Permit Information
Permit NumberBLD00-02659
StatusFinaled
Name BOURBON STREET
Site Address 416 S 9TH ST Unit: 108
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(BOURBON STREET) Fire sprinklers substitute for 1-hr fire-resistive construction of the building. To create a 2,763 square foot bar/lounge tenant space on the first floor of an existing historic building. Work is to include three restrooms accessible to the disabled, interior nonbearing walls, a 1-hr fire-resistive corridor, and millwork all per approved drawings and plan review conditions on file. The occupant load of this tenant space (120) shall be posted near the main exit. This tenant space is connected to the adjacent "Big Easy" tenant space through a 2-hr area separation wall. The existing 2-hr area separation wall shall be maintained. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-727-00 **CJW** (12-27-00) SEE RESUBMITTED DRAWINGS FOR POSTING OF OCCUPANT LOADS. (4-4-01) A MAXIMUM OCCUPANT LOAD (NO TABLES OR CHAIRS) OF 152 IS ALLOWED IN THE BAR AND 92 IN THE VIP LOUNGE. WITH TABLES AND/OR CHAIRS THE MAXIMUM OCCUPANT LOADS ARE 71 AND 43, RESPECTIVELY.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/20/2005 DONE
Fee Review-notes9/13/20019/13/20019/17/2001 DONE
Permanent Occupancy 4/2/20014/2/2001 DONE
Details
BLD-Final4/2/20014/2/20014/2/2001PPASS
DetailsCarl Dependahl
phil ###-#### fn occ
Conference4/2/20014/2/20014/2/2001 PASS
DetailsCarl Dependahl
Issued c/o to bourbon street and included letter of confermation that posted occupant load in assembly areas of first floor. 564 standing and 263 with seating would be adhered to. Present were Phil with simplot const. Carl Dependahl building inspector, George Slane supervisor and Jeniffer Gilliland PDS Deputy Director.
Permanent occupancy  4/2/2001 DONE
Perm. Occ. Cert. #8618 issued 4-2-01 to Bourbon Street.
Office Staff conference/action  3/28/2001 PART
Temp. Occ. Cert. #4500 will be extended for an additional period of 30 days from April 9, 2001, as per Jenifer G. Correction notice items have not been completed.
BLD-Final3/27/20013/27/20013/27/2001PFAIL
DetailsJim Sly
###-#### Phil Last corr notice (340) stated to complete prior corr noticeof which contractor did not have on site. 3/27/2001 3:41:37 PM 3/27/2001 3:42:28 PM
Fee Review-notes9/7/20009/7/20003/19/2001 DONE
Telephone call  3/8/2001 DONE
Talked w/Mark Bowen re: status of temp. occ.
Temporary occupancy  1/9/2001 PART
Temp. Occ. Cert. #4500 issued 1-9-01 to Bourbon Street.
FIRE-Final Inspection1/8/20011/8/20011/8/2001PPASS
DetailsRick Jackson
###-####
BLD-Final1/8/20011/8/20011/8/2001PPART
DetailsCarl Dependahl
###-#### c/n, ok for t/o 1/8/2001 6:30:24 PM
Routing - FIRE12/27/20001/2/20011/2/2001 PASS
plans routed to fire by Bldg reviewer for occupancy load revision. Approved without comments.
BLD-Final12/28/200012/29/200012/29/2000APART
DetailsJim Storey
phil ###-#### l/c for only one night 12/31/2000 12/29/2000 4:58:18 PM
FIRE-Final Inspection12/28/200012/28/200012/29/2000PPART
DetailsRick Jackson
###-#### reinspection phil//// okay to occupy for only 12/31 1/2/2001 8:33:00 AM
Plan Reviewer's activity  12/27/2000  
Drawings establishing allowable occupant loads were submitted. The following occupant load signs shall be posted: (1) Bar - "Maximum occupant load 71 with seating OR 152 standing only". (2) VIP Lounge - "Maximum occupant load 43 with seating OR 92 standing only".
