Permit Information
Permit NumberBLD00-02660
StatusFinaled
Name BOISE RESEARCH CENTER INC
Site Address 6232 N MEEKER PL
Project NameCAPITAL DEVELOPMENT
Customer Number2K032
ePlanReviewNo
Description
CAPITAL DEVELOPMENT OFFICE BUILDING * TO CONSTRUCT A NEW 7,132 SQ,FT. MULTI-TENANT, OFFICE BUILDING WITH A 1,300 SQ.FT. BASEMENT. 2,880 SQ.FT IS BEING FINISHED FOR A TENANT ALONG WITH 1,050 SQ.FT FOR COMMON ENTRY AND RESTROOMS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND CABO/ANSI A117.1. ADDITIONAL WORK COVERED IN THIS PERMIT IS RELATED ON SITE PARKING LOT AND LAND SCAPING. DRH00-00130, PC#728-00, MJP MODIFICATION *** 1/22/01 To modify the west basement wall and make an exit stair, create a 900 sq.ft. attic space for mechanical room and general office area, relocate mechanical equipment from basement to attic area. All work per the approved plans. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/17/2015 DONE
Case Summary (BLD)  6/25/2003 DONE
Code Occupancy Approval  1/2/2002 PASS
Inspection made 9/17/01 - passed.
Fee Review-notes9/7/20009/7/200011/9/2001 DONE
Permanent occupancy  10/1/2001 DONE
Perm. Occ. Cert. #8847 issued 10-1-01 to Capitol Development.
BLD-Final9/27/20019/27/20019/27/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/27/2001 at 10:14:16. Contact: ###-####. OK for perm Occ. 9/27/2001 3:36:13 PM
Permanent Occupancy 9/27/20019/27/2001 DONE
Details
FIRE-Final Inspection9/26/20019/26/20019/26/2001PPASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 9/26/2001 3:01:07 PM
Plan resubmittals received  9/21/2001 DONE
Received a copy of revised sheet A-1 from Jim Sly. Routed to Records. KMM
Plan resubmittals received  9/19/2001 DONE
Received three copies of revised sheet A-1. Routed to Jim Sly.
FIRE-Final Inspection8/17/20018/17/20018/17/2001PPART
DetailsJoe Tawney
Reinsp OK for temporary occupancy of 1st floor only. No occupancy of basement until exiting issues have been resolved 8/17/2001 3:22:15 PM
BLD-Final8/17/20018/17/20018/17/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/17/2001 at 10:37:53. Contact: ###-####. C/N...OK for Temp Occ. Floor plan change at Bsmnt Requires submit to plan check for plan Mod....Therefor No Occupancy of Bsmnt or exterior exitway (from bsmnt) allowed until new plans approved and inspection completed. 8/17/2001 4:22:45 PM
FIRE-Final Inspection8/15/20018/16/20018/16/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 8/16/2001 10:21:34 AM
BLD-Final8/15/20018/16/20018/16/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/15/2001 at 11:03:21. Contact: ###-####. C/N...Partial insp only....Architect to re-submit (plan Modification) Added basement walls, doors and omitted door at Bsmnt usable space. 8/16/2001 3:11:33 PM
Code Occupancy Approval  8/15/2001 FAIL
Bonded for sprinkler system, landscaping, H/C signs, bike rack - signed Temporary
BLD-Other7/27/20017/30/20017/30/2001APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/27/2001 at 11:44:34. Contact: ###-####. Ceiling grid OK 7/30/2001 1:22:20 PM
BLD-Other6/27/20016/27/20016/27/2001AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/27/2001 at 06:56:37. Contact: ###-####. 6/27/2001 12:16:43 PM needs seismic pods 6/27/2001 12:19:22 PM
BLD-Framing/Rough-in5/7/20015/8/20015/8/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/07/2001 at 12:04:21. Contact: ###-####. west side of stairs ok ,east side failed called contractor. 12/8/2001 10:58:05 AM
FIRE-Conference4/25/20014/25/20014/25/2001PPASS
DetailsJoe Tawney
4/26/2001 8:58:04 AM Conf with contr on fire & life safety items for non spklr bldg 4/26/2001 8:58:54 AM
BLD-Framing/Rough-in4/13/20014/13/20014/13/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/13/2001 at 10:45:28. Contact: ###-####.
