CHANGE STATUS TO (FNL) | | | 4/21/2008 | | DONE |
|
|
|
Pam B. in records added the wrong activity and changed the status to ready.rad
|
Permit Ready to Issue | | | 2/25/2008 | | |
|
|
|
|
(F) Reprint permit | | | 2/25/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 4/20/2005 | | DONE |
|
|
|
|
PRINT Activities | | | 8/27/2003 | | DONE |
|
|
|
|
Fee Review-notes | 6/30/2003 | 6/30/2003 | 6/30/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent Occupancy | | 4/2/2001 | 4/2/2001 | | DONE |
|
|
|
|
BLD-Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PASS |
Carl Dependahl
|
|
|
fn occ-- phil ###-####
|
BLD-Conference | 4/2/2001 | 4/2/2001 | 4/2/2001 | | PASS |
Carl Dependahl
|
|
|
Issued c/o to big easy but included letter stating posted occupant load of assembly area of first floor was 564 standing and 263 with seating and it would be adhered to. Present was Phil of simplot const. Carl Dependahl building inspector, George Slane supervisor and Jenifer Gilliland Deputy Director PDS.
|
Permanent occupancy | | | 4/2/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8617 issued 4-2-01 to The Big Easy.
|
Office Staff conference/action | | | 3/28/2001 | | PART |
|
|
|
Temp. Occ. #4501 will be extended for an additional period of 30 days from April 9, 2001 as per Jenifer G. Correction notice items have not been completed.
|
BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Contr opted to get final insp from original inspector or other inspectors involved with project from start. 3/27/2001 3:45:51 PM 3/27/2001 3:46:35 PM
3/27/2001 3:49:48 PM
|
Fee Review-notes | 9/7/2000 | 9/7/2000 | 3/19/2001 | | DONE |
|
|
|
|
BLD-Conference | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/15/2001 4:07:19 PM w/ BFD re c/n; met w/ Simplot & Bravo Ent...provide monitoring of loads or risk revocation of occ. cert.
|
Telephone call | | | 3/8/2001 | | DONE |
|
|
|
Talked with Mark Bowen re: status of temp. occ.
|
Temporary occupancy | | | 1/9/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4501 issued 1-9-01 to The Big Easy.
|
FIRE-Final Inspection | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Carl Dependahl
|
|
|
8###-#### c/n, ok for t/o 1/8/2001 6:32:11 PM
|
FIRE-Final Inspection | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | FAIL |
Rick Jackson
|
|
|
FN FIRE ###-#### PHIL resubmittals not available for stair and occupant load changes 1/8/2001 11:20:18 AM
|
BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | FAIL |
Jim Storey
|
|
|
FN OCC PHIL ###-#### no aproved plans on site resubmitals for occ. exiting changes. 1/5/2001 5:32:35 PM
|
Routing - PLAN CHECK | 1/2/2001 | | 1/5/2001 | | PASS |
Carl Westfall
|
|
|
Plans approved by Sam Rogers and returned to Carl's desk. Carl had signed off on plans as approved prior to leaving on vacation. Completing process for issuance.
|
Routing - FIRE | 12/27/2000 | | 1/2/2001 | | PASS |
|
|
|
plans routed to fire by Bldg reviewer for occupancy load revision. Approved without comments.
