PLANS BLD00-02634
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/30/2002  
Case Summary (BLD)  5/30/2002  
Case Summary (BLD)  1/18/2002 DONE
Letter of compliance  5/25/2001 DONE
Letter of Compliance #21515 issued 5-25-01.
BLD-Final5/22/20015/22/20015/22/2001PPASS
DetailsTom Arcoraci
Gene ###-#### please call first before going out ok for perm occ 5/22/2001 1:56:41 PM
BLD-Final5/16/20015/17/20015/17/2001APART
DetailsTom Arcoraci
Gene ###-#### please call first ok for temp occ need letters from spec insp and eng of record 5/17/2001 11:21:31 AM
BLD-Final5/15/20015/15/20015/15/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 5/15/2001 10:41:01 AM Reinsp OK FOR CERTIFICATE OF CONPLETION
FIRE-Final Inspection5/11/20015/11/20015/11/2001PFAIL
DetailsJoe Tawney
Gean ###-#### please call first Reinsp Fail hydro test FDC and spud in inspector test line 5/11/2001 2:08:10 PM
Code Occupancy Approval  5/8/2001 PASS
Meets compliance with DRH00-00158 and the landscape plans submitted to Planning dept. on 5/7/01 to Marty S.
FIRE-Final Inspection4/30/20015/1/20015/1/2001AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 5/1/2001 12:13:49 PM
FIRE-Final Inspection4/27/20014/30/20014/30/2001ACANC
DetailsJoe Tawney
###-#### call first Cancel To be rescheduled 4/30/2001 12:04:37 PM
Additional plans submitted  3/29/2001 PASS
REVISED plans submitted by architect, eliminating the proposed new hydrants on the property which were shown on the approved plans. The existing street hydrant is adequate for this building and the proposed future building to be buildt opposite this one.
BLD-Conference3/15/20013/16/20013/16/2001ACANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 3/15/2001 10:55:19 AM
BLD-Framing/Rough-in3/14/20013/15/20013/15/2001APART
DetailsTom Arcoraci
Gene ###-#### rough in on the mechincal room. wip ok to cover elec room 3/15/2001 10:51:38 AM
BLD-Framing/Rough-in1/29/20011/29/20011/29/2001PPART
DetailsTom Arcoraci
###-#### welding for joist, metal deck on roof wip 1/29/2001 3:10:25 PM
BLD-Concrete1/3/20011/5/20011/5/2001APASS
DetailsDave Hannah
GENE ###-####- CONCRETE PANEL TILT UPS
BLD-Foundation1/3/20011/3/20011/3/2001PPART
DetailsTom Arcoraci
COLUMN & REBAR-- GENE ###-#### spec insp 1/3/2001 1:29:52 PM
BLD-Footing12/18/200012/18/200012/18/2000PPART
DetailsTom Arcoraci
FT -WILL POUR 3-- GENE ###-#### wip sp insp 12/18/2000 2:09:43 PM
BLD-Concrete12/14/200012/15/200012/15/2000APASS
DetailsDave Hannah
CONCRETE-- GENE ###-####special inspector on site 12/15/2000 10:35:34 AM
BLD-Concrete12/12/200012/13/200012/13/2000APART
DetailsTom Arcoraci
rebar and tilt up panels Jean ###-#### pouring at 9:00 wip 12/13/2000 10:30:40 AM
BLD-Concrete12/5/200012/5/200012/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/5/2000 5:03:52 PM mti onsite
BLD-Conference12/4/200012/4/200012/4/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/4/2000 3:16:49 PM w/ John Menard re plans
BLD-Concrete11/17/200011/20/200011/20/2000APART
DetailsAlan Hauser
###-#### slab insp
BLD-Concrete11/14/200011/14/200011/14/2000PPART
DetailsDave Hannah
###-#### please call first
Plan resubmittals received  11/7/2000 DONE
Received plan resubmittals from Larson Architects, Dawna Jenkins, two sets of sheets A-1 and S-0 to S-11, forwarded same to John Menard. 11/7/00 DAR
(F) Reprint permit  10/23/2000 DONE
Issue PAID IN FULL permit  10/20/2000 DONE
Telephone call  10/17/2000 DONE
Called Cornel Larson permit ready for pickup ###-####
Inspection Record Card- Bld  10/17/2000 DONE
Print Occupancy Form  10/17/2000 DONE
Routing - PUBLIC WORKS10/9/2000 10/16/2000 PASS
Routing Off Site - STRUCTURAL10/10/2000 10/16/2000 PASS
RECEIVED A LETTER FROM THE CONSULTING STRUCTURAL ENGINEER APPROVING THE LAST RESUBMITTED PLAN SHEETS. JCM
Routing - PLAN CHECK10/16/2000 10/16/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/16/2000 PASS
Plan assigned to (JCM)9/7/2000 10/16/2000 PASS
DetailsJohn Menard
10/16/00 15:33:38 JCM - activity updated through activity BLDA022 from case BLD00-02588.
