Permit Information
Permit NumberBLD00-02694
StatusExpired
Name IDAHO COMMERCIAL CONSTRUCTION
Site Address 8049 W EMERALD ST
Project NameBOISE TOWN PLAZA
Customer Number991201
ePlanReviewNo
Description
SHOPS AT BOISE TOWN PLAZA, GRADING PERMIT, TO GRUB, CLEAN, EXCAVATE, GRADE, IMPORT AND COMPACT SITE MATERIALS IN PREPARATION FOR THE FUTURE CONSTRUCTIONOR THE SHOPS AT BOISE TOWN PLAZA. NO STRUCTURAL CONSTRUCTION IS ALLOWED UNDER THIS PERMIT. ALL GRADING IS SUBJECT TO THE GRADING AND DRAINAGE PLANS APPROVED BY THE PUBLIC WORKS DEPARTMENT. PC#723, DRH00-00041 DAR
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/14/20021/14/20021/14/2002 PART
DetailsRuss Owen
this does not req inspections from the structural division. 1/14/2002 10:20:55 AM
DOC - Permit Expired1/14/20021/14/20021/14/2002APASS
DetailsRuss Owen
Expired by inspector at 1/14/2002 10:20:55 AM
FIRE-Alarm Testing10/24/200110/26/200110/26/2001ACANC
DetailsTroy Cobbley
wrong permit number, inspection was for fire alarm 10/26/2001 8:14:50 AM
PubWorks Occupancy Approval  10/25/2001 DONE
Signed Permanent Occupancy 10/25/01. G.Fitts
BLD-Aging Inspection8/29/20018/29/20018/29/2001 PART
DetailsRuss Owen
BLD-Aging Inspection6/29/20016/29/20016/29/2001 PART
DetailsRuss Owen
wip expires 9/26/01. 6/29/2001 9:24:25 AM
Issue PAID IN FULL permit  3/30/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/29/2001 PASS
Print Pending Permit.LaserJet4  3/29/2001 PASS
Inspection Record Card- Bld  3/29/2001 DONE
Print Occupancy Form  3/29/2001 DONE
Telephone call  3/29/2001 DONE
called Skip Hyde ###-####
Routing - FIRE3/23/2001 3/28/2001 PASS
Second Submittal
Routing - PLUMBING3/21/2001 3/23/2001 PASS
Second Submittal cleanouts required every 100' on sewer services, vents required downstream of grease interceptors
Routing - PUBLIC WORKS3/19/2001 3/21/2001 FAIL
Second Submittal. Requires drainage plan revision, per Brian Murphy. 3/21/01
Routing - PLANNING3/21/2001 3/21/2001 SUBM
Approved per DRH00-41 and DRH01-35 for grading permit only.Second Submittal
Plans ACCEPTED BY PLAN TECH  3/19/2001 DONE
Second submittal
CHANGE STATUS TO (PND)  2/2/2001 DONE
per JCM
PLANS/APPL TAKEN TO FRONT DESK  10/10/2000 PASS
Inspection Record Card- Bld  10/10/2000 DONE
Telephone call  10/10/2000 DONE
called permit ready
Routing - FIRE10/9/2000 10/10/2000 PASS
Resubmittal info acceptable.
Routing - PLAN CHECK9/29/2000 10/9/2000  
Plan resubmittals received  10/5/2000 DONE
RECEIVED 3 SETS OF RESUBMITTALS FROM ERSTAD THORTON ARCHITECTS, SHEETS A2.11 AND A2.12 , FORWARDED SAME TO JOHN MENARD. 10/5/00 DAR
Routing - PLAN CHECK9/25/2000 9/29/2000  
Routing - PUBLIC WORKS9/29/2000 9/29/2000 PASS
Plan Review Completed(1st rev)  9/22/2000 FAIL
failed fire review
Routing - PLUMBING9/15/2000 9/19/2000 PASS
route to PW when back from plumb. kmm per plans and 97 upc
Routing - PLANNING9/14/2000 9/15/2000 PASS
Approved per DRH00-41.
Routing - PUBLIC WORKS9/12/2000 9/14/2000 FAIL
REQUIRES STREET LIGHT PLAN. PER BILL COLSON. KMM
Application received  9/12/2000 FAIL
review faxed to architect
Plans ACCEPTED BY PLAN TECH  9/12/2000 DONE
Plan assigned to (DAR)9/12/2000 9/12/2000 PASS
Plan resubmittals received    
Print Pending Permit.LaserJet4     
Routing - PUBLIC WORKS3/28/2001    
second submittal
Routing - PLAN CHECK3/28/2001