|
BLD-Final | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Jim Storey
|
|
|
###-#### phil l/c for only one night 12/31/2000 12/29/2000 4:58:47 PM
|
FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/29/2000 | P | PART |
Rick Jackson
|
|
|
phil ###-####/// okay to occupy for 12/31 only 1/2/2001 8:33:32 AM
|
Plan resubmittals received | | | 12/26/2000 | | DONE |
|
|
|
Received Plan Resubmittals from Armstrong Architects, two sets of sheets A2.0 and A2.1, forwarded same to Carl Westfall. 12/26/00 DAR
|
FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/21/2000 | P | FAIL |
Rick Jackson
|
|
|
PER PHIL FOR CONF/// met with architecft about exiting and occupant loads 12/21/2000 10:36:28 AM
|
BLD-Conference | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/14/2000 3:59:51 PM w/ YMC re hvac...need letter of clarification for corridor
|
BLD-Conference | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/13/2000 5:55:17 PM re stairs
|
Plan resubmittals received | | | 12/11/2000 | | DONE |
|
|
|
Received one copya of type II hood information. Routed to inspector. Carl D. KMM
|
BLD-Framing/Rough-in | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PART |
Carl Dependahl
|
|
|
###-####; need clarify cooridor door addns, gate at stairs, hvac at corridor; ok to place 1st layer lid & rock bath area 12/7/2000 12:27:59 PM
|
BLD-Conference | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/1/2000 12:08:25 PM referred to fire insp re sprinklers below stage
|
Override - Parcel Holds | | | 11/28/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/27/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/27/2000 | | |
|
|
|
Drawings establishing allowable occupant loads were submitted. The following occupant load signs shall be posted: (1) Dance Hall - "Maximum occupant load 263 with seating OR 564 standing only". (2) Mezzanine - "Maximum occupant load 90 with seating OR 192 standing only".
|
Inspection Record Card- Bld | | | 11/22/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/22/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/1/2000 | | 11/21/2000 | | PASS |
|
|
|
The drawings were approved, with conditions, after the resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2000 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 10/5/2000 | | 11/21/2000 | | PASS |
Carl Westfall
|
|
|
11/21/00 10:30:16 CJW - activity updated through activity BLDA022 from case BLD00-02658.
|
Plan resubmittals received | | | 11/17/2000 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.1, two copies of supplemental structural calculations, and one copy of plan review comments letter, from Armstrong Architects.. Routed to Carl W.
|
Routing - PUBLIC WORKS | 10/31/2000 | | 11/1/2000 | | PASS |
|
|
|
|
Routing - FIRE | 10/26/2000 | | 10/31/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 10/31/2000 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 10/18/2000 | | 10/26/2000 | | |
|
|
|
Failed first UBC plan review.
|
Plan Reviewer's activity | | | 10/20/2000 | | |
|
|
|
UBC plan review started October 20, 2000 and finished October 25, 2000. A response from the architect was required. See the conditions list.
|
Routing - PUBLIC WORKS | 10/16/2000 | | 10/18/2000 | | |
|
|
|
Drawings failed 2nd PW review. NEEDS TO PASS A SIGHT INSPECTION BY PUBLIC WORKS AND FUTHER REWIEW BY PW IS REQUIRED ACCORDING TO LOUISE WALDORF. 10/18/00 DAR
|
Routing - PLAN CHECK | 10/6/2000 | | 10/16/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/5/2000 | | 10/6/2000 | | |
|
|
|
Drawings failed first PW review. ARCHITECT TO FURNISH MENU AND PLACEMENT OF DINNING AREA PER LOUISE WALDORF. 10/6/00 DAR
|
Routing - PLUMBING | 10/6/2000 | | 10/6/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 10/5/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Central District Health previously approved by Carol Johnson.
|
Plans ACCEPTED BY PLAN TECH | | | 9/29/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2000 | | |
|
|
|
REQUIRES STAMPED AND SIGNED MECH. AND PLUMB. PLANS. TARRIE BROUGHT IN THE INFORMATION REQUESTED ON 9/12/00. PLANS IN MY HOLD BOX. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 9/12/2000 | | |
|
|
|
TARRIE OF ARMSTRONG CAME AND TOOK PLANS. PLANS REQUIRE -
1. STAMPED AND SIGNED MECHANICAL PLANS.
2. STAMPED AND SIGNED PLUMBING PLANS.
3. KITCHEN PLANS.
4. SOILS REPORT
5. INDICATE WHICH RESTAURANT IS WHICH.
6. PLANNING AND ZONING INFORMATION.
7. STAMPED AND SIGNED COVER SHEET. KMM
|
Received Certificate of Value | | | 9/7/2000 | | DONE |
|
|
|
|
Application received | | | 9/7/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 9/7/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2000 | | DONE |
|
|
|
|