BLD-Framing/Rough-in | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Carl Dependahl
|
|
|
PER JIM SLY FIRE WALL BETWEEN HOUSE & TRAILER- BEN ###-####. reasigned by 325.
|
BLD-Foundation | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | CANC |
Jim Sly
|
|
|
fire wall insp Benny ###-####
|
BLD-Foundation | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | CANC |
Jim Sly
|
|
|
fire wall insp Benny ###-####
|
BLD-Foundation | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Steven Webb
|
|
|
STEM WALL ###-#### appears ok, ground for electrical verified. 12/6/2000 9:57:47 AM
|
BLD-Footing | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Carl Dependahl
|
|
|
ft insp --###-####- benny, appears ok, rebar in 11/29/2000 4:24:30 PM
|
Issue PAID IN FULL permit | | | 11/9/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/7/2000 | 11/7/2000 | 11/7/2000 | | PASS |
Dan Overy
|
|
|
11/7/2000 15:08:20 DJO - activity updated through activity BLDA022 from case BLD00-02682.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/7/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/7/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2000 | | DONE |
|
|
|
CALLED GAVE DOLLAR AMOUNT
|
Plans ACCEPTED BY PLAN CHECK | | | 11/7/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2000 | 10/30/2000 | 10/31/2000 | | PASS |
|
|
|
tap permit is required
|
Routing - PLANNING | 10/26/2000 | 10/30/2000 | 10/30/2000 | | PASS |
|
|
|
|
Application received | | | 9/8/2000 | | |
|
|
|
came in 9/8/00
|
Routing - PLAN CHECK | 10/31/2000 | 10/31/2000 | | | PEND |
|
|
|
|
Routing - PLANNING | 9/11/2000 | 9/11/2000 | | | FAIL |
|
|
|
Need Reduction in Density Survey prior to issuance of Building Permit. Property has a lot line in the middle. The new building would be located on the lot line.PLAN IN REJECTED DRAWER.
|
Pending Assignment by DJO | 9/8/2000 | | | | PEND |
Dan Overy
|
|
|
|