BLD-Framing/Rough-in4/11/20014/12/20014/12/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/11/2001 at 15:39:33. Contact: ###-####. C/N Trusses. 4/12/2001 10:50:58 PM
BLD-Framing/Rough-in3/29/20013/30/20013/30/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/29/2001 at 13:14:28. Contact: ###-####. EXT SHEAR PANELS OK TO COVER ALSO CHECK INT SHEAR PANELS ON EXT WALL ALL OK ALSO CHECKED ITER SHEAR WALL HOLD DOWNS AND EAST SIDE SHEETING AND NAILING OK 3/30/2001 10:40:07 AM
BLD-Framing/Rough-in3/26/20013/26/20013/26/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/26/2001 at 09:24:18. Contact: ###-####. nail at top blocking front wall line. 3/26/2001 3:59:47 PM
BLD-Framing/Rough-in3/20/20013/20/20013/20/2001PNR
DetailsJim Sly
###-#### Need to nail shear panels and bolt/nut HD's. 3/20/2001 2:43:32 PM
BLD-Conference3/6/20013/6/20013/6/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/06/2001 at 07:13:15. Contact: ###-####. Conf on Bsmnt Usable space and misc. 3/6/2001 10:08:29 AM
BLD-Framing/Rough-in2/28/20012/28/20012/28/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/28/2001 at 08:04:22. Contact: ###-####. Insp of floor and floor nailing.....appears OK. 2/28/2001 1:30:15 PM
BLD-Footing2/15/20012/15/20012/15/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/15/2001 at 08:17:07. Contact: ###-####. Remainder of found wall OK pend special insp and appr. 2/15/2001 12:42:16 PM
BLD-Footing2/9/20012/9/20012/9/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/09/2001 at 07:08:07. Contact: ###-####. Footing for East 1/2 of bldg OK pend special insp and appr. 2/9/2001 2:26:37 PM
BLD-Footing2/7/20012/7/20012/7/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/07/2001 at 09:05:37. Contact: ###-####. Footing for area other than Bsmnt OK pending special insp and appr. 2/7/2001 6:59:37 PM
BLD-Foundation1/31/20012/1/20012/1/2001PPART
DetailsJim Sly
###-#### pouring at 1 Bsmnt walls OK pend special insp and appr. 2/1/2001 11:16:36 AM
Receive PAYMENT IN FULL PRINT  1/29/2001 DONE
Routing - FIRE1/22/2001 1/26/2001 PASS
PLAN MODIFICATION. KMM
Routing - PLAN CHECK1/26/2001 1/26/2001 DONE
Plan Reviewer's activity  1/26/2001 PASS
Override - Parcel Holds  1/26/2001  
PLANS/APPL TAKEN TO FRONT DESK  1/26/2001 DONE
Inspection Record Card- Bld  1/26/2001 DONE
Print Occupancy Form  1/26/2001 DONE
Telephone call  1/26/2001 DONE
LEFT MESS THAT PERMIT IS READY
Plan assigned to (M_P)1/9/2001 1/26/2001 PASS
DetailsMike Phillips
1/26/2001 13:16:03 M_P - activity updated through activity BLDA022 from case BLD00-02660.
Plan Reviewer's activity  1/25/2001 PEND
Waiting for others to approve.
BLD-Foundation1/22/20011/24/20011/24/2001APART
DetailsJim Sly
###-#### will pour at 10:00 Foot OK pend special insp and test appr. 1/24/2001 1:24:17 PM
Plan resubmittals received  1/24/2001 DONE
Plan Modification. Received two copies of revised sheets A-1R, A-21R, R-5R. ans one copy of engineering from Stapley Eng. Routed to Mike P. KMM
BLD-Conference1/23/20011/23/20011/23/2001PPART
DetailsJim Sly
###-#### Re-submittal for plan modification and notified to not go beyond what's approved. 1/23/2001 2:14:28 PM
Override - Parcel Holds  1/23/2001  
Plan Reviewer's activity  1/22/2001 FAIL
PLAN MODIFICATION: Need calculations to reflect second floor storage lateral.
