Case Summary (BLD) | | | 4/20/2005 | | DONE |
|
|
|
|
Fee Review-notes | 9/13/2001 | 9/13/2001 | 9/17/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/2/2001 | 4/2/2001 | | DONE |
|
|
|
|
BLD-Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PASS |
Carl Dependahl
|
|
|
phil ###-#### fn occ
|
Conference | 4/2/2001 | 4/2/2001 | 4/2/2001 | | PASS |
Carl Dependahl
|
|
|
Issued c/o to bourbon street and included letter of confermation that posted occupant load in assembly areas of first floor. 564 standing and 263 with seating would be adhered to. Present were Phil with simplot const. Carl Dependahl building inspector, George Slane supervisor and Jeniffer Gilliland PDS Deputy Director.
|
Permanent occupancy | | | 4/2/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8618 issued 4-2-01 to Bourbon Street.
|
Office Staff conference/action | | | 3/28/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4500 will be extended for an additional period of 30 days from April 9, 2001, as per Jenifer G. Correction notice items have not been completed.
|
BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Phil Last corr notice (340) stated to complete prior corr noticeof which contractor did not have on site. 3/27/2001 3:41:37 PM 3/27/2001 3:42:28 PM
|
Fee Review-notes | 9/7/2000 | 9/7/2000 | 3/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2001 | | DONE |
|
|
|
Talked w/Mark Bowen re: status of temp. occ.
|
Temporary occupancy | | | 1/9/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4500 issued 1-9-01 to Bourbon Street.
|
FIRE-Final Inspection | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### c/n, ok for t/o 1/8/2001 6:30:24 PM
|
Routing - FIRE | 12/27/2000 | 1/2/2001 | 1/2/2001 | | PASS |
|
|
|
plans routed to fire by Bldg reviewer for occupancy load revision. Approved without comments.
|
BLD-Final | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Jim Storey
|
|
|
phil ###-#### l/c for only one night 12/31/2000 12/29/2000 4:58:18 PM
|
FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/29/2000 | P | PART |
Rick Jackson
|
|
|
###-#### reinspection phil//// okay to occupy for only 12/31 1/2/2001 8:33:00 AM
|
Plan Reviewer's activity | | | 12/27/2000 | | |
|
|
|
Drawings establishing allowable occupant loads were submitted. The following occupant load signs shall be posted: (1) Bar - "Maximum occupant load 71 with seating OR 152 standing only". (2) VIP Lounge - "Maximum occupant load 43 with seating OR 92 standing only".
|
FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/21/2000 | P | FAIL |
Rick Jackson
|
|
|
PER PHIL FOR CONF//// met with architect about exiting and occupant loads 12/21/2000 10:36:06 AM
|
BLD-Conference | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/14/2000 5:22:58 PM w/ YMC, want to install 3000kw heater a exit corridor, need hvac eng's ok
|
BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Carl Dependahl
|
|
|
fire corridor-- frank ###-#### -re-insp, lid ok, need hvac letter 12/13/2000 5:56:12 PM
|
Override - Parcel Holds | | | 12/13/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Carl Dependahl
|
|
|
fire corridor-- frank ###-####; need to submit re hvac at corridor 12/12/2000 5:24:30 PM
|
Override - Parcel Holds | | | 12/12/2000 | | |
|
|
|
|
Plan resubmittals received | | | 12/11/2000 | | DONE |
|
|
|
Received one copy of type II hood information. Routed to inspector. KMM
|
BLD-Framing/Rough-in | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PART |
Carl Dependahl
|
|
|
provide info for type 2 hood, letter for menu (no meat fried??) need hvac designers letter for corridor penetrations, etc ok to begin cover 12/7/2000 12:26:26 PM
|
Override - Parcel Holds | | | 12/6/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/4/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/4/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/22/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/1/2000 | | 11/21/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2000 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 10/5/2000 | | 11/21/2000 | | PASS |
Carl Westfall
|
|
|
11/21/00 10:29:29 CJW - activity updated through activity BLDA022 from case BLD00-02659.
|
Plan resubmittals received | | | 11/17/2000 | | DONE |
|
|
|
Received two copies or revised sheets A2.0, A2.1, one copy of plan review comments letter and two copies of supplemental calculations for Bourbon Street from Armstrong Architects. Routed to Carl W.
|
Routing - PUBLIC WORKS | 10/31/2000 | | 11/1/2000 | | PASS |
|
|
|
|
Routing - FIRE | 10/26/2000 | | 10/31/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 10/31/2000 | | |
|
|
|
Drawings failed 1st UBC review.
|
Routing - PLAN CHECK | 10/18/2000 | | 10/26/2000 | | |
|
|
|
Drawings failed first UBC plan review.
|
Plan Reviewer's activity | | | 10/25/2000 | | |
|
|
|
UBC plan review started October 25, 2000 and finished the next day. A response from the architect is required. See the conditions list.
|
Routing - PUBLIC WORKS | 10/16/2000 | | 10/18/2000 | | |
|
|
|
Failed 2nd PW review. MUST PASS A SIGHT INSPECTION AND FUTHER REVIEW BY PUBLIC WORKS, INACCORDANCE WITH LOUISE WALDORF. 10/18/00 DAR
|
Routing - PLAN CHECK | 10/6/2000 | | 10/16/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/5/2000 | | 10/6/2000 | | |
|
|
|
Failed first PW review. ARCHITECT TO FURNISH MENU AND PLACEMENT OF DINNING AREA PER LOUISE WALDORF. 10/6/00 DAR
|
Routing - PLUMBING | 10/6/2000 | | 10/6/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 10/5/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 9/29/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2000 | | |
|
|
|
REQUIRES STAMPED AND SIGNED PLUMBING PLANS. TARRIE BROUGHT IN ADDITIONAL INFO. THAT WAS REQUESTED ON 9/12/00 PLANS IN MY HOLD BOX. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 9/12/2000 | | |
|
|
|
TARRIE OF ARMSTRON CAME AND TOOK PLANS. PLANS REQUIRE-
1. STAMPED AND SIGNED MECH. PLANS
2. STAMPED AND SIGNED COVER SHEET.
3. STAMPED AND SIGNED PLUMBING PLANS.
4. KITCHEN PLANS.
5. SOILS REPORT
6. INDICATE WHICH RESTAURANT IS WHICH.
7. PLANNING AND ZONING INFORMATION. KMM
|
Received Certificate of Value | | | 9/7/2000 | | DONE |
|
|
|
|
Application received | | | 9/7/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2000 | | DONE |
|
|
|
|