Fee Review-notes | 6/30/2003 | 6/30/2003 | 6/30/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/6/2001 | 4/6/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/6/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8623 issued 4-6-01 to Bombay at Boise Towne Square.
|
FIRE-Final Inspection | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Joe Tawney
|
|
|
4/5/2001 6:11:53 PM Final OK for permanant occupancy 4/5/2001 6:12:10 PM
|
BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:29:23. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | NR |
Carl Dependahl
|
|
|
###-####; unable to contact 4/2/2001 5:21:47 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 4/2/2001 4:28:20 PM
|
BLD-Other | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 07:36:13. Contact: ###-####.ok except not done in hallway will check at next insp. 3/30/2001 3:27:10 PM
|
BLD-Other | 3/28/2001 | 3/29/2001 | 3/29/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 14:15:11. Contact: ###-####. grid needs perimeter wires with-in 8 in of walls. c/n. 3/29/2001 12:21:34 PM
|
FIRE-Sprinkler Rough-in | 3/7/2001 | 3/8/2001 | 3/7/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 07:37:54. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/07/2001 at 07:45:14.
|
FIRE-Sprinkler Rough-in | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Joe Tawney
|
|
|
OK on spklr rough in 3/8/2001 8:19:35 AM
|
BLD-Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Russ Owen
|
|
|
Bill Boettcher, ###-####framing not final. 2/27/2001 2:02:51 PM
|
Plan resubmittals received | | | 2/26/2001 | | DONE |
|
|
|
Received two copies of structt. drawings S1, S2 and S3. One copy of Supplemental Struct. Calcs. Routed to Carl D. KMM
|
BLD-Conference | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 16:46:54. Contact: ###-####.rear hallway is not required to be rated. 2/22/2001 12:22:11 PM
|
BLD-Conference | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/21/2001 5:04:14 PM w/ bldr re combustibles/backing req'd
|
Issue PAID IN FULL permit | | | 2/1/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2001 | | DONE |
|
|
|
left mess for becky in texas /1/817/339/3734 that permit is ready
|
Inspection Record Card- Bld | | | 11/30/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/30/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2000 | | DONE |
|
|
|
called gave dollar amount
|
Routing - FIRE | 11/29/2000 | 11/29/2000 | 11/29/2000 | | PASS |
Bill Alexander
|
|
|
|
Case Summary (BLD) | | | 11/29/2000 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2000 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 11/29/2000 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 11/29/2000 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 9/21/2000 | | 11/29/2000 | | PASS |
|
|
|
11/29/2000 16:06:59 RMH - activity updated through activity BLDA022 from case BLD00-02725.
|
Plan resubmittals received | | | 11/28/2000 | | DONE |
|
|
|
Received one copy of plan review comments. Three copies of stamped and signed shelving details with calculations. One copy of sheet S1, S2, S3, not stamped or signed. Routed to Ron Hill. KMM
|
Plan resubmittals received | | | 11/22/2000 | | DONE |
|
|
|
Received three copies of revised sheets CVR, D1, A1, A1.1, A1.2, A2, A2.1, A3, A3.1, A7, A8, M1, E1, E2 routed to Ron Hill. KMM
|
Plan Review Completed(1st rev) | | | 10/27/2000 | | FAIL |
|
|
|
|
Routing - FIRE | 10/24/2000 | 10/27/2000 | 10/27/2000 | | FAIL |
Bill Alexander
|
|
|
Lack exiting requirements UFC Table 10-A. Other related issues with the UBC
|
Plan Reviewer's activity | | | 10/24/2000 | | FAIL |
Ron Hill
|
|
|
Faxed requirements to the architect, route to fire deaprtment.
|
Case Summary (BLD) | | | 10/24/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/22/2000 | | 10/24/2000 | | FAIL |
Ron Hill
|
|
|
Route to fire department.
|
Routing - PUBLIC WORKS | 9/21/2000 | | 9/22/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 9/21/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2000 | | DONE |
|
|
|
|
Application received | | | 9/13/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 10/27/2000 | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|