FIRE-Final Inspection12/19/200012/19/200012/21/2000PFAIL
DetailsRick Jackson
PER PHIL FOR CONF//// met with architect about exiting and occupant loads 12/21/2000 10:36:06 AM
BLD-Conference12/14/200012/14/200012/14/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/14/2000 5:22:58 PM w/ YMC, want to install 3000kw heater a exit corridor, need hvac eng's ok
BLD-Framing/Rough-in12/13/200012/13/200012/13/2000PPART
DetailsCarl Dependahl
fire corridor-- frank ###-#### -re-insp, lid ok, need hvac letter 12/13/2000 5:56:12 PM
Override - Parcel Holds  12/13/2000  
BLD-Framing/Rough-in12/12/200012/12/200012/12/2000PPART
DetailsCarl Dependahl
fire corridor-- frank ###-####; need to submit re hvac at corridor 12/12/2000 5:24:30 PM
Override - Parcel Holds  12/12/2000  
Plan resubmittals received  12/11/2000 DONE
Received one copy of type II hood information. Routed to inspector. KMM
BLD-Framing/Rough-in12/6/200012/7/200012/7/2000APART
DetailsCarl Dependahl
provide info for type 2 hood, letter for menu (no meat fried??) need hvac designers letter for corridor penetrations, etc ok to begin cover 12/7/2000 12:26:26 PM
Override - Parcel Holds  12/6/2000  
Override - Parcel Holds  12/4/2000  
Issue PAID IN FULL permit  12/4/2000 DONE
Inspection Record Card- Bld  11/22/2000 DONE
Print Occupancy Form  11/22/2000 DONE
Routing - PLAN CHECK11/1/2000 11/21/2000 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/21/2000 PASS
Plan assigned to (CJW)10/5/2000 11/21/2000 PASS
DetailsCarl Westfall
11/21/00 10:29:29 CJW - activity updated through activity BLDA022 from case BLD00-02659.
Plan resubmittals received  11/17/2000 DONE
Received two copies or revised sheets A2.0, A2.1, one copy of plan review comments letter and two copies of supplemental calculations for Bourbon Street from Armstrong Architects. Routed to Carl W.
Routing - PUBLIC WORKS10/31/2000 11/1/2000 PASS
Routing - FIRE10/26/2000 10/31/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  10/31/2000  
Drawings failed 1st UBC review.
Routing - PLAN CHECK10/18/2000 10/26/2000  
Drawings failed first UBC plan review.
Plan Reviewer's activity  10/25/2000  
UBC plan review started October 25, 2000 and finished the next day. A response from the architect is required. See the conditions list.
Routing - PUBLIC WORKS10/16/2000 10/18/2000  
Failed 2nd PW review. MUST PASS A SIGHT INSPECTION AND FUTHER REVIEW BY PUBLIC WORKS, INACCORDANCE WITH LOUISE WALDORF. 10/18/00 DAR
Routing - PLAN CHECK10/6/2000 10/16/2000  
Routing - PUBLIC WORKS10/5/2000 10/6/2000  
Failed first PW review. ARCHITECT TO FURNISH MENU AND PLACEMENT OF DINNING AREA PER LOUISE WALDORF. 10/6/00 DAR
Routing - PLUMBING10/6/2000 10/6/2000 PASS
Plan routing begun/TENANTS  10/5/2000 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  9/29/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/13/2000  
REQUIRES STAMPED AND SIGNED PLUMBING PLANS. TARRIE BROUGHT IN ADDITIONAL INFO. THAT WAS REQUESTED ON 9/12/00 PLANS IN MY HOLD BOX. KMM
Plans ACCEPTED BY PLAN TECH  9/12/2000  
TARRIE OF ARMSTRON CAME AND TOOK PLANS. PLANS REQUIRE-
1. STAMPED AND SIGNED MECH. PLANS
2. STAMPED AND SIGNED COVER SHEET.
3. STAMPED AND SIGNED PLUMBING PLANS.
4. KITCHEN PLANS.
5. SOILS REPORT
6. INDICATE WHICH RESTAURANT IS WHICH.
7. PLANNING AND ZONING INFORMATION. KMM
Received Certificate of Value  9/7/2000 DONE
Application received  9/7/2000  
Recd Pcfee & Taken To Pln CK  9/7/2000 DONE