Case Summary (BLD) | | | 12/17/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/25/2003 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 1/2/2002 | | PASS |
|
|
|
Inspection made 9/17/01 - passed.
|
Fee Review-notes | 9/7/2000 | 9/7/2000 | 11/9/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/1/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8847 issued 10-1-01 to Capitol Development.
|
BLD-Final | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 10:14:16. Contact: ###-####. OK for perm Occ. 9/27/2001 3:36:13 PM
|
Permanent Occupancy | | 9/27/2001 | 9/27/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 9/26/2001 3:01:07 PM
|
Plan resubmittals received | | | 9/21/2001 | | DONE |
|
|
|
Received a copy of revised sheet A-1 from Jim Sly. Routed to Records. KMM
|
Plan resubmittals received | | | 9/19/2001 | | DONE |
|
|
|
Received three copies of revised sheet A-1. Routed to Jim Sly.
|
FIRE-Final Inspection | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Joe Tawney
|
|
|
Reinsp OK for temporary occupancy of 1st floor only. No occupancy of basement until exiting issues have been resolved 8/17/2001 3:22:15 PM
|
BLD-Final | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 10:37:53. Contact: ###-####. C/N...OK for Temp Occ. Floor plan change at Bsmnt Requires submit to plan check for plan Mod....Therefor No Occupancy of Bsmnt or exterior exitway (from bsmnt) allowed until new plans approved and inspection completed. 8/17/2001 4:22:45 PM
|
FIRE-Final Inspection | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 8/16/2001 10:21:34 AM
|
BLD-Final | 8/15/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 11:03:21. Contact: ###-####. C/N...Partial insp only....Architect to re-submit (plan Modification) Added basement walls, doors and omitted door at Bsmnt usable space. 8/16/2001 3:11:33 PM
|
Code Occupancy Approval | | | 8/15/2001 | | FAIL |
|
|
|
Bonded for sprinkler system, landscaping, H/C signs, bike rack - signed Temporary
|
BLD-Other | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 11:44:34. Contact: ###-####. Ceiling grid OK 7/30/2001 1:22:20 PM
|
BLD-Other | 6/27/2001 | 6/27/2001 | 6/27/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 06:56:37. Contact: ###-####. 6/27/2001 12:16:43 PM needs seismic pods 6/27/2001 12:19:22 PM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 12:04:21. Contact: ###-####. west side of stairs ok ,east side failed called contractor. 12/8/2001 10:58:05 AM
|
FIRE-Conference | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Joe Tawney
|
|
|
4/26/2001 8:58:04 AM Conf with contr on fire & life safety items for non spklr bldg 4/26/2001 8:58:54 AM
|
BLD-Framing/Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 10:45:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/11/2001 at 15:39:33. Contact: ###-####. C/N Trusses. 4/12/2001 10:50:58 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 13:14:28. Contact: ###-####. EXT SHEAR PANELS OK TO COVER ALSO CHECK INT SHEAR PANELS ON EXT WALL ALL OK ALSO CHECKED ITER SHEAR WALL HOLD DOWNS AND EAST SIDE SHEETING AND NAILING OK 3/30/2001 10:40:07 AM
|
BLD-Framing/Rough-in | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 09:24:18. Contact: ###-####. nail at top blocking front wall line. 3/26/2001 3:59:47 PM
|
BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | NR |
Jim Sly
|
|
|
###-#### Need to nail shear panels and bolt/nut HD's. 3/20/2001 2:43:32 PM
|
BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 07:13:15. Contact: ###-####. Conf on Bsmnt Usable space and misc. 3/6/2001 10:08:29 AM
|
BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 08:04:22. Contact: ###-####. Insp of floor and floor nailing.....appears OK. 2/28/2001 1:30:15 PM
|
BLD-Footing | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:17:07. Contact: ###-####. Remainder of found wall OK pend special insp and appr. 2/15/2001 12:42:16 PM
|
BLD-Footing | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 07:08:07. Contact: ###-####. Footing for East 1/2 of bldg OK pend special insp and appr. 2/9/2001 2:26:37 PM
|
BLD-Footing | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:05:37. Contact: ###-####. Footing for area other than Bsmnt OK pending special insp and appr. 2/7/2001 6:59:37 PM
|
BLD-Foundation | 1/31/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Jim Sly
|
|
|
###-#### pouring at 1 Bsmnt walls OK pend special insp and appr. 2/1/2001 11:16:36 AM
|
Receive PAYMENT IN FULL PRINT | | | 1/29/2001 | | DONE |
|
|
|
|
Routing - FIRE | 1/22/2001 | | 1/26/2001 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Routing - PLAN CHECK | 1/26/2001 | | 1/26/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/26/2001 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 1/26/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan assigned to (M_P) | 1/9/2001 | | 1/26/2001 | | PASS |
Mike Phillips
|
|
|
1/26/2001 13:16:03 M_P - activity updated through activity BLDA022 from case BLD00-02660.
|
Plan Reviewer's activity | | | 1/25/2001 | | PEND |
|
|
|
Waiting for others to approve.