Override - Parcel Holds  1/22/2001  
Routing - PLAN CHECK1/10/2001 1/22/2001  
PLAN MODIFICATION. KMM
Routing to fire. 1/22/01
Routing - PUBLIC WORKS1/9/2001 1/10/2001 PASS
PLAN MODIFICATION. KMM
Routing - PLANNING1/10/2001 1/10/2001 PASS
Approved; in compliance with DRH00-130.
Routing - PLUMBING1/10/2001 1/10/2001 PASS
PLAN MODIFICATION. KMM if areaway drain is piped to the stormwater system provide a backwater vcalve for it. conflict with water service BFP and floor drain to be handled in the field.
Plans ACCEPTED BY PLAN TECH  1/9/2001 DONE
PLAN MODIFICATION. ARE THERE ANY CALCS. ? CONTACTED ROGER FORSTER. ROGER STATED ENG. SAID NO NEW CALCS. KMM
Plan routing begun/NEW & ADDTN  1/9/2001 DONE
PLAN MODIFICATION. KMM
CHANGE STATUS TO (PND)  1/8/2001 DONE
BLD-Conference1/2/20011/3/20011/3/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/02/2001 at 17:04:20. Contact: ###-####.
(F) Reprint permit  12/1/2000 DONE
Issue PAID IN FULL permit  11/30/2000 DONE
CHANGE ISSUED DATE  11/30/2000  
Print Occupancy Form  11/22/2000 DONE
Inspection Record Card- Bld  11/22/2000 DONE
Telephone call  11/22/2000 DONE
called permit ready
Routing - PLAN CHECK11/13/2000 11/21/2000 DONE
TOOK TO MIKE PHILLIPS
Plan Reviewer's activity  11/21/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/21/2000 DONE
Plan assigned to (M_P)9/12/2000 11/21/2000 PASS
DetailsMike Phillips
11/21/2000 10:55:49 M_P - activity updated through activity BLDA022 from case BLD00-02660.
Routing - FIRE11/8/2000 11/13/2000 PASS
Plan resubmittals received  11/8/2000 DONE
Received two copies of revised site plans with existing fire hydrant (sheet SD-1) and two copies of United Water letter verifying available water. Routed to Mike P. KMM
Plan resubmittals received  11/8/2000 DONE
Received plan resubmittals from BRS Architects,small documents plus two sets of plans CS-1, S2.3, A-1 and A-12, forwarded same to Mike Phillips. 11/8/00 DAR
Routing - FIRE11/1/200011/6/200011/6/2000 FAIL
DetailsBill Alexander
Lack hydrant and fire flows for this unprotected building.
Plan Review Completed(1st rev)  11/6/2000 FAIL
Routing - PLAN CHECK10/19/2000 11/1/2000 FAIL
ROUTING TO FIRE.
Plan Reviewer's activity  11/1/2000 FAIL
ADDITIONAL INFORMAITON REQUIRED FOR FOLLOW UP REVIEW.
Routing - PUBLIC WORKS10/19/2000 10/19/2000 PASS
Routing - PUBLIC WORKS10/17/2000 10/18/2000 FAIL
REQUIRES DRAINAGE PLAN REVISION AND GEOTECH REPORT, PER BRIAN MURPHY. 10/18.00 DAR
Routing - PLAN CHECK10/9/2000 10/17/2000 FAIL
Routing to P.W. for follow up.
Routing - PLUMBING9/29/2000 10/9/2000 PASS
Plan resubmittals received  10/9/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS,ROGER FOSTER, TWO SETS OF SHEETS P1.0 AND GRD. FORWARDED SAME TO MIKE PHILLIPS. 10/9/00 DAR
Routing - PLANNING9/21/2000 9/29/2000 PASS
See approval in DRH00-130
Routing - PUBLIC WORKS9/13/2000 9/20/2000 FAIL
REQUIRES DRAINAGE PLAN REVISIONS AND A GEO-TECH REPORT PER BRIAN MURPHY. 9/21/00 DAR
Plans ACCEPTED BY PLAN TECH  9/13/2000 DONE
Pending Assignment by MYS9/7/2000 9/12/2000 DONE
DetailsMarlene Southard
9/12/00 15:43:56 JCM - activity updated through activity BLDA170 from case BLD00-02660.
Application received  9/7/2000