Plan resubmittals received  10/10/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM CORNEL LARSON TWO SETS OF STRUCTURAL SHEETS AND SMALL DOCUMENTS. FORWARDED SAME TO JOHN MENARD. 10/10/00 DAR
Plan resubmittals received  10/6/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS C-1, C-2, C-3, C-4 ROUTED TO JOHN M. KMM
Routing - FIRE10/4/200010/4/200010/4/2000 PASS
DetailsBill Alexander
Plan resubmittals requested  10/4/2000  
FAXED ARCHITECT OF RECORD A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING ADDITIONAL REVISIONS. JCM
Routing Off Site - STRUCTURAL10/3/2000 10/4/2000 FAIL
SENT RESUBMITTALS TO CONSULTANTING ENGINEER.10/3/00 DAR
RECEIVED FAX FROM CONSULTING STRUCTURAL ENGINEER INDICATING ADDITIONAL RESUBMITTALS REQUIRED. JCM
Routing - PLAN CHECK9/25/2000 10/4/2000  
Plan resubmittals received  10/3/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LARSON ARCHITECTS SMALL DOCUMENTS AND THREE SETS OF S-3 AND S-5, FORWARDED SAME TO JOHN MENARD. 10/3/00 DAR

Plan resubmittals requested  9/26/2000  
FAXED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. JCM
Routing Off Site - STRUCTURAL9/7/2000 9/26/2000 FAIL
SEND AFTER BINNY BRINGS IN SOILS REPORT. CONTACTED PDQ TO TAKE PLANS TO OUT SIDE ENG. KMM RECEIVED 2 SOILS REPORTS FROM LARSON ARCHITECTS FORWARDED ONE WITH PLANS TO CONSULTING ENGINEER. 9/8/00 DAR RECEIVED A FAX FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. JCM
Routing - FIRE9/21/20009/26/20009/25/2000 FAIL
DetailsBill Alexander
Lack fire sprinkler design flows available.
Plan Review Completed(1st rev)  9/25/2000 FAIL
P.Works
Plan Reviewer's activity  9/21/2000 PASS
PLANS REVIEWED AND APPROVED AS SUBMITTED WITH ATTACHED COMMENT LIST. JCM
Routing - PLAN CHECK9/19/2000 9/21/2000  
Routing - PLUMBING9/14/2000 9/19/2000 PASS
per plans and 97 upc
Routing - PLANNING9/12/2000 9/14/2000 PASS
Please see approval in DRH00-158
Routing - PUBLIC WORKS9/7/2000 9/12/2000 FAIL
REQUIRES GEOTECH REPORT PER BRIAN MURPHY. 9/12/00 DAR
Plan routing begun/NEW & ADDTN  9/7/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/7/2000 DONE
WAITING FOR SOILS REPORT. SPOKE WITH BINNY. HE STATED IT WILL BE HERE SOON. KMM9-8-00 RECEIVED SOILS REPORT. SENT ONE COPY TO OUTSIDE ENG. THE OTHER COPY ROUTED TO PLAN CHECKER. KMM
Received Certificate of Value  8/31/2000 DONE
Application received  8/31/2000  
Recd Pcfee & Taken To Pln CK  8/31/2000 DONE