BLD-Final | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 12:56:37. Contact: ###-####. C C issued. 4/24/2001 11:13:26 AM
|
DOC - Permit Finaled | 4/24/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 4/24/2001 11:13:06 AM
|
BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 16:07:02. Contact: ###-####. C/N issued. 4/23/2001 11:56:18 AM
|
BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 08:19:41. Contact: ###-####. NR 4/17/2001 5:38:04 PM
|
BLD-Energy code compliance | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 12:44:43. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:31:44. Contact: ###-####. shear OK.... 2/7/2001 6:58:25 PM
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 09:36:19. Contact: ###-####. shear panel inspection need to add panel need to nail one and need straps on bay window 2/6/2001 4:48:49 PM
|
BLD-Foundation | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PART |
Dave Hannah
|
|
|
Bob ###-####
|
BLD-Footing | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | PASS |
Jim Sly
|
|
|
ft insp-- ###-####
|
BLD-Foundation | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Jim Sly
|
|
|
basement wall cal ###-####
|
BLD-Footing | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PART |
Dave Hannah
|
|
|
bob ###-####. Basement only.
|
Issue PAID IN FULL permit | | | 10/11/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 10/9/2000 | 10/9/2000 | 10/10/2000 | | PASS |
Dan Overy
|
|
|
10/10/2000 11:20:07 DJO - activity updated through activity BLDA022 from case BLD00-02689.
|
Plan assigned to (DJO) | 10/6/2000 | 10/6/2000 | 10/10/2000 | | PASS |
Dan Overy
|
|
|
10/10/2000 11:20:06 DJO - activity updated through activity BLDA022 from case BLD00-02689.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2000 | | DONE |
|
|
|
called permit ready
|
Plans ACCEPTED BY PLAN CHECK | | | 10/9/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/9/2000 | | PEND |
|
|
|
have located brg situation that needs corrected. dave millett will provide addendum to address problem. panels at rear of house will be enlarged to obtain cond. 2.22-27.
|
Print Pending Permit.LaserJet4 | | | 10/9/2000 | | PEND |
|
|
|
|
Plan Review Report | | | 10/9/2000 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 9/12/2000 | 9/12/2000 | 10/6/2000 | | PASS |
|
|
|
different house
|
Plans ACCEPTED BY PLAN CHECK | | | 10/6/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2000 | 9/11/2000 | 9/12/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 9/11/2000 | 9/11/2000 | 9/12/2000 | | PASS |
|
|
|
|
Application received | | | 9/11/2000 | | |
|
|
|
|
Pending Assignment by DJO | 9/11/2000 | | | | PEND |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | | | |
|
|
|
called designer with shear and brg problems and was informed that todd amyx was no longer going to build this house and would submit new plans for a different home on the same lot & block. new plans received befor lunch and routed to planning & zoning for setback review. advised todd that i would start review monday the 9th of october.
|