|
BLD-Foundation | 1/22/2001 | 1/24/2001 | 1/24/2001 | A | PART |
Jim Sly
|
|
|
###-#### will pour at 10:00 Foot OK pend special insp and test appr. 1/24/2001 1:24:17 PM
|
Plan resubmittals received | | | 1/24/2001 | | DONE |
|
|
|
Plan Modification. Received two copies of revised sheets A-1R, A-21R, R-5R. ans one copy of engineering from Stapley Eng. Routed to Mike P. KMM
|
BLD-Conference | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Sly
|
|
|
###-#### Re-submittal for plan modification and notified to not go beyond what's approved. 1/23/2001 2:14:28 PM
|
Override - Parcel Holds | | | 1/23/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/22/2001 | | FAIL |
|
|
|
PLAN MODIFICATION: Need calculations to reflect second floor storage lateral.
|
Override - Parcel Holds | | | 1/22/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 1/10/2001 | | 1/22/2001 | | |
|
|
|
PLAN MODIFICATION. KMM
Routing to fire. 1/22/01
|
Routing - PUBLIC WORKS | 1/9/2001 | | 1/10/2001 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Routing - PLANNING | 1/10/2001 | | 1/10/2001 | | PASS |
|
|
|
Approved; in compliance with DRH00-130.
|
Routing - PLUMBING | 1/10/2001 | | 1/10/2001 | | PASS |
|
|
|
PLAN MODIFICATION. KMM if areaway drain is piped to the stormwater system provide a backwater vcalve for it. conflict with water service BFP and floor drain to be handled in the field.
|
Plans ACCEPTED BY PLAN TECH | | | 1/9/2001 | | DONE |
|
|
|
PLAN MODIFICATION. ARE THERE ANY CALCS. ? CONTACTED ROGER FORSTER. ROGER STATED ENG. SAID NO NEW CALCS. KMM
|
Plan routing begun/NEW & ADDTN | | | 1/9/2001 | | DONE |
|
|
|
PLAN MODIFICATION. KMM
|
CHANGE STATUS TO (PND) | | | 1/8/2001 | | DONE |
|
|
|
|
BLD-Conference | 1/2/2001 | 1/3/2001 | 1/3/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 17:04:20. Contact: ###-####.
|
(F) Reprint permit | | | 12/1/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2000 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 11/30/2000 | | |
|
|
|
|
Print Occupancy Form | | | 11/22/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2000 | | DONE |
|
|
|
called permit ready
|
Routing - PLAN CHECK | 11/13/2000 | | 11/21/2000 | | DONE |
|
|
|
TOOK TO MIKE PHILLIPS
|
Plan Reviewer's activity | | | 11/21/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/12/2000 | | 11/21/2000 | | PASS |
Mike Phillips
|
|
|
11/21/2000 10:55:49 M_P - activity updated through activity BLDA022 from case BLD00-02660.
|
Routing - FIRE | 11/8/2000 | | 11/13/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/8/2000 | | DONE |
|
|
|
Received two copies of revised site plans with existing fire hydrant (sheet SD-1) and two copies of United Water letter verifying available water. Routed to Mike P. KMM
|
Plan resubmittals received | | | 11/8/2000 | | DONE |
|
|
|
Received plan resubmittals from BRS Architects,small documents plus two sets of plans CS-1, S2.3, A-1 and A-12, forwarded same to Mike Phillips. 11/8/00 DAR
|
Routing - FIRE | 11/1/2000 | 11/6/2000 | 11/6/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant and fire flows for this unprotected building.
|
Plan Review Completed(1st rev) | | | 11/6/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/19/2000 | | 11/1/2000 | | FAIL |
|
|
|
ROUTING TO FIRE.
|
Plan Reviewer's activity | | | 11/1/2000 | | FAIL |
|
|
|
ADDITIONAL INFORMAITON REQUIRED FOR FOLLOW UP REVIEW.
|
Routing - PUBLIC WORKS | 10/19/2000 | | 10/19/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/17/2000 | | 10/18/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION AND GEOTECH REPORT, PER BRIAN MURPHY. 10/18.00 DAR
|
Routing - PLAN CHECK | 10/9/2000 | | 10/17/2000 | | FAIL |
|
|
|
Routing to P.W. for follow up.
|
Routing - PLUMBING | 9/29/2000 | | 10/9/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/9/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS,ROGER FOSTER, TWO SETS OF SHEETS P1.0 AND GRD. FORWARDED SAME TO MIKE PHILLIPS. 10/9/00 DAR
|
Routing - PLANNING | 9/21/2000 | | 9/29/2000 | | PASS |
|
|
|
See approval in DRH00-130
|
Routing - PUBLIC WORKS | 9/13/2000 | | 9/20/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS AND A GEO-TECH REPORT PER BRIAN MURPHY. 9/21/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2000 | | DONE |
|
|
|
|
Pending Assignment by MYS | 9/7/2000 | | 9/12/2000 | | DONE |
Marlene Southard
|
|
|
9/12/00 15:43:56 JCM - activity updated through activity BLDA170 from case BLD00-02660.
|
Application received | | | 9/7/2000 | | |
|
